| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical y |
| 2 | Accepted-Technical | Accepted-Technical y |
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
18 Aug 2026, 3:00 pmClosed
SE RED Circle Jhansi
SE RED Circle Jhansi
Moth Tehsil Mukhyalay par samudayik bhawan nirman karya.
2026_REDUP_1176024_1
302/RED/Te-BVNR/Jhansi/26-27 Dt. 02.06.2026
Open Tender
Civil Works
Percentage
300 days
Moth Tehsil Mukhyalay par samudayik bhawan nirman
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.5 L
Yes
17 Sept 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including up rooting of trunk vegetation grass bush wood trees and sapling of girth upto 30cm. Measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50m. outside the periphery of area cleared As per DSR.No. 2.31 | - | sqm | 12.17 | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil As per DSR.No. 2.8.1 | 1 | cum | 180.03 | ₹179.85 |
| 3 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : 300 mm dia piles. DSR-20.3.1 | - | R.M. | 2,120.17 | - |
| 4 | Vertical load testing of piles in accordance with IS 2911 (Part IV) includinginstallation of loading platform by Kentledge method and preparation of pilehead or construction of test cap and dismantling of test cap after test etc.complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Single pile upto 50 tonne Safe capacityInitial test (Test Load 2.5 times the Safe capacity) DSR-20.6.1.1 | - | Nos. | 37,879.97 | - |
| 5 | Vertical load testing of piles in accordance with IS 2911 (Part IV) includinginstallation of loading platform by Kentledge method and preparation of pilehead or construction of test cap and dismantling of test cap after test etc.complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Single pile upto 50 tonne Safe capacity
Routine test (Test Load 1.5 times the Safe capacity) DSR-20.6.1.2 | - | Nos. | 13,577.77 | - |
| 6 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. As per DSR.No. 2.25 (a) | - | cum | 484.46 | - |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. As per DSR no 2.27 | - | cum | 1,468.79 | - |
| 8 | Providing and injecting chemical emulsion for PRE-CONSTRUCTIONAL anti-termite treatment and creating a chemical barrier under and around the column pits, wall trenche basement excavation top surface if plinth filling junction of wall and floor along the external per meter of binding expension joints surrounding of pipes and conduit etc. Complete (Plinth area of building at ground floor only shall be measured as per I.S. 6313 part 2013). IMIDACLOPRID SC 30.5 concentrate or any other approved material such as Hepthachlor or Chlordance will be used. The rate of application of chemical emulsion shall be as follows: I. Treatment for masonry and foundation 5 liters/sqm., II. Back fill in immediate contact with foundation 7.5 liters/sqm., III. Treatment of top surface of plinth filling 5 liters/sqm., IV. Treatment juction of soil along external per meter building 7.50 liters/sqm., V. Treatment of soil under apron along external perimeter 5 liters/sqm. as per PWD Jhansi SOR, Ch. no. 18, Item SI.No. 1 | - | Sqm | 193.8 | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) As per DSR no. 4.1.8 | - | cum | 4,711.18 | - |
| 10 | Brick work with common burnt clay (non modular) bricks of class -150 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) As per DSR No- 6.1.1 | - | cum | 5,097.54 | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
SBD302.pdf
Tender Documents • 1.25 MB
BOQ_2210035.xls
BOQ • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .