Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Accepted-Technical HUBERT ENVIRO ARE SYSTEMS PRIVATE LIMITED NO A 21 III PHASE GUINDY CHENNAI TAMIL NADU TAMIL NADU 600032 | CHENNAI | TAMIL NADU | 600032 | Accepted-Technical Qualified |
| 4 | Accepted-Technical | Accepted-Technical Qualified |
| 5 | Accepted-Technical | Accepted-Technical Qualified |
Tender Value
₹65.9 L
EMD Value
₹1.6 L
Closing Date
29 Jul 2026, 3:00 pmClosed
Deputy General Manager Proc.
HLL BIOTECH LIMITED, Integrated vaccine complex, Survey no 192 195, Meleripakkam village, Chengalpattu PIN 603003
Design, Supply, Installation, Testing and Commissioning of Chemical Sanitizable Reverse Osmosis (CSRO) System at Existing Water Pre-Treatment Plant at IVC facility at HLL Biotech Limited, Chengalpattu, Tamil Nadu
2026_HBL_284102_1
HBL/CSRO/IVC/CPT/26-27, Dt. 14.07.2026
Open Tender
Miscellaneous Works
Item Rate
45 days
Chengalapattu
Please refer Tender documents.
18 documents required · 18 mandatory
₹1,770
Yes
HLL Biotech Limited
₹1.6 L
Yes
ONLINE
1 Sept 2026
14 Jul 2026
30 Jul 2026
14 Jul 2026
29 Jul 2026
15 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Design, Supply, installation and testing of automated CSRO Plant with the following components but not limited to : | |||||
| 1.02 | Product output Flow: Not less than 15 cubic meter per hour
Current Inlet TDS of water : 570 PPM
Skid MOC: SS 304 Skid Mounted CSRO System
RO Feed Pump - 02 set. (1 Working + 1 Stand by )/ Make: Grundfos / MOC: SS304
Highpressure Pump - 02 set . (1 Working + 1Stand by) / Make: Grundfos / MOC: SS304
5 Micron filter - OEM approved
Chemically Sanitisable RO Membranes: Make: DOW - Dupont (Filmtec)
Acid/Base Dosing System with pump , tank with level indicators - 01 Set
Antisclant Dosing System with pump , tank with level indicators - 01 Set
SMBS Dosing System with pump , tank with level indicators - 01 Set
Dosing pump: Make: Prominent Dosing Tank: MOC: HDPE, Make : Sintex
Inter connecting pipings of RO & Filter Housings: - SS316L (For complete pipings / interconnections in the RO skid)
Inter connecting pipings that to be in UPVC, Make : Astral
RO permeate and RO reject line can be UPVC. UPVC piping upto RO Feed pump inlet also to be considered.
HPS / LPS with gauge - 01 Set Make: Baumer/Warree
ROTO Meters (Product Flow, Rejct Flow, Recirculation Flow) - Each Set 1 nos
Digital Flow meter at RO Outlet - 1 No./ Make: Krohne
Conductivity Sensor cum Transmitter (Dump valve and line for high conductivity detection) / Make: Emerson
pH Analyser - Make: Emerson,
ORP Analyser - Make: Emerson,
ORP Dump Valve / Make: Liestung / Mascon
Necessary Valves and fittings with sampling point provision to be considred.
All pnumatic tubes make: Festo. | 1 | SET | - | - |
| 1.04 | RO Feed Water Storage Tank with Level Indicator and all other fittings and drain with valves:
Capacity: 15 KL / Make: Sintex | 2 | Nos | - | - |
| 1.05 | Reject Water Storage Tank with Level Indicator and all other fittings and drain with valves:
Capacity: 10 KL / Make: Sintex | 2 | Nos | - | - |
| 1.06 | HMI/PLC- Based Panel (7" HMI)
HMI/PLC - Make: Siemens
VFD for High pressure pumps, Make: seimens
Common Floor Mounted Control panel with accessories - MOC of panel - Stainless Steel 304
Cable / Cable Tray / Supports/ Earthing etc as per electrical standerds.,
Inter locks to be provided with existing control panel of pre treatment for water demand and non requirement of water for CSRO and RO permiate tank. HMI/ PLC programmes backup to be provided.
Supply laying and Termination of Electrical cabling (raw power & UPS including cables and trays) from Existing electrical panel of pre treatment to RO control Panel as per electrical standerds. | 1 | Set | - | - |
| 1.07 | Services | - | - | - | - |
| 1.08 | 1. Commissioning of automated CSRO System
2. Validate the system according to the protocols (IQ & OQ). Protocols to be submitted along with control phylosophy and operational and maintenance SOPs.
3. Hydrotest , slope verification and welding reports to be submitted.
4. Permeate Flow rate should not be less than 15 m3/hr and other parameters according to scope of work defined and out put TDS should be less than 120 PPM.
5. Testing and analysis of CSRO Inlet and outlet water samples according to IS 10500 through NABL accredited laboratory after comissioning to prove the system meets the design parameters and any other testing feeling mandatory during comissioning activities.
6. Chemicals and Consumables for commissioning & for trial run upto 1 month (24x7 operation).
7. Supplied System to have 1 year service support from date of complete validation at no additional cost.
Note: The quoted rate to be inclusive of all cost related to Manpower, food and accomodation, Loading, Unloading , packing and Relocation of all materials and equipment etc. | 1 | LS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.65 MB
TEDOCSRO.pdf
Tender Documents • 0.64 MB
BOQ_331489.xls
BOQ • 0.26 MB
DATEEXTNIICSRO.pdf
PDF • 0.11 MB
DATEEXTNICSRO.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .