| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹1.1 L (0.52%)Admitted-Finance 5 255 1 EB COLONY SALAIPUDUR KOVILPATTI 628 503 | KOVILPATTI | THOOTHUKUDI | TAMIL NADU | 628503 | ₹2.1 Cr+₹1.1 L (0.52%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHREE ANANDHA KAMATCHI CONTRACTORS L1 | AAKASH CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.0001.Improvements and Renovation of Kaliyapillaitheru Kulam in Kodiakkadu at Vedaranyam Block., | |||||
| 2.00 | Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. | 736.31 | cum | 50 ₹36,815.5 Lowest | 60 ₹44,178.6 |
| 3.00Bathing Ghat (Sub Estimate) | |||||
| 4.00 | Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation. | 53.04 | cum | 204 ₹10,820.16 Lowest | 204.4 ₹10,841.38 |
| 5.00 | CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete. | 10.61 | cum | 5,718 ₹60,667.98 Lowest | 5,718.37 ₹60,671.91 |
| 6.00 | CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete. | 85 | cum | 6,044 ₹5,13,740 Lowest | 6,044.45 ₹5,13,778.25 |
| 7.00 | Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete. | 3.53 | cum | 5,233 ₹18,472.49 Lowest | 5,233.53 ₹18,474.36 |
| 8.00 | Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete. | 31.2 | sqm | 215 ₹6,708 | 214.7 ₹6,698.64 Lowest |
| 9.00 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., | 64.04 | sqm | 416 ₹26,640.64 Lowest | 416 ₹26,640.64 Lowest |
| 10.00Retaining wall (Sub Estimate) | |||||
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
19 Jul 2022, 3:00 pmClosed
Project Director, DRDA, Nagapattinam
2nd Floor DRDA Building collectorate Nagapattinam
Nagapattinam district AGAMT II 2021-22 Renovation of ponds at AGAMT Villages in Vedaranyam block Package No.30
2022_RDTN_239716_29
AGAMT II 2021-22 4451/2021/C5
Open Tender
Civil Works - Roads
Item Rate
180 days
Nagapattinam
As seen in the tender document
9 documents required · 9 mandatory
₹0
₹2.1 L
Yes
2nd Floor DRDA Building collectorate Nagapattinam
22 Jul 2022
9 Jul 2022
19 Jul 2022
9 Jul 2022
19 Jul 2022
9 Jul 2022
9 Jul 2022 - 11 Jul 2022
11 Jul 2022
Amount
01.Improvements and Renovation of Kaliyapillaitheru Kulam in Kodiakkadu at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Retaining wall (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
02. Improvements and Renovation of Kumaran Kulam in Kodiakkadu at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Retaining wall (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
03.Improvements and Renovation of Pudhukulam in Kodiakkarai at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Retaining wall (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
INLET (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
04.Improvements and Renovation of Vethakutti kulam in Kodiakkarai at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Retaining wall (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
05. Improvements and Renovation of West Vannakulam in Panchanathikulam East at Vedaraniyam Block,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Retaining wall (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Inlet (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for 600mm Dia Rcc Pipe
06.Improvements and Renovation of Puthukulam in Panchanathikulam East at Vedaraniyam Block,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
07. Improvements and Renovation of Kannerinthankattalai Vettiyan kulam in Piranthiyankarai at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Inlet (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for 600mm Dia Rcc Pipe
08 :Improvements and Renovation of Vedaraniyapuram Nallathanneer kulam in Piranthiyankarai at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Inlet (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for 600mm Dia Rcc Pipe
09 :Improvements and Renovation of Melapiranthiyankarai Udaiyarkulam in Piranthiyankarai at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Inlet (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for 600mm Dia Rcc Pipe
10 :Improvements and Renovation of Keelaandagathurai Pidarikulam in Piranthiyankarai at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Inlet (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for 600mm Dia Rcc Pipe
11 :Improvements and Renovation of Govinthankadu Vannankulam in Thagattur at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Retaining wall (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Inlet (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for 600mm Dia Rcc Pipe
outlet (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for 600mm Dia Rcc Pipe
12:Improvements and Renovation of Suriyankadu Aaladikulam in Thagattur at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Inlet (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for 600mm Dia Rcc Pipe
13: Improvements and Renovation of Subramaniyankadu Vettukulam in Thagattur at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Inlet (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for 600mm Dia Rcc Pipe
14:Improvements and Renovation of Chettitheru vannan Kulam at Thethakudi-south in Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Retaining wall (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
INLET (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
OUTLET (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
15: Improvements and Renovation of Pannaiveli Kulirkulam in Thethakudi South at Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Retaining wall (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
16: Improvements and Renovation of Therkkuveli Mangkulam at Thethakudi-south in Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
INLET (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
17 :Improvements and Renovation of Vadamalai Kannan Kulam at Vadamalai Manakkadu in Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Retaining wall (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
INLET (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
OUTLET (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
18: Improvements and Renovation of Pookula Pillayarkulam at Vadamalai Manakkadu in Vedaranyam Block.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Retaining wall (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
19. Improvements and Renovation of Ammakattalai Nanthavanakulam at Voimedu in Vedaraniyam Block,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
20. Improvements and Renovation of Senathikadu Perappankulam at Voimedu in Vedaraniyam Block,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Inlet (Sub Estimate)
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for 600mm Dia Rcc Pipe
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
AAKASH CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
TB1.pdf
Tender Documents • 0.85 MB
BOQ_284030.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .