Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC OPP DR SK BANSAL BHATTI ROAD BATHINDA | BATHINDA | BATHINDA | PUNJAB | ₹24.9 L | L1 | Accepted-AOC Lowest Bidder L1 |
| 2 | L2₹26.2 L+₹1.3 L (5.20%)Rejected-AOC | ₹26.2 L+₹1.3 L (5.20%) | L2 | Rejected-AOC Rejected being L2 |
| 3 | L3₹29.2 L+₹4.2 L (17.0%)Rejected-AOC 58 1ST FLOOR PATEL NAGAR BATHINDA | BATHINDA | BATHINDA | PUNJAB | ₹29.2 L+₹4.2 L (17.0%) | L3 | Rejected-AOC Rejected being L3 |
| 4 | L4₹29.5 L+₹4.6 L (18.3%)Rejected-AOC | ₹29.5 L+₹4.6 L (18.3%) | L4 | Rejected-AOC Rejected being L4 |
Tender Value
₹29.5 L
EMD Value
₹58,976
Closing Date
13 Jul 2026, 12:00 pmClosed
Executive Engineer
Construction Division No. 02, PWD B and R, Bathinda
Construction of Main Gate, Road upto Raman Road (Balance portion), Boundary Wall and Security Room at Punjabi University Guru Kashi Campus Talwandi Sabo
2026_CEPW_171163_1
C2/83
Open Tender
Civil Works
Percentage
90 days
Guru Kashi Campus Talwandi Sabo Dist Bathinda
Please refer to the Tender Documents
3 documents required · 3 mandatory
₹5,000
₹58,976
Yes
14 Sept 2026
2 Jul 2026
13 Jul 2026
2 Jul 2026
13 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Building work | - | - | - | - |
| 2 | Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation (CSR NO. 6.6) | 135.61 | Cum | 191.74 | ₹26,001.86 |
| 3 | Dismantling brick work tile, masonry or tile lining (CSR NO. 8.5 B) | 10.62 | Cum | 718.49 | ₹7,630.36 |
| 4 | centering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering Columns(CSR NO. 9.1) | 99.38 | Sqm | 221.24 | ₹21,986.83 |
| 5 | Centering and shuttering for columns (Square or rectangular or poly gonal in plain) Columns (CSR NO. 9.4) | 47.17 | Sqm | 502.52 | ₹23,703.87 |
| 6 | Centring and shuttering for sides and soffits of beam, beams launchings girders bressumers, lintels (CSR NO. 9.6) | 28.79 | Sqm | 400.33 | ₹11,525.5 |
| 7 | Centring and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc (CSR NO. 98) | 27.56 | Sqm | 560.46 | ₹15,446.28 |
| 8 | Cement concrete 1:8:16 (CSR NO. 10.6 B II) | 30.34 | Cum | 4,218.09 | ₹1,27,976.85 |
| 9 | Cement Concrete 1:2:4 with stone ballast or shingle. (CSR NO. 10.13 AII) | 3.67 | Cum | 5,779.19 | ₹21,209.63 |
| 10 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. (CSR NO. 10.15) | 16.39 | Cum | 6,243.49 | ₹1,02,330.8 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
DNIT.pdf
Tender Documents • 18.87 MB
BOQ_348357.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .