Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹12.6 L+₹37,342.97 (3.06%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹12.4 L
EMD Value
₹24,895
Closing Date
7 Sept 2026, 5:00 pmClosed
Executive ENgineer
office of the Executive Engineer Div VI Mapusa
Work of erection of 100 KVA Distribution Transformer Centre near Harmony Celebration Hall in order to release 2 Nos of services connections to Santa Catarina Carlota Dsouza for a total load of 54.18 KW at Brittowaddo Parra Bardez Goa under the Juri
2026_ED_31277_1
Tender10(26-27)/3469 dt24/08/2026
Open Tender
Electrical Works
Percentage
90 days
Parra Bardez Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
₹24,895
1 Oct 2026
24 Aug 2026
8 Sept 2026
25 Aug 2026
7 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | COST OF MATERIAL | - | - | - | - |
| 2 | Pole Numbering | 5 | Nos. | 104.33 | ₹521.65 |
| 3 | Stay wire 7/10SWG | 24.1 | Kgs | 141 | ₹3,398.1 |
| 4 | Supply and Erection PVC insulated single core cable 50 mm2 for D.P. earthing | 50 | Mtr | 135 | ₹6,750 |
| 5 | Supply and Erection of DTC Metering Unit | 1 | Nos | 25,688 | ₹25,688 |
| 6 | Modem for Automatic Meter Reading | 1 | Nos | 6,000 | ₹6,000 |
| 7 | Earthing complete comprises of H.D.G.I. Pipe of class B length 2.5 mts , 40mm nominal bore(outside diameter 48.8mm maximum and 47.9mm minimum ,thickness4.0mm and mass of tube plain end 4.37kg/m) conforming to IS1239 Part 1 1990 asamended upto date and hot dip zinc coating shall conform to IS 4736 as ACSR'Weasel' Conductor( quantity as required) , pit filled with homogeneous layer of20 kgs of charcoal, sand and salt as per the drawing No. CEE/E-829 | 8 | Set | 2,730 | ₹21,840 |
| 8 | Supply and Erection of MS Distribution box as per drg No. CEE/E-689 Revision No. 2 along with MCCB 400 A, Bus bar made out of Aluminium strips 40 x 10 mm, Other accessories & 200 Amps, Porcelain KitKat Fuse Carrier & Base with extended terminals shall be as per drawing No.CEE/E/543-Rev 4 (Set of 3) for 4 feeder arrangement with 1 no of moulded case circuit breaker (MCCB) of 400A, 415V, AC 50 Hz for 100 KVA Distribution Transformer centre | 1 | Nos. | 63,140 | ₹63,140 |
| 9 | Supply and Erection Enamelled Danger board 400V of size 250mm x 200 mm as per the drawing No. CEE/E-490. | 2 | Nos. | 248 | ₹496 |
| 10 | Supply and Erection Anticlimbing deviceas per the drawing No. CEE/E-478. | 2 | Set | 962 | ₹1,924 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 33.76 MB
BOQ_31666.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .