Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC | L1 | Accepted-AOC Tender Finalized | |
| 2 | L2₹13.9 L+₹5,967.50 (0.43%)Rejected-Finance | L2 | Rejected-Finance Above the estimate rate |
| Sl No | Description | Qty | Unit | Meenu Industries PVT.LTD. L2 | P PARINATHAN L1 |
|---|---|---|---|---|---|
| 1.00 | Cutting the Existing Dismantling Plain Cement Concrete including all labour charges etc., complete complying with standard specifications. W-0034 | 17.6 | m3 (one Cubic metre) | 525 ₹9,240 | 520 ₹9,152 Lowest |
| 2.00 | Removal of Cut Stone Slabs / RCC Cover Slabs including all labour charges etc., complete complying with standard specifications. W-0021 | 76.8 | m2 (one Square metre) | 560 ₹43,008 | 545 ₹41,856 Lowest |
| 3.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 13.5 | m3 (one Cubic metre) | 200 ₹2,700 | 198 ₹2,673 Lowest |
| 4.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 7.2 | m3 (one Cubic metre) | 5,830 ₹41,976 | 5,817 ₹41,882.4 Lowest |
| 5.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 2.10 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton and as directed by the departmental Officers(Payment for centering shall be given after the concrete is laid) Sub Data - 2 (B) | 233.5 | m2 (one Square metre) | 490 ₹1,14,415 | 480 ₹1,12,080 Lowest |
| 6.00 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. - Mixing by mechanical means | 40.9 | m3 (one Cubic metre) | 6,340 ₹2,59,306 | 6,336 ₹2,59,142.4 Lowest |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means | 91.3 | m3 (one Cubic metre) | 7,100 ₹6,48,230 | 7,097 ₹6,47,956.1 Lowest |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 50 | Kg (one Kilogram) | 95 ₹4,750 | 92 ₹4,600 Lowest |
| 9.00 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC 1:2:4 (one cement, two crushed stone sand and four aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers. 75mm thick | 4 | m2 (one Square metre) | 980 ₹3,920 | 940 ₹3,760 Lowest |
| 10.00 | Refixing Cut Stone Slab / RCC Cover Slab including all labour charges etc., complete complying with standard specifications. W-0022 | 76.8 | m2 (one Square metre) | 610 ₹46,848 | 602 ₹46,233.6 Lowest |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
6 Oct 2025, 3:00 pmClosed
Commissioner Kottakuppam Municipality
Commissioner Kottakuppam Municipality
Providing Cement Concrete Road at ward no 15, Bharkath Nagar 2nd Main Road and Bharkath Nagar 2nd Main Road 1st Cross Street in Kottakuppam Municipality
2025_MAWS_610987_1
1512/2025/E1
Open Tender
Civil Works
Works
180 days
Kottakuppam Municipality
Yes Enclosed
3 documents required · 3 mandatory
₹0
₹14,000
17 Feb 2026
3 Oct 2025
6 Oct 2025
3 Oct 2025
6 Oct 2025
3 Oct 2025
3 Oct 2025 - 6 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_730114.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .