Loading…
Loading…
Tender Value
₹11.6 L
EMD Value
₹23,280
Closing Date
13 Jul 2026, 6:55 pm7d left
EXECUTIVE ENGINEER PWD RB DIVISION MENDHAR
EXECUTIVE ENGINEER PWD RB DIVISION MENDHAR
Please refer to BOQ
2026_PWDJK_313762_2
e-NIT No 16 of 2026-27 Dated 27 -06-2026
Open Tender
Civil Works
90 days
MENDHAR
Please refer to Technical Bid as per conditions of e-NIT.
2 documents required · 2 mandatory
₹600
Sub Treasurey Mendhar
₹23,280
27 Jun 2026
27 Jun 2026
14 Jul 2026
27 Jun 2026
13 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 44.59 | Cum | 256.85 | ₹11,454.15 |
| 2 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). | 3.92 | Cum | 4,826.5 | ₹18,919.88 |
| 3 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). | 24.52 | Cum | 5,733.6 | ₹1,40,587.87 |
| 4 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 12.62 | sqm | 416.5 | ₹5,256.23 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 14.92 | cum | 7,571.55 | ₹1,12,967.53 |
| 6 | CAST-IN-SITU
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.84 | cum | 7,788.4 | ₹45,484.26 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.68 | Cum | 9,395.7 | ₹25,180.48 |
| 8 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.1 | Cum | 9,821.85 | ₹50,091.44 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 54.18 | sqm | 286.35 | ₹15,514.44 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 32.16 | sqm | 577.55 | ₹18,574.01 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1015670.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid