The Project Director , DRDA,Dindigul
The Project Director , DRDA,Dindigul
Strengthening Upgradation of Roads under Pradhan Mantri Gram Sadak Yojana III 2023-24 Batch I including Maintenance TN05-139- Palani- Dindigul District
2024_RDTN_134218_1
TN05139
Open Tender
Civil Works - Roads
Item Rate
270 days
DINDIUGL DISTRICT
Strengthening Upgradation of Roads under Pradhan Mantri Gram Sadak Yojana III 2023-24 Batch I including Maintenance TN05-139- Palani- Dindigul District
2 documents required · 2 mandatory
₹0
₹5.0 L
DRDA,DINDIGUL
1 Oct 2024
16 May 2024
18 Jul 2024
16 May 2024
18 Jul 2024
16 May 2024
29 May 2024
Amount
Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle)
Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90-1.20 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Medium Porosity [RBI]
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).
Providing, laying and rolling of Open-Graded Premix Surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
Providing and laying Seal Coat sealing the voids in a Bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510. (ii) Bitumen (S-65)
NEW TECHNOLOGY [RBI]
Providing, Laying and Spreading Base Course on a prepared surface, including mixing of 50% 22.4 mm Down Aggregate, 50% Stone Dust and 2.5% RBI -81 by mix in place with rotavator and grading with motor grader and compacting with 8-10 tonne Vibratory Compactor at OMC to the desired density as per specifications MoRTH 403.
Construction of , , , 150 , , , , , , , , , , m, Length of CC pavement at Ch 6650 - 6800
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.(WMM)
CC Pavement @ Ch. 6650 - 6800
Construction of Cell Fill Compacted Concrete Pavement (M30) over prepared sub base with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm minimum cement content of 375 kg per cum, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with plate vibrator, to achieve the designed flexural strength, finishing and curing as per Technical Specification.
CC Pavement @ Ch. 6650 - 6800
Name of Sub Work: Construction of 1.5 m SPAN RCC Slab culvert at Ch 4430, 5100
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Pipe culvert at : 4430
Removal of Deck
Removal of Body wall
Pipe culvert at : 5100
Removal of Deck
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
1.5mCulvert @ Ch. 4430,
1.5mCulvert @ Ch. 5100,
Name of Sub Work: Construction of 1.5 m SPAN RCC Slab culvert at Ch 5850, 6450,
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Cut Stone Slab at : 5850
Removal of Deck, Abutment & Wings
Cut Stone Slab at : 6450
Removal of Deck, Abutment & Wings
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
1.5mCulvert @ Ch. 5850,
1.5mCulvert @ Ch. 6450,
Name of Sub Work: Construction of 2.0 m SPAN RCC Slab culvert at Ch 5750
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Pipe culvert at : 5750
Removal of Pipes
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
2.0mCulvert @ Ch. 5750,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
2.0mCulvert @ Ch. 5750,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.
2.0mCulvert @ Ch. 5750,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directedFor Footings as 4% Rate for Centering Works
2.0mCulvert @ Ch. 5750,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directedFor Stem as10% Rate for Centering Works
2.0mCulvert @ Ch. 5750,
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
2.0mCulvert @ Ch. 5750,
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
2.0mCulvert @ Ch. 5750,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
2.0mCulvert @ Ch. 5750,
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
2.0mCulvert @ Ch. 5750,
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
2.0mCulvert @ Ch. 5750,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
2.0mCulvert @ Ch. 5750,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
2.0mCulvert @ Ch. 5750,
Name of Sub Work: Construction of Hard Bed at Ch 6360-6375
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Hard bed @ Ch. 6360 - 6375
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Hard bed @ Ch. 6360 - 6375
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Hard bed @ Ch. 6360 - 6375
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Hard bed @ Ch. 6360 - 6375
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works
Hard bed @ Ch. 6360 - 6375
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (DRY LEAN CONCRETE)
Hard bed @ Ch. 6360 - 6375
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 (Pavement Quality Concrete).
Hard bed @ Ch. 6360 - 6375
Provision of Guard Stones
Hard bed @ Ch. 6360 - 6375
Name of Sub Work: Construction of 150 m Side drains at Ch 6650 - 6800 LHS
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Side drains@ Km.6650 - 6800 LHS
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Side drains@ Km.6650 - 6800 LHS
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Side drains@ Km.6650 - 6800 LHS
Name of Sub Work: Construction of , , , 15 m Retaining wall at Ch , , 5755, , , , , , , , , , , ,
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Protective works@ Ch.5755 - 5770 B/S
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Protective works@ Ch.5755 - 5770 B/S
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Protective works@ Ch.5755 - 5770 B/S
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works
Protective works@ Ch.5755 - 5770 B/S
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Sub - Structure as 10% Rate for Centering Works
Protective works@ Ch.5755 - 5770 B/S
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, RETURN WALL, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Protective works@ Ch.5755 - 5770 B/S
Provision of Rumble Strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Road Marker/Road stud with lens Reflector
Provision for Name Board
Provision for PMGSY Logo Board
Provision for Sign Board (1 curve =2Nos)
Provision for Chevron Sign Octogan Board (90cm)
Provision for 60 cm Circle(Mandatory Sign Baoard)
Provision for Reflector - Traffic signs (Near culverts & trees) - Star sign Sticker
Provision for Citizen Information Board
Provision for Maintenance Board
Provision for KM Stone
Provision for HM Stone
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N.Karuppuchamy
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .