| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr Quoted ₹1.5 Cr | L1 | Accepted-AOC lowest rate quoted |
| 2 | L2₹1.5 Cr+₹75,800 (0.52%)Rejected-AOC | ₹1.5 Cr+₹75,800 (0.52%) | L2 | Rejected-AOC quoted rates are higher |
| 3 | L3₹1.5 Cr+₹4.5 L (3.09%)Rejected-AOC | ₹1.5 Cr+₹4.5 L (3.09%) | L3 | Rejected-AOC quoted rates are higher |
| 4 | L4₹1.8 Cr+₹33.9 L (23.0%)Rejected-AOC 162 MAYUR VIHAR SECTOR 48 A CHANDIGARH 160047 | CHANDIGARH | CHANDIGARH | 160047 | ₹1.8 Cr+₹33.9 L (23.0%) | L4 | Rejected-AOC quoted rates are higher |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
26 Aug 2022, 3:00 pmClosed
Addl SE O M Divn BBMB Bhiwani
400 KV GRID SUB STATION PREM NAGAR BHIWANI
E-Tender for Reconstruction of Sub Station boundary Wall at 220 Kv BBMB Ch. Dadri
2022_BBMB_86062_2
NIT07/2022-23
Open Tender
Civil Works
Tender cum Auction
365 days
400 KV sub station BBMB Bhiwani
AS PER NIT
3 documents required · 3 mandatory
₹3,540
Yes
₹1.6 L
Yes
22 Feb 2023
31 May 2022
29 Aug 2022
31 May 2022
26 Aug 2022
31 May 2022
31 May 2022 - 25 Aug 2022
Amount
Dismantling brick work tile, masonry or tile lining. (b) In cement. L/R
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. L/R
Cement concrete 1:6:12 (a) With brick ballast 40mm gauge (ii) mixing by mechanical means using concrete mixer volumetric
First class burnt brick work laid in cement sand Mortar 1:4 in foundation and plinth.
Damp proof course 2.5cm thick of cement concrete 1:2:4 with 2 coats of bitumen 20/30 penetration at 1.65 Kg per sqm laid hot and sanded
First class burnt brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level.
20mm thick cement plaster 1:5 in two coat work
12.5 mm thick cement plaster 1:5
Cement Concrete 1:2:4 (a) With stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type
Steel work, fixed independently without connecting plates, including cutting, hoisting and fixing in position (c) Tees, angles and channels
Scraping (f) Bricks dismantled from brick work in mud L/R
Fixing glass pieces on top of walls
Finishing walls with cement based water soluble exterior paint such as snowcem, robbiacem etc. two or more coats to give an even shade.
Cement pointing 1:3 deep variety
Applying priming coat with metal primer on new steel or iron work including preparation of Surface.
Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade
Welding by gas or by electric plant, including Carriage to and from workshop.
Breaking ballast from brick bats (including stacking) (i) 40mm LR
Extra for providing and mixing water proofing materials in cement plaster work @ 1kg. per 50 kg. of cement
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 mtr openable length (total length 90 m)) having 50 nos. round per 6mtr. Length, up to 3mtr. Height of wall with existing angle iron Y shape ed Placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T rein force barbed wire , stud tied with G.I stapled and G.I clip to retain horizontal , including necessary bolt or G.I barbed wire tied angle iron ,all complete as per direction of Engineer –in-charge ,with reinforced barbed tape (R.B.T/spring core (2.5mm thick)wire of high tensile strength of 165 kg /sq mm with tape (0.52 mm thick )and weight 43.478 gm/mtr.(cost of M.S angle C.C block shall be paid separately )
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.L/R (RCC Boundary Wall)
Cement concrete 1:5:10 (b) With stone aggregate 40mm gauge (ii) mixing by mechanical means using concrete mixer volumetric type
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering and shuttering for columns (Square or rectangularor poly gonal in plain)
First class burnt brick work laid in cement sand mortar 1:6 in first storey upto 4 metres above plinth level.
20mm thick cement plaster 1:5 in two coat work
Cement pointing 1:3 deep variety
Finishing walls with cement based water soluble exterior paint such as snowcem, robbiacem etc. two or more coats to give an even shade.
Washed stone grit plaster on exterior walls of height upto 10 M. above ground level in two layers, under layer 12.5mm cement plaster 1:4 (1 cement : 4 coarse sand ) furrowing coarse sand : 2 stone chipping 10mm nominal size) in panels with groove all around Kg of cement per square metre, top layer 15mm cement plaster 1:1/2:2 (1 cement: 1/2the under layer with scratching tool, applying cement slurry on the under layer @ 2 as per approved pattern including scrubbing and washing, the top layer with brushes and water to expose the stone chippings, complete as per specification and direction of Engineer-in- charge (Payment for providing grooves shall be made separately).
Cement Concrete 1:2:4 (a) With stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type
Bidder Name
Amount in Words
rattan builders pvt ltd
TANUJ AGARWAL CONTRACTOR
MS CHAUDHARY CONSTRUCTION
THE TOSHAM CHAUHAN CO-OP L & C SOCIETY LTD.
TANUJ AGARWAL CONTRACTOR
MS CHAUDHARY CONSTRUCTION
rattan builders pvt ltd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .