| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-AOC | 1 | Accepted-AOC Accepted as L1 bidder. | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected as L3 bidder. | |
| 3 | Rejected-Technical CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | Rejected-Technical Rejected as L2 bidder. |
Tender Value
₹9.6 L
EMD Value
₹12,100
Closing Date
29 Jul 2022, 6:45 pmClosed
General Manager (Opr) , JK Area
Office of General Manager (Opr) , JK Area, P.O-Jamuna Colliery, Dist. Anuppur (MP), Pin-484444
Installation of pony belt conveyor (800MM) in 47LW/1D, Extension of belt structure and laying of 800 MM PVC belting from 47LW/1D to 47LW/47D (i.e. 1180 Mtr) in proposed new development panel (i.e. 47 LW of L.K.II Seam) in Bartarai Colliery
2022_SECL_250554_1
SECL/JK/GM(O)/22-23/eT/11 Date 18.07.2022
Open Tender
Miscellaneous Works
Item Rate
60 days
Bartarai Colliry, JK Area
As per NIT
3 documents required · 3 mandatory
₹12,100
21 Sept 2022
18 Jul 2022
30 Jul 2022
18 Jul 2022
29 Jul 2022
19 Jul 2022
18 Jul 2022 - 22 Jul 2022
Amount
Installation of 800 mm size double drum with loop takeup at 47 LW/+1 D. The job involved :- 1. Erection of drive frame structure with proper alignment/level. 2. Placement of Drive drum, Gear Box, Electric Motor. 3. Alignement of drum-Gear box and Motor-Gear Box. 4.Fixing of discharge chute, skirt board, wipers, scrapers etc at discharge point. 5.Erection of tail drum frame, placement of drum, alignment and levelling of the same. 6. Transportation of the same as a lead of 100 mtr.
Transportation and installation of belt structure and laying of 800 mm PVC belting from 47LW/+1D to 47LW/47D (1180 mtr ). The Job involved :- 1. Transportation and installation of 800 mm size tail end drum , drum base frame, tail end gaurd side plate/loading brackets, decking plates. 2. Laying of 800 mm PVC belting on structure, proper tensioning and fastening.
Making of foundation /platform for installation of drive head and tailend drum etc.
Groove cutting for foundation in hard stone
PCC work in UG foundation
Loading of all kind material in to tubs at incline mouth.
Unloading of all kind building material at destination in UG.
Pushing of tubs for every 30 Mtr lead. After free pushing of first 30meter (90/30= 3lead)
Transporting and material with tramming and pushing, coupling with haulage every 500 mtr or part (1330/500 =2.66 say 3lead)
Cleaning removal of blasted materials.
Cost of material
Cement
Stone metal (20MM)
Total impact of GST for the purpose of CTC
Ram Awadh Singh
NAVIN KUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .