Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.4 L+₹5,609.93 (4.31%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.6 L+₹27,648.94 (21.2%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
24 Sept 2026, 6:00 pmClosed
XEN IFC
Office of the Executive Engineer IFC Division Poon
Improvement Modernization of Sarar D1 Khul between RD (700 To 850) M
2026_IFC_324650_2
e NIT No. 23 of 2026-27 Date 14-09-2026
Open Tender
Civil Works
Percentage
180 days
poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
XEN IFC POONCH
₹4,000
28 Sept 2026
14 Sept 2026
25 Sept 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in
charge: 1:3:6 or richer mix (i/c equivalent design mix) | 9.07 | cum | 1,725.2 | ₹15,647.56 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 3.78 | cum | 4,826.5 | ₹18,244.17 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 15.87 | cum | 5,733.6 | ₹90,992.23 |
| 4 | Dumping stone excluding cost of stones.
in Horizontal on level | 6.8 | cum | 237.9 | ₹1,617.72 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.83 | cum | 6,591.25 | ₹18,653.24 |
| 6 | Supply of stones | 2.27 | cum | 700 | ₹1,589 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 151.2 | sqm | 286.35 | ₹43,296.12 |
| 8 | Carriage of sand and aggr. By an avg distance of 5 km by MT | 30.58 | cum | 200.74 | ₹6,138.63 |
| 9 | Carriage of stone by an avg distance of 1 km by mt | 6.8 | cum | 151.47 | ₹1,030 |
| 10 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet | 17.01 | cum | 184.95 | ₹3,146 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1095326.xls
BOQ • 0.38 MB
Sararandsangla.pdf
PDF • 0.58 MB
SararD1.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .