| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC 11 | VIRUDHUNAGAR | TAMIL NADU | 626202 | ₹6.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.2 LRejected-AOC | ₹7.2 L | L2 | Rejected-AOC Rejected |
| 3 | L3₹7.3 LRejected-AOC | ₹7.3 L | L3 | Rejected-AOC Rejected |
| 4 | L4₹7.4 LRejected-AOC | ₹7.4 L | L4 | Rejected-AOC Rejected |
| 5 | L5₹7.8 LRejected-AOC | ₹7.8 L | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Alexander L5 | Madasamy L2 | NARPAVI TRADERS L4 | Antonyselvan L6 | Linga Kumar L L1 | PRABU ENGINEERING L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Name of Work:1)Providing Paver Block Arrangements at AT Samuelnagar Ayya Kovil to Selvaraj House in Pitchivilai Village Panchayat (128.60m) | |||||||||
| 2.00 | Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete. | 11.57 | m3 | 130.44 ₹1,509.19 | 117.9 ₹1,364.10 | 115 ₹1,330.55 | 138.48 ₹1,602.21 | 1 ₹11.57 | 150 ₹1,735.50 |
| 3.00 | Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete. | 5.79 | m3 | 5,680.91 ₹32,892.47 | 5,169.6 ₹29,931.98 | 4,887 ₹28,295.73 | 6,031.29 ₹34,921.17 | 350 ₹2,026.50 | 5,500 ₹31,845 |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing | 146.6 | m2 | 360.98 ₹52,919.67 | 328.5 ₹48,158.10 | 320 ₹46,912 | 383.25 ₹56,184.45 | 180 ₹26,388 | 300 ₹43,980 |
| 5.00 | Plain Cement concrete 1:3:6 using 20mm HBG jelly including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 14.66 | m2 | 6,426.05 ₹94,205.89 | 5,847.3 ₹85,721.42 | 5,566 ₹81,597.56 | 6,822.4 ₹1.0 L | 6,400 ₹93,824 | 5,800 ₹85,028 |
| 6.00 | Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 258.87 | m3 | 233.33 ₹60,402.14 | 211.5 ₹54,751.01 | 499 ₹1.3 L | 247.73 ₹64,129.87 | 600 ₹1.6 L | 480 ₹1.2 L |
| 7.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 48.23 | m3 | 2,423.56 ₹1.2 L | 2,205 ₹1.1 L | 1,826 ₹88,067.98 | 2,573.05 ₹1.2 L | 400 ₹19,292 | 1,700 ₹81,991 |
| 8.00 | Collection and supply of 6mm metal from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 19.29 | m3 | 1,314.98 ₹25,365.96 | 1,196.1 ₹23,072.77 | 982 ₹18,942.78 | 1,396.09 ₹26,930.58 | 400 ₹7,716 | 1,000 ₹19,290 |
| 9.00 | Providing and Laying of Interlocking Rubber moulded Hydraulic pressed Paver block Pavements specification clause 1504, M30 grade 63 mm thickness paver block | 385.8 | m2 | 712.65 ₹2.7 L | 648 ₹2.5 L | 664 ₹2.6 L | 756.61 ₹2.9 L | 705 ₹2.7 L | 650 ₹2.5 L |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 79,095 ₹79,095 | 71,921 ₹71,921 | 78,059 ₹78,059 | 83,974 ₹83,974 | 69,188 ₹69,188 | 76,668 ₹76,668 |
Tender Value
₹8.0 L
EMD Value
₹8,020
Closing Date
26 Nov 2025, 3:00 pmClosed
Block Developmenet officer (BP)
Block Developmenet officer (BP) Panchayat Union office, Tiruchendur
Providing Paver Block Arrangements at AT Samuelnagar Ayya Kovil to Selvaraj House in Pitchivilai Village Panchayat (128.60m). 15th FC Savings Fund(BP) 2025-26.
2025_RDTN_624804_1
A2/2726/2025-1
Open Tender
Civil Works - Buildings
60 days
Tiruchendur Union
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹8,020
Panchayat Union office, Tiruchendur
20 Feb 2026
19 Nov 2025
26 Nov 2025
19 Nov 2025
26 Nov 2025
19 Nov 2025
25 Nov 2025
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Plain Cement concrete 1:3:6 using 20mm HBG jelly including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Collection and supply of 6mm metal from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Providing and Laying of Interlocking Rubber moulded Hydraulic pressed Paver block Pavements specification clause 1504, M30 grade 63 mm thickness paver block
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_747139.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
TechnicalBidsinglecoverProvidingPaverBlockarrangementsatatsamuelnagarayyakovilinpitchivilaipanchayat.pdf
Tender Documents • 0.58 MB
BOQ_747139.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid