| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Fee/PreQual/Technical/Finance KAMPTEE COLLIERY NO 3 KAMPTEE COLLIERY NO 3 NAGPUR MAHARASHTRA 441404 | NAGPUR | MAHARASHTRA | 441404 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.0 L+₹31,297.22 (11.7%)Admitted-Fee/PreQual/Technical/Finance KANDAN AT POST GONDGAON TEHSIL PARSEONI DISTRICT NAGPUR 441101 | GONDGAON | NAGPUR | MAHARASHTRA | 441101 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.0 L+₹36,851.96 (13.8%)Admitted-Fee/PreQual/Technical/Finance 0 KAMPTEE COLLIERY NO 3 KAMTHI NAGPUR NAGPUR MAHARASHTRA 441404 | NAGPUR | MAHARASHTRA | 441404 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.2 L+₹56,169.18 (21.0%)Admitted-Fee/PreQual/Technical/Finance NEAR MASJID KAMPTEE COLLIERY NO 3 TEHSIL KAMPTEE DISTRICT NAGPUR 441404 | KAMPTEE | NAGPUR | MAHARASHTRA | 441404 | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹6,200
Closing Date
12 Nov 2026, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER CIVIL NAGPUR AREA
OFFICE OF THE AREA GENERAL MANAGER NAGPUR AREA PO KASTURBA NAGAR JARIPATKA NAGPUR 440014
Renovation of bus stop at Tekadi colony under Kamptee Sub Area.
2026_WCL_367817_1
na3250-civ-e-tender 52-2026-27
Open Tender
Civil Works - Others
Percentage
60 days
KAMPTEE SUB AREA
AS PER NIT
3 documents required · 3 mandatory
₹6,200
13 Nov 2026
29 Oct 2026
13 Nov 2026
29 Oct 2026
12 Nov 2026
30 Oct 2026
29 Oct 2026 - 3 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | 3.8 | Cum | 1,620.2 | ₹6,156.76 |
| 2 | Demolishing cement concrete manually/ by mechanical
means including disposal of material within 50 metres
lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design
mix) | 4.2 | Cum | 1,914.35 | ₹8,040.27 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 3.62 | Cum | 200.85 | ₹727.08 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 0.95 | Cum | 2,191.15 | ₹2,081.59 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.66 | Cum | 6,309.15 | ₹23,091.49 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.08 | Cum | 7,974.6 | ₹8,612.57 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Hot rolled deformed bars. | 86.76 | Kg | 95.25 | ₹8,263.89 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for. Columns, Pillars, Piers, Abutments, Posts and Struts. | 3.98 | Sqm | 742.35 | ₹2,954.55 |
| 9 | Steel work in built up tubular (round, square or rectangular
hollow tubes etc.) trusses etc., including cutting,
hoisting, fixing in position and applying a priming coat of
approved steel primer, including welding and bolted with
special shaped washers etc. complete. Hot finished welded type tubes | 768.31 | Kg | 148.45 | ₹1,14,055.62 |
| 10 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-Charge) of total coated thickness 0.50mm (base metal of minimum 0.45mm thickness with total coating thickness of 0.05mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in- charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | 21.6 | m2 | 591.9 | ₹12,785.04 |
stage.html
html • 0.02 MB
finance_380788.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_380788.xls
BOQ • 0.30 MB
corri.pdf
PDF • 0.52 MB
corri.pdf
PDF • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .