Loading…
Loading…
Tender Value
₹12.3 L
EMD Value
₹24,620
Closing Date
15 Sept 2026, 4:00 pmDue today
Executive Engineer Rnb Division Dalgate Srinagr
Executive Engineer Rnb Division Dalgate Srinagr
Construction of R/wall at main road Brein near R-Kull.
2026_PWDJK_323795_12
Nit-51/e-tend/2026-27/6825-30 dtd.07-09-2026
Open Tender
Civil Works
Percentage
60 days
Brein near R-Kull.
as Per Nit
2 documents required · 2 mandatory
₹600
Executive Engineer Rnb Division Dalgate Srinagr
₹24,620
8 Sept 2026
8 Sept 2026
16 Sept 2026
8 Sept 2026
15 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar. | 20.39 | Cum | 1,474.96 | ₹30,074.43 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil. | 33.98 | Cum | 406.19 | ₹13,802.34 |
| 3 | P/L stone soling (Hand packed) in trenches incl. ramming, dressing, watering etc. incl. all leads, lifts and carriage upto site of work complete. | 8.49 | Cum | 805.08 | ₹6,835.13 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 5.6 | Cum | 4,807.97 | ₹26,924.63 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 55.61 | Cum | 6,165.47 | ₹3,42,861.79 |
| 6 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo mechanically treated bars of grade. Fe-500D or more complete. | 2,224.4 | Kg | 104.41 | ₹2,32,249.6 |
| 7 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 74.34 | Sqm | 10.58 | ₹786.52 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. | 115.24 | Sqm | 242.67 | ₹27,965.29 |
| 9 | Providing, laying maintaining and removing a double-wall sandbag cofferdam in water level with fluctuating levels, complete in all respects including dewatering complete job. | 60.97 | RM | 1,271.19 | ₹77,504.45 |
| 10 | Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level including curing complete with cement mortar 1:6 (1 cement: 6 coarse sand) including all carriages stones for 15 Kms and sand for 20 Kms leads, lifts complete (2nd sort) | 23.78 | Cum | 8,936.81 | ₹2,12,517.34 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1091052.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .