| Sl No | Description | Qty | Unit | MS DEVA AND SONS L1 | M/s. Ngangbam Premananda Singh L2 |
|---|---|---|---|---|---|
| 1.00SCHEDULE A PART - I (ANNUAL MAINTENANCE CONTRACT FOR EXISTING WATER PUMPS) | |||||
| 1.01 | Annual maintenance Contract for Centrifugal Pumps (15HP to 30HP) installed at 46 Assam Rifles alongwith its connected works with qtrly visting with following works
(a) Every Machine shall be serviced/checked at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, Engr-in- charge location.
(b) Quarterly Preventive maintainance shall include at least the fwg services:
(c) Replacement of Coupling if found damaged. unusable.
(d) Check pump bearing if found damaged./ unusable etc
(e) Checking pump bushing,wear ring, bearing cover, suction nozle
(f) Checking of impellers and sleeves.
(g) Checking of motor winding , electrical connection and bearing of motor
(h) Checking any type of electrical starter
(j) Checking of the motors fans
(k) Replacement of any component of pumps (Pump,Motor and electrical connections etc) found defective after the abvoe checks and tests. | 2 | Each | 10,390 ₹10,390 Lowest | 10,400 ₹10,400 |
| 1.02 | The spares replaced of Centrifugal Pumps (15HP to 30HP) under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Pump Impeller (b) Pump bearing (c) Motor bearing (d) Shaft sleeves (e) Shaft Key (F) Pump bushes (G) Pump Coupling (h) Bearing Cover (j) Starter (k) Motor Winding (l) Casing Packing | 2 | Job | 62,340 ₹62,340 Lowest | 62,400 ₹62,400 |
| 1.03 | Annual maintenance Contract for Centrifugal Pumps (05HP to 12.5HP) installed at 46 Assam Rifles alongwith its connected works with qtrly visting with following works -
(a) Every Machine shall be serviced/checked at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, Engr-in- charge location.
(b) Quarterly Preventive maintainance shall include at least the fwg services:
(c) Replacement of Coupling if found damaged./ unusable.
(d) Check pump bearing if found damaged./ unusable etc
(e) Checking pump bushing,wear ring, bearing cover, suction nozle
(f) Checking of impellers and sleeves.
(g) Checking of motor winding , electrical connection and bearing of motor
(h) Checking any type of electrical starter
(j) Checking of the motors fans
(k) Replacement of any component of pumps (Pump,Motor and electrical connections etc) found defective after the abvoe checks and tests. | 2 | Each | 6,234 ₹6,234 Lowest | 6,300 ₹6,300 |
| 1.04 | The spares replaced of Centrifugal Pumps (05HP to 12.5HP) under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Pump Impeller (b) Pump bearing (c) Motor bearing (d) Shaft sleeves (e) Shaft Key (F) Pump bushes (G) Pump Coupling (h) Bearing Cover (j) Starter (k) Motor Winding (l) Casing Packing | 2 | Job | 49,872 ₹49,872 Lowest | 50,000 ₹50,000 |
| 1.05 | Annual maintenance Contract for Submersible Pumps (02HP to 05HP) installed at 46 Assam Rifles alongwith its connected works with qtrly visting with following works -
(a) Every Machine shall be serviced/checked at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence,Engr-in- charge location.
(b) Quarterly Preventive maintainance shall include at least the fwg services:
(c) Replacement of Coupling if found damaged./ unusable.
(d) Check pump bearing if found damaged./ unusable etc
(e) Checking pump bushing,wear ring, bearing cover, suction nozle
(f) Checking of impellers and sleeves.
(g) Checking of motor winding , electrical connection and bearing of motor
(h) Checking any type of electrical starter
(j) Checking of the motors fans
(k) Replacement of any component of pumps (Pump,Motor and electrical connections etc) found defective after the abvoe checks and tests. | 2 | Each | 8,312 ₹8,312 Lowest | 8,400 ₹8,400 |
| 1.06 | The spares replaced of Submersible Pumps (02HP to 05HP) under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Pump Impeller (b) Pump bearing (c) Motor bearing (d) Shaft sleeves (e) Shaft Key (F) Pump bushes (G) Pump Coupling (h) Bearing Cover (j) Starter (k) Motor Winding (l) Casing Packing | 2 | Job | 15,584 ₹15,584 Lowest | 15,600 ₹15,600 |
| 1.07 | SCHEDULE A PART - II (ANNUAL MAINTENANCE CONTRACT FOR EXISTING CEILING FANS)
Annual maintenance Contract for Ceiling fan at 46 Assam Rifles alongwith its connected works with qtrly visting with following works -
(a) Every Machine shall be serviced at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the fan shall be maintained.
(b) Checking of fans winding , bearing, bushes, capacitor, regulator and electrical connection etc. | 85 | Each | 4,420 ₹4,420 Lowest | 4,420 ₹4,420 Lowest |
| 1.08 | The spares replaced of Ceiling fan under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Motor winding (b) bearing (c) Fan blade (d) Fan regulator (e) Fan Capacitor (f) Carbon bushes | 85 | Nos | 87,975 ₹87,975 Lowest | 87,975 ₹87,975 Lowest |
| 1.09 | SCHEDULE A PART - III (ANNUAL MAINTENANCE CONTRACT FOR EXISTING EXHAUST FANS)
Annual maintenance Contract for Exhaust fan at 46 Assam Rifles alongwith its connected works with qtrly visting with following works -
(a) Every Machine shall be serviced at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the fan shall be maintained.
(b) Checking of fans winding , bearing, bushes, capacitor and electrical connection etc. | 10 | Each | 520 ₹520 Lowest | 520 ₹520 Lowest |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
29 Sept 2025, 12:30 pmClosed
Commandant 46 AR
46 Assam Rifles PIN-932046 c/o 99 APO
Annual Maintenance Contract for repair and maint of Water Pumps Ceiling Fans Exhaust Fans Geysers DG Sets Transformer and Solar Water Heater at all the COBs and Bn HQ 46 Assam Rifles
2025_ARMHA_877631_1
46AR/Engr/AMC/2025-26/01
Open Tender
Electrical Works
Works
365 days
Phundrei and COBs
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
Commandant 46 AR
₹10,000
26 Nov 2025
16 Sept 2025
30 Sept 2025
16 Sept 2025
29 Sept 2025
16 Sept 2025
SCHEDULE A PART - I (ANNUAL MAINTENANCE CONTRACT FOR EXISTING WATER PUMPS)
Annual maintenance Contract for Centrifugal Pumps (15HP to 30HP) installed at 46 Assam Rifles alongwith its connected works with qtrly visting with following works (a) Every Machine shall be serviced/checked at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, Engr-in- charge location. (b) Quarterly Preventive maintainance shall include at least the fwg services: (c) Replacement of Coupling if found damaged. unusable. (d) Check pump bearing if found damaged./ unusable etc (e) Checking pump bushing,wear ring, bearing cover, suction nozle (f) Checking of impellers and sleeves. (g) Checking of motor winding , electrical connection and bearing of motor (h) Checking any type of electrical starter (j) Checking of the motors fans (k) Replacement of any component of pumps (Pump,Motor and electrical connections etc) found defective after the abvoe checks and tests.
The spares replaced of Centrifugal Pumps (15HP to 30HP) under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Pump Impeller (b) Pump bearing (c) Motor bearing (d) Shaft sleeves (e) Shaft Key (F) Pump bushes (G) Pump Coupling (h) Bearing Cover (j) Starter (k) Motor Winding (l) Casing Packing
Annual maintenance Contract for Centrifugal Pumps (05HP to 12.5HP) installed at 46 Assam Rifles alongwith its connected works with qtrly visting with following works - (a) Every Machine shall be serviced/checked at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, Engr-in- charge location. (b) Quarterly Preventive maintainance shall include at least the fwg services: (c) Replacement of Coupling if found damaged./ unusable. (d) Check pump bearing if found damaged./ unusable etc (e) Checking pump bushing,wear ring, bearing cover, suction nozle (f) Checking of impellers and sleeves. (g) Checking of motor winding , electrical connection and bearing of motor (h) Checking any type of electrical starter (j) Checking of the motors fans (k) Replacement of any component of pumps (Pump,Motor and electrical connections etc) found defective after the abvoe checks and tests.
The spares replaced of Centrifugal Pumps (05HP to 12.5HP) under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Pump Impeller (b) Pump bearing (c) Motor bearing (d) Shaft sleeves (e) Shaft Key (F) Pump bushes (G) Pump Coupling (h) Bearing Cover (j) Starter (k) Motor Winding (l) Casing Packing
Annual maintenance Contract for Submersible Pumps (02HP to 05HP) installed at 46 Assam Rifles alongwith its connected works with qtrly visting with following works - (a) Every Machine shall be serviced/checked at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence,Engr-in- charge location. (b) Quarterly Preventive maintainance shall include at least the fwg services: (c) Replacement of Coupling if found damaged./ unusable. (d) Check pump bearing if found damaged./ unusable etc (e) Checking pump bushing,wear ring, bearing cover, suction nozle (f) Checking of impellers and sleeves. (g) Checking of motor winding , electrical connection and bearing of motor (h) Checking any type of electrical starter (j) Checking of the motors fans (k) Replacement of any component of pumps (Pump,Motor and electrical connections etc) found defective after the abvoe checks and tests.
The spares replaced of Submersible Pumps (02HP to 05HP) under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Pump Impeller (b) Pump bearing (c) Motor bearing (d) Shaft sleeves (e) Shaft Key (F) Pump bushes (G) Pump Coupling (h) Bearing Cover (j) Starter (k) Motor Winding (l) Casing Packing
SCHEDULE A PART - II (ANNUAL MAINTENANCE CONTRACT FOR EXISTING CEILING FANS) Annual maintenance Contract for Ceiling fan at 46 Assam Rifles alongwith its connected works with qtrly visting with following works - (a) Every Machine shall be serviced at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the fan shall be maintained. (b) Checking of fans winding , bearing, bushes, capacitor, regulator and electrical connection etc.
The spares replaced of Ceiling fan under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Motor winding (b) bearing (c) Fan blade (d) Fan regulator (e) Fan Capacitor (f) Carbon bushes
SCHEDULE A PART - III (ANNUAL MAINTENANCE CONTRACT FOR EXISTING EXHAUST FANS) Annual maintenance Contract for Exhaust fan at 46 Assam Rifles alongwith its connected works with qtrly visting with following works - (a) Every Machine shall be serviced at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the fan shall be maintained. (b) Checking of fans winding , bearing, bushes, capacitor and electrical connection etc.
The spares of Exhaust fan replaced under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Motor winding (b) bearing (c) Fan blade (d) Fan Capacitor etc
SCHEDULE A PART - IV (ANNUAL MAINTENANCE CONTRACT FOR EXISTING GEYSER) Annual maintenance Contract for Geyser installed at 46 Assam Rifles alongwith its connected works with qtrly visting with following works - (a) Every Machine shall be serviced at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the Geyser shall be maintained. (b) Replacement of heating Element . (c) Replacement of indicator. (d) Replacement of Geyser fitting as per requirements. (e) Replacement of switch, socket & wiring as per requirements.
The spares replaced of Geyser under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Geyser with existing items as per Engr-in-charge.
SCHEDULE A PART - V (ANNUAL MAINTENANCE CONTRACT FOR EXISTING DG SETS) Annual maintenance Contract for DG Sets ( 62.5Kva to 125Kva) installed at 46 Assam Rifles alongwith its connected works with qtrly visting with following works - (a) Every Dg Sets shall be serviced/checked at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the DG set shall be maintained. (b) Quarterly Preventive maintainance shall include at least the fwg services: (c) Checking of all type of filter, fan belt and Coupling if found damaged./ unusable. (d) Check DG set bearing if found damaged./ unusable etc (e) Checking/Cleaningof fuel pump, injector, fuel pipe, Head valve, fly wheel etc. (f) Checking of alternators. (g) Checking of electrical panel connection and 12V battery (h) Checking any type self starter (j) Checking of the DG set fans and raditor (k) Replacement of any component of DG Sets found defective after the abvoe checks and tests.
The spares replaced of DG Sets ( 62.5Kva to 125Kva) under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Fuel filter (b) Oil filter (c) Air filter (d) Engine Oil (e) Coolent (F) Fab belt (G) Packing seal (h) Alternator (j) Self Starter (k) Fly wheel (l) Head Valve (m) Injector (n) Raditor (o) Fuel pump (p) Silencer
Annual maintenance Contract for DG Sets (15Kva to 30Kva) installed at 46 Assam Rifles alongwith its connected works with qtrly visting with following works - (a) Every Dg Sets shall be serviced/checked at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the DG set shall be maintained. (b) Quarterly Preventive maintainance shall include at least the fwg services: (c) Checking of all type of filter, fan belt and Coupling if found damaged./ unusable. (d) Check DG set bearing if found damaged./ unusable etc (e) Checking/Cleaningof fuel pump, injector, fuel pipe, Head valve, fly wheel etc. (f) Checking of alternators. (g) Checking of electrical panel connection and 12V battery (h) Checking any type self starter (j) Checking of the DG set fans and raditor (k) Replacement of any component of DG Sets found defective after the abvoe checks and tests.
The spares replacedof DG Sets (15Kva to 30Kva) under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Fuel filter (b) Oil filter (c) Air filter (d) Engine Oil (e) Coolent (F) Fab belt (G) Packing seal (h) Alternator (j) Self Starter (k) Fly wheel (l) Head Valve (m) Injector (n) Raditor (o) Fuel pump (p) Silencer ETC.
SCHEDULE A PART - VI (ANNUAL MAINTENANCE CONTRACT FOR EXISTING TRANSFORMER) Annual maintenance Contract for Transformer ( 500Kva) installed at 46 Assam Rifles alongwith its connected works with qtrly visting with following works - (a) Every Transformer shall be serviced/checked at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the DG set shall be maintained. (b) Quarterly Preventive maintainance shall include at least the fwg services: (c) Checking of all type of HT and LT insulater. (d) Check thimle if found damaged./ unusable etc (e) Checking/Cleaning of oil sump of transformer. (f) Checking of winding connection (g) Checking of electrical panel connection (h) Checking any type connected gang operated device (j) Checking of the tapper connection (k) Replacement of any component of transformer found defective after the abvoe checks and tests.
The spares replaced under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) HT copper winding (b) LT copper winding (c) breather (d) transformer Oil (e)11 KV insulator (f) Packing seal (g) Thimble
SCHEDULE A PART - VII (ANNUAL MAINTENANCE CONTRACT FOR EXISTING WATER COOLER) Annual maintenance Contract for Water Coolers installed at 46 Assam Rifles Kakching alongwith its connected works with qtrly visting with following works - (a) Every Machine shall be serviced at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the Geyser shall be maintained. (b) Checking of existing fan . (c) Checking of indicator. (d) Checking of water coolers storage tank and compreser as per requirements. (e) Checking of drain pipe switch, socket & wiring as per requirements. (f) Checking /repair of fan motor/ pump with connection pipe
The spares replaced under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Water Coolers body with existing fitting
M/s. Ngangbam Premananda Singh (BID ID -3290303)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .