| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-Finance | ₹2.7 Cr | L1 | Accepted-Finance Being L1 |
| 2 | L2₹3.1 Cr+₹34.2 L (12.5%)Rejected-Finance KULDEED LACHKHAZANA KISHTWAR KISHTWAR KISHTWAR JAMMU KASHMIR 182204 UDYAM JK 10 0005655 | KISHTWAR | JAMMU AND KASHMIR | 182204 | ₹3.1 Cr+₹34.2 L (12.5%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹3.2 Cr+₹44.2 L (16.2%)Rejected-Finance | ₹3.2 Cr+₹44.2 L (16.2%) | L3 | Rejected-Finance Being L3 |
Tender Value
₹3.8 Cr
EMD Value
₹7.7 L
Closing Date
21 Apr 2026, 2:00 pmClosed
Executive Engineer
Executive Engineer University works department
Construction of balance work of Faculty residence building at Bhaderwah Campus
2026_UDJK_306977_1
enit 177 dated 30-03-2026
Open Tender
Civil Works
Percentage
540 days
University of Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
Executive Engineer University works department
₹7.7 L
24 Apr 2026
30 Mar 2026
23 Apr 2026
30 Mar 2026
21 Apr 2026
30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed .All kinds of soil.50 mbeyond 1m from cutting edge. | 447.83 | Cum. | 673.3 | ₹3,01,523.94 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge All kinds of soil | 144.43 | Cum | 187.3 | ₹27,051.74 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) . | 83.24 | Cum. | 4,826.5 | ₹4,01,757.86 |
| 4 | Providing and laying cement concrete 1:5:10 (1 cement: 5coarse sand: 10 graded crushed brick aggregate 40mm nominal sizes) in foundation and plinth including machine mixing, finishing, consolidation, curing and including form work complete. | 55.27 | Cum. | 4,469.25 | ₹2,47,015.45 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 24.21 | Cum | 5,733.6 | ₹1,38,810.46 |
| 6 | Filling in Plinth with sand under floors including watering, ramming, dressing and consolidation in layers not more than 200 mm thickness complete in all respects. | 97.28 | Cum. | 1,204.5 | ₹1,17,173.76 |
| 7 | Filling in Plinth and under floors river bed material brought from outside including watering, ramming, dressing and consolidation in layers not more than 200mm thickness compete in all respects. | 97.28 | Cum. | 900 | ₹87,552 |
| 8 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 58.5 | Sqm. | 346.7 | ₹20,281.95 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level. | 258.33 | Cum. | 9,027.2 | ₹23,31,996.58 |
| 10 | Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in superstructure above plinth level upto floor v level including curing in Cement mortar 1:4 ( 1 cement : 4 coarse sand). | 489.22 | Sqm. | 1,106.9 | ₹5,41,517.62 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_996270.xls
BOQ • 0.43 MB
bhaddd.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .