Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹2.8 CrAccepted-AOC | ₹2.8 Cr | l1 | Accepted-AOC l1 |
| 2 | l2₹2.8 Cr+₹1.6 L (0.57%)Rejected-Finance 124 B SHYAMAPROSAD MUKHERJEE ROAD KALIGHAT KOL 26 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | ₹2.8 Cr+₹1.6 L (0.57%) | l2 | Rejected-Finance L2 |
| 3 | l3₹2.8 Cr+₹2.4 L (0.86%)Rejected-Finance 102 1 SN BANERJEE ROAD KOLKATA 700014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | ₹2.8 Cr+₹2.4 L (0.86%) | l3 | Rejected-Finance L3 |
| 4 | l4₹2.8 Cr+₹3.1 L (1.11%)Rejected-Finance 16 MANMATHA DUTTA ROAD KOLKATA 700037 | KOLKATA | KOLKATA | WEST BENGAL | 700037 | ₹2.8 Cr+₹3.1 L (1.11%) | l4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹5.6 L
Closing Date
10 Dec 2020, 12:00 pmClosed
Office of the Municipal Secretary
The Municipal Secretary, The Kolkata Municipal Corporation, CMO Buildings, 5 S.N. Banerjee Road, Kolkata 700013.
LOGISTIC ARRANGEMENT FOR PARK STREET CHRISTMAS FESTIVAL 2020 TEMPORARY ILLUMINATION, SOUND SYSTEM, DECORATION ETC.
2020_KMC_307212_1
KMC/MS/PSCF-2020/1
Open Tender
Miscellaneous Works
Item Rate
4 days
PARK STREET
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5.6 L
19 Dec 2020
2 Dec 2020
12 Dec 2020
2 Dec 2020
10 Dec 2020
5 Dec 2020
Amount
Stage, structure and other accessories (to be made ready by 12:00 noon of 21.12.2020) inside Allen Park
Wooden platform on the ground for stage from 21.12.2020 to 30.12.2020 Size: 32' X 20' + 8' X 4' + 8' X 4' (Height - 4') = 704' sqft
Backdrop fitted with batam frame on the platform Size : 32' X 15' = 480' sqft. (as per approved design of Tourism Deptt.)
3 Nos Green room made with cloth ceiling and side covered by plain coloured cloth. Size : 12' X 10' X 3 Nos. = 360' sqft (21.12.2020 to 30.12.2020)
Podium on 21.12.2020
Centre table with cover on 21.12.2020
Banquet chair on 21.12.2020
Plastic chair with white cover 21.12.2020 to 30.12.2020
Plastic Chairs for one day only on 21.12.2020
Pradip with stand, oil & lighting arrangement on 21.12.2020
Grey coloured synthetic carpet on stage
Media platform with synthetic carpet
Installation of M.S. Truss based structure for gate decoration on road. Size : 57' + 22' + 22' (20' ground clearance is required)
Floral decoration on stage and backdrop on 21.12.2020
Cloth Barricading based with bamboo structure on the ground Size : 75 + 52 + 70 + 126 = 323 rft
Wooden platform on the ground for media with synthetic carpet and outside near gate of same size Size : 24' X 8' X 3' H + 24' X 8' X 2' H = 384sqft
Wooden platform laid on the ground with green synthetic carpet for passage Size : 145' X 8' = 1160' sqft
Green Synthetic Carpet on Passage 95ft X 6ft = 570sft for one day on 21.12.2020
Walling by plain cloth for backside of the park Size : 182' X 9' = 1638 sqft
View cutter on Park Street Flyover (Eastern flank) with durable material fitted on MS frame Size : 85' X 12' = 1020 sqft
GI sheet rooms with bamboo structure on road for CESC connection console points
Octonum stall including table, chair, platform, carpet & spot light for Tourism & Health office inside Allen Park (from 20.12.2020 to 30.12.2020) Size : 6 Mt. X 2 Mt. + 2 Mt. X 2 Mt.
3 Queue managers and good quality PA System, 2 Cordless mike(sound system to be made audible from Asiastic Society to Wood Street along Park Street) to control parade on 23.12.2017
Providing 4 (four) nos bio-chemical toilets (2 gents & 2 ladies) complete with water, towel, & soap with cleaning for 2 times a day at 03:00 PM and at 06:00 PM at Allen Park from 21.12.2020 to 30.12.2020
Photography mask walling of plywood at Allen Park (Selfie Zone) near the stage
Electrical Installation for 21.12.2020 to 10.01.2021 for Park Street, St. Paul's Cathedral Church & its surrounding areas.
LED Flood light (white & coloured) 200 watt along footpath of Park Street from Park Hotel to U.N.Brahmachari Road crossing, Camac Street and surrounding areas.
Dropping Shower light.
Colour L.E.D (Set of1000 Pcs.) Rice Light
Both side over head illuminated of 13 Nos. M.S. Structure used for gates at different places - 13 X 2 = 26 sides (strictly as per approved colour & design of Tourism Deptt.)
Kolkata Christmas Festival Logo (strictly as per approved colour & design of Tourism Deptt.)
Gate of Allen park illumination (strictly as per approved colour & design of Tourism Deptt.)
Motif for Allen park, along Park Street, at St.Pauls Cathedral Church and its surrounding area and along Park Street from Loudon Street to Mullick Bazar crossing (strictly as per approved colour & design of Tourism Deptt.)
Decoration of Passage at Allen Park
Both side illuminated overhead gate with bamboo structure (one at St.Pauls' Cathedral Church and two at Cathedral Road - near Birla Planetarium and near Rabindra Sadan)
Special big illuminated motif (24' high) of 12 nos. at Park Street and 2 nos. at St.Pauls' Cathedral Church
'L' type road lighting (strictly as per approved colour and design of Tourism Department) on 3 permanent gate structures at Park Street
'L' Type road lighting (24 on Park Street, & 6 at St. Pauls' Cathedral Church area) strictly as per approved colour and design of Tourism Deptt with erection of bamboo structure
LED Rope lighting to pillars in front of Park Hotel, pillars and trees along both sides of Park Street, Allen Park, & St.Pauls' Cathedral Church and their surrounding areas (7500 mtr)
LED PAR Light (Colour Changing)
Surfy Pointee at Park Street
Surfy
Mirror Ball around Allen Park
'T' Truss at Allen Park and surrounding areas
Electrical Installaton from 21.12.2020 to 31.12.2020 for Allen Park
Alpha beam moving head
LED Par
Follow Spot.
Smoke Machines
Lasers
Digital control boards.
Digital power packs
Necessary cable and wires
260 Running feet Iron truss
450 nos. dropping shower light at Park Street, Allen Park and Loudon Street to Mullick Bazar Crossing and Cathedral Road
110 LED Par Light at Allen Park on 21.12.2020
Audio Visual System for one day on 21.12.2020 only at Allen Park.
8' X 6' LED walls
Switcher
Video mixing console
Video Camera
Necessary cable and wires
Sound System fron 21.12.2020 to 31.12.2020 at Allen Park (Quality of sound must be of very good)
Line array speakers
Double 18-inch sub woofers
Stage Monitors
Cordless Microphones
Roland stage gears
AKG Drum kit microphones set
Corded microphone
32 Channel & helth audio mixing console
Amplifier
Cross - over unit
Reverb and delay machine
Necessary cable, wires, junction box and MCBs
PA system for Traffic Police Kiosk adjacent to Allen Park
CD Player with 145 Horn Units and CD Player with 28 Speaker Box at Park Street from Chowringee to AJ Bose Road from 21.12.2020 to 31.12.2020.
Sound Engineer for 11 days
DJ Console for 2 days as may be directed
2 Nos. 62 KVA & 1No. 125 KVA Gen Set with fuel on 21.12.2020 at Allen Park
325Nos 200W LED Flood Light for temporary illumination of Territorial Army Ground, Rangers Club Ground, Outram Road, Mayo Road, Cathedral Road, Queensway with 5 nos. 65 KVA DG Set with fuel and nearby areas with Generator on 25/12/2020
Feed to 40 Media Channels on 21/12/2020
Dedicated labour staff on 21.12.2020 near the main stage at Allen Park from 4.00 pm to 11.00pm for shifting of stage furniture, musical instruments etc. (To report to Mr. S. Calvert, MLA, or his representative at 4 pm positively)
100 Pairs of Hand Gloves
100 Caps with KCF Logo
15 nos. of Police Assistance Booth complete structure with PA System and roof top cover at - (a) Xing of J.L.Nehru Rd. & Park Street xing below Park Street Flyover (b) Park Street and Middleton Row xing opposite Flury's (c) Park street and Russel street xing (d) Park Street and Free School Street Xing (e) Park and Camac street Xing (f) xing od Park Street & Rafi Ahmed Kidwai Road, (g) xing of Park Street and Loudon Street, (h) xing of Park street and Rowdon Street (i) xing of Free School Street and KYD Street (j) xing of Park Street and A.J.C. Bose Road, (k) xing of Free School Street and Ripon Street (l) xing of Free School Street and Royd Street (m) xing of Middleton street and Russel Street (n) xing of Free School Street and Marquis Street (o) Southern Footpath of Park Street beside Allen park between Wood Street and Camac street
4 nos. CCTV Cameras with all accessories from 20.12.2020 to 31.12.2020 and 8 nos. of CCTV cameras with all accessories on 21.12.2020 inside Allen Park.
M/s. K.D.SET
The Holy Decorators
COMMUNICATION & CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .