| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC NA | ₹10.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹10.3 LRejected-Finance TAMIL NADU TN | TIRUVANNAMALAI | TAMIL NADU | 604407 | ₹10.3 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | A NARAYANAN | A THIRUVENGADAM |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete SS.20B 10 cum Manual/mechanical excavation of pits sized 3 ft x 3 ft x 3 ft depth.Removal of loose soil and debris.
Ensuring level base and vertical sides.
Disposed soil to be shifted to designated area or site boundary. | 16 | cum | 1,440 ₹1,699.20 | 1,584 ₹1,869.12 |
| 2.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 3 | cum | 16,146 ₹19,052.28 | 16,176 ₹19,087.68 |
| 3.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 104 | Kgs | 9,692.8 ₹11,437.50 | 9,880 ₹11,658.40 |
| 4.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 2 | cum | 17,101.2 ₹20,179.42 | 17,120 ₹20,201.60 |
| 5.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 15 | sqm | 10,528.5 ₹12,423.63 | 10,650 ₹12,567 |
| 6.00 | Supplying and filling in foundation and basement with stone dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 8 | cum | 2,468 ₹2,912.24 | 2,480 ₹2,926.40 |
| 7.00 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - | 4 | cum | 30,060 ₹35,470.80 | 30,080 ₹35,494.40 |
| 8.00 | Laying of 4" PVC pipes at adequate intervals for better slope and water drainage through the entire lenght of the brickwork at 15 feet intervals | 3.6 | Rm | 990 ₹1,168.20 | 1,008 ₹1,189.44 |
| 9.00 | Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 92 | sqm | 30,820 ₹36,367.60 | 30,912 ₹36,476.16 |
| 10.00 | Supplying, fabricating, erecting structural steel work for roofing welded or bolted type using MS channels, angles, plates and round bars etc. conforming to IS specification including primer coating and enamal painting as per Design given by the departmental officers etc, complete as per standard specification | 1,197 | Kgs | 1,37,655 ₹1.6 L | 1,42,443 ₹1.7 L |
Updated dates
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
29 Jan 2026, 3:00 pmClosed
TCMC Zone-2
New Colony 3rd Main Road,Chromphet
TCMC- Construction of Pickel Ball Court at Chira Township Park and Play Filed in Ward No.15 Tambaram City Municipal Corporation Zone II
2026_DMA_643414_11
171/2025/E1
Open Tender
Civil Works
90 days
TCMC-Zone-2
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
4 Jun 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete SS.20B 10 cum Manual/mechanical excavation of pits sized 3 ft x 3 ft x 3 ft depth.Removal of loose soil and debris. Ensuring level base and vertical sides. Disposed soil to be shifted to designated area or site boundary.
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers -
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Supplying and filling in foundation and basement with stone dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification -
Laying of 4" PVC pipes at adequate intervals for better slope and water drainage through the entire lenght of the brickwork at 15 feet intervals
Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Supplying, fabricating, erecting structural steel work for roofing welded or bolted type using MS channels, angles, plates and round bars etc. conforming to IS specification including primer coating and enamal painting as per Design given by the departmental officers etc, complete as per standard specification
Top Fixture Support: Pre-drilled holes or welded brackets for: Net hooks GI cable supports LED light mounting (if required) using 50x50x3mm L angles
Supply and fixing of 200 W LED Flood Light fittings with LED including cost and albour charges etc complete
Supply and clarnping of 2 x 4 sq.mm. PVC LTUG armoured cable on post or on wall with MS clamps as per Sd 193
Supply and laying of 4x16 sq.mm PVC armoured LTUG cable in a trench to be excavated at a depth of 0.75 metre putting 0.15 metre layer of sand and covering the cable completely with bricks and sand and refilling the earth to make good SD 199
Supply and laying of 3.5x25 sq.mm PVC armoured LTUG cable in a trench to be excavated at a depth of 0.75 metre putting 0.15 metre layer of sand and covering the cable completely with bricks and sand and refilling the earth to make good Sd 200
Supply and frxing of brass cable gland PVC armoured LTUG cable with earth connectio
3.50x25 sqmm SD 164
Supply and fixing of 4 way Horizontal Triple pole and neutral MCB sheet steel enclosure distribution board with double door (metal) with 1 no. 40A 4P MCB Isolator as incoming and 12 nos. 6A to 32A SP MCB as outgoing on wall with earth connection only. Higher End Sd 532
Supply and fixing of 7 segment 4 way TPN MCB sheet steel distribution board (Higher end) with metal / acrylic door cover flush type /surface type fitted with busbars and neutral links with single / three phase MCB outgoings and seperate 4 way provision for accomodating one no. 4 pole incoming MCB / Isolator and another seperate 4 way provision for accomodating one no. 4 pole ELCB / RCD (totally 8 ways in one segment) (3x 4 ways in each segment) and seperate provision for MCB / Isolators ( totally 12 nos.) for sub incomers in 3 segments with lable holder and provison for taking up cable for size not less than 35 sq.mm. with the following on wall with earth connection only. Sd 618
Material Type: PVC-coated GI (Galvanized Iron) mesh Minimum wire thickness: 2 mm Coating: High-grade PVC for enhanced rust resistance and weather protection Mesh Size: Grid dimensions: 2 inches x 2 inches square openings Fencing Dimensions: Height: 10 feet from the ground level on all four sides Coverage: Complete enclosure of the court to ensure safety and prevent unauthorized access.Installation Details: GI mesh to be fixed on sturdy steel poles (as per site condition) Poles to be spaced at equal intervals for optimal mesh tension and support All joints to be secured with rust-proof fastener Finishing: All exposed metal components will be treated with anti-corrosive paint (where applicable) Mesh will be tensioned uniformly to avoid sagging
surface prepartion removal of wedgesand levelling using earth moving machnaries including hire chaefes and all labour cahrges etc complete
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Primer (PACE COURT Acrylic Concrete Primer) High-strength, concentrated acrylic primer used to enhance adhesion of acrylic layers . Must be diluted onsite (1:2 with water). Installation: Apply diluted primer evenly using brush/roller. Must cure for 2 hours minimum before next coat Acrylic Resurfacer Acrylic Resurfacer (PACE COURT™ Acrylic Resurfacer) 100% acrylic emulsion blended with silica sand and cement to smooth and level surfaces. Mix Ratio: 50 kg Acrylic Resurfacer 40 kg Cement 50 kg Silica Sand (#80) Water @ 1.10 kg/m² Installation: Apply 1–2 coats using rubber squeegee Ensure cross-directional application for each coat (90° angle) Fill minor surface undulations as needed Coverage: ~0.29 – 0.40 kg/m²/application Base colour Coat (PACE COURT™ System) Color Coat (PACE COURT™ Acrylic Color Coat) Durable, UV-resistant, textured acrylic coating used for surface color finish and raction. Available in Green M, Red, Blue M. Mix Ratio: 25 kg Acrylic Color 7–12 kg Silica Sand (#80) Water @ 0.615 kg/m² Installation: Apply 2 coats perpendicular to each other using rubber squeegee Base colour Coat (PACE COURT™ System) Color Coat (PACE COURT™ Acrylic Color Coat) Durable, UV-resistant, textured acrylic coating used for surface color finish and traction. Available in Green M, Red, Blue M. Mix Ratio: 25 kg Acrylic Color 7–12 kg Silica Sand (#80) Water @ 0.615 kg/m² Installation: Apply 2 coats perpendicular to each other using rubber squeegee
Providing Pickle ball net and post including cost and fixing charges etc complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_771126.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid