Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹7.7 L+₹11,269 (1.49%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹8.0 L+₹40,024 (5.29%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹10.0 L+₹2.5 L (32.7%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/S SHRI PAL JAIN L3 | M/S TILAK SINGH YADAV L2 | M/S. PARMENDRA SINGH CONSTRUCTION COMPANY L4 | SATYA NARAYAN SHARMA L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation for making canal section & key drains for canal lining in all type of strata with all lead & lift including all material, labour ,T&P etc. required for proper completion of work. | 89 | Cum | 50 ₹4,450 | 55 ₹4,895 | 70 ₹6,230 | 30 ₹2,670 Lowest |
| 2.00 | Earth work in filling for making canal section for cement concrete in all type of strata with all lead & lift including all material, labour ,T&P etc. required for proper completion of work. | 159 | Cum | 250 ₹39,750 | 250 ₹39,750 | 50 ₹7,950 Lowest | 350 ₹55,650 |
| 3.00 | Preparation of Subgrade excluding cost of earth work including all material, labour, T&P etc. required for proper completion of work | 961 | Sqm | 10 ₹9,610 | 10 ₹9,610 | 20 ₹19,220 | 6 ₹5,766 Lowest |
| 4.00 | Providing & laying 200 micron LDPE film black polythene sheet below C.C. lining including cost of all material, labour , T&P etc. required for proper completion of work. | 1,280 | Sqm | 50 ₹64,000 Lowest | 50 ₹64,000 Lowest | 50 ₹64,000 Lowest | 55 ₹70,400 |
| 5.00 | Providing & laying cement concrete 1:2:4 (M-15,A-20) with graded metal of maximum size 20 mm for including cost of all material, labour , T&P etc. required for proper completion of work, but excluding cost of Centering & shuttering . | 118 | Cum | 5,200 ₹6,13,600 | 4,800 ₹5,66,400 Lowest | 6,800 ₹8,02,400 | 5,000 ₹5,90,000 |
| 6.00 | Providing and fixing Centering & shuttering for concrete work including cost of all material, labour , T&P etc. required for proper completion of work. with it’s removal . | 470 | Sqm | 130 ₹61,100 | 150 ₹70,500 | 200 ₹94,000 | 55 ₹25,850 Lowest |
| 7.00 | Providing and filling 15 x 35 mm joints of C.C. Lining with bitumen sealing compound including cost of all material, labour , T&P etc. required for proper completion of work . | 430 | RM | 10 ₹4,300 Lowest | 30 ₹12,900 | 25 ₹10,750 | 15 ₹6,450 |
Tender Value
₹12.8 L
EMD Value
₹26,000
Closing Date
13 Feb 2026, 3:00 pmClosed
EE ICD - 1st Lalitpur
Office of The EE ICD - 1st Lalitpur
Laying of M-15 Grade Cement Concrete 1.2.4 in Ashaupur Minor between km 3.750 to 4.000 of Lower Rajghat Canal System
2026_UPIDC_1111095_4
05/EE/2025-26
Open Tender
Civil Works
Item Rate
30 days
Lalitpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹26,000
5 May 2026
31 Jan 2026
13 Feb 2026
31 Jan 2026
13 Feb 2026
31 Jan 2026
Earth work in Excavation for making canal section & key drains for canal lining in all type of strata with all lead & lift including all material, labour ,T&P etc. required for proper completion of work.
Earth work in filling for making canal section for cement concrete in all type of strata with all lead & lift including all material, labour ,T&P etc. required for proper completion of work.
Preparation of Subgrade excluding cost of earth work including all material, labour, T&P etc. required for proper completion of work
Providing & laying 200 micron LDPE film black polythene sheet below C.C. lining including cost of all material, labour , T&P etc. required for proper completion of work.
Providing & laying cement concrete 1:2:4 (M-15,A-20) with graded metal of maximum size 20 mm for including cost of all material, labour , T&P etc. required for proper completion of work, but excluding cost of Centering & shuttering .
Providing and fixing Centering & shuttering for concrete work including cost of all material, labour , T&P etc. required for proper completion of work. with it’s removal .
Providing and filling 15 x 35 mm joints of C.C. Lining with bitumen sealing compound including cost of all material, labour , T&P etc. required for proper completion of work .
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Lot-4.pdf
Tender Documents • 1.72 MB
BOQ_2052348.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .