Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81,822Accepted-Finance | L1 | Accepted-Finance Financially accepted | |
| 2 | L2₹1.8 L+₹99,248 (121.3%)Accepted-Finance | L2 | Accepted-Finance Financially accepted | |
| 3 | L3₹2.1 L+₹1.3 L (156.1%)Accepted-Finance BHAGWATI NAGAR JAMMU | L3 | Accepted-Finance Financially accepted | |
| 4 | L4₹2.1 L+₹1.3 L (158.2%)Accepted-Finance | L4 | Accepted-Finance Financially accepted | |
| 5 | L5₹2.2 L+₹1.4 L (171.2%)Accepted-Finance 110 MINI SHOPPING COMPLEX NEHRU MARKET JAMMU | L5 | Accepted-Finance Financially accepted |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
11 Aug 2020, 4:00 pmClosed
Executive Engineer
Office of the XEN Jal Shakti PHE Mech Div Kathua
Annual Rate Contract For Repair and Maintenance of Transformers of Various Capacities Installed at Tube Wells and Central Pumping Stations of Jal Shakti PHE Mech Division Kathua
2020_PHE_101415_1
e-NIT 41/JSPHEMK of 2020-21
Open Tender
Repair and Maintenance Works
Item Wise
5 days
Kathua District
As per SBD
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Jal Shakti PHE Mech Div Kathua
₹50,000
Yes
18 Aug 2020
28 Jul 2020
12 Aug 2020
28 Jul 2020
11 Aug 2020
28 Jul 2020
63 KVA Transformer
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using hydra crane and skilled labour, loading in Mechanical transport and carriage to workshop and unloading at workshop. Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.
Reconditioning of Al. coil
Providing and fitting of HV leg coil Al. S.E (per Kg)
Providing and fitting of HV leg coil Al. DPC (per Kg)
Providing and fitting of LV leg coil Al. S.E (per Kg)
Providing and fitting of LV leg coil Al. DPC (per Kg)
Providing & fitting of HV bushing
Providing & fitting of LV bushing
Providing & fitting of HV bush rod
Providing & fitting of LV bush rod
Providing & fitting of gasket set
Providing & fitting of tapping switch with handle
Providing & fitting of LT terminal plate
Providing & fitting of Oil drain valve
Providing & fitting of core laminations per Kg
Providing & fitting of sundry items
Heat treatment of repaired transformer
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.
Providing and filling of fresh T-oil for topping up.
Loading of transformer into Mechanical transport using hydra crane and skilled labour and carriage to the site of work
a) Upto 200m
Mounting the transformer on poles/ platform with the help of hydra crane and skilled labour after dismounting the temporarily installed transformer
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.
100 KVA Transformer
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using hydra crane and skilled labour, loading in Mechanical transport and carriage to workshop and unloading at workshop. Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.
Reconditioning of Al. coil
Providing and fitting of HV leg coil Al. S.E (per Kg)
Providing and fitting of HV leg coil Al. DPC (per Kg)
Providing and fitting of LV leg coil Al. S.E (per Kg)
Providing and fitting of LV leg coil Al. DPC (per Kg)
Providing & fitting of HV bushing
Providing & fitting of LV bushing
Providing & fitting of HV bush rod
Providing & fitting of LV bush rod
Providing & fitting of gasket set
Providing & fitting of tapping switch with handle
Providing & fitting of LT terminal plate
Providing & fitting of Oil drain valve
Providing & fitting of core laminations per Kg
Providing & fitting of sundry items
Heat treatment of repaired transformer
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.
Providing and filling of fresh T-oil for topping up.
Loading of transformer into Mechanical transport using hydra crane and skilled labour and carriage to the site of work
a) Upto 200m
Mounting the transformer on poles/ platform with the help of hydra crane and skilled labour after dismounting the temporarily installed transformer
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.
250 KVA Transformer
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using hydra crane and skilled labour, loading in Mechanical transport and carriage to workshop and unloading at workshop. Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.
Reconditioning of Al. coil
Providing and fitting of HV leg coil Al. S.E (per Kg)
Providing and fitting of HV leg coil Al. DPC (per Kg)
Providing and fitting of LV leg coil Al. S.E (per Kg)
Providing and fitting of LV leg coil Al. DPC (per Kg)
Providing & fitting of HV bushing
Providing & fitting of LV bushing
Providing & fitting of HV bush rod
Providing & fitting of LV bush rod
Providing & fitting of gasket set
Providing & fitting of tapping switch with handle
Providing & fitting of LT terminal plate
Providing & fitting of Oil drain valve
Providing & fitting of core laminations per Kg
Providing & fitting of sundry items
Heat treatment of repaired transformer
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.
Providing and filling of fresh T-oil for topping up.
Loading of transformer into Mechanical transport using hydra crane and skilled labour and carriage to the site of work
a) Upto 200m
Mounting the transformer on poles/ platform with the help of hydra crane and skilled labour after dismounting the temporarily installed transformer
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.
400 KVA Transformer
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using hydra crane and skilled labour, loading in Mechanical transport and carriage to workshop and unloading at workshop. Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.
Reconditioning of cu. coil
Reconditioning of Al. coil
Providing and fitting of HV leg coil Cu. S.E (per Kg)
Providing and fitting of HV leg coil Cu. DPC (per Kg)
Providing and fitting of HV leg coil Al. S.E (per Kg)
Providing and fitting of HV leg coil Al. DPC (per Kg)
Providing and fitting of LV leg coil Cu. S.E (per Kg)
Providing and fitting of LV leg coil cu. DPC (per Kg)
Providing and fitting of LV leg coil Al. S.E (per Kg)
Providing and fitting of LV leg coil Al. DPC (per Kg)
Providing & fitting of HV bushing
Providing & fitting of LV bushing
Providing & fitting of HV bush rod
Providing & fitting of LV bush rod
Providing & fitting of gasket set
Providing & fitting of tapping switch with handle
Providing & fitting of LT terminal plate
Providing & fitting of Oil drain valve
Providing & fitting of core laminations per Kg
Providing & fitting of sundry items
Heat treatment of repaired transformer
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.
Providing and filling of fresh T-oil for topping up.
Loading of transformer into Mechanical transport using hydra crane and skilled labour and carriage to the site of work
a) Upto 200m
Mounting the transformer on poles/ platform with the help of hydra crane and skilled labour after dismounting the temporarily installed transformer
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.
Major Electricals
PERFECT ELECTRICAL WORKS
RAKESH ELECTRICAL WORKS
Rishabh Electricals and Mechanical Works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .