Loading…
Loading…
Tender Value
₹5.6 L
EMD Value
₹7,000
Closing Date
13 Jul 2026, 4:00 pm5d left
P E (Civil) Bokaro Colliery
P E (Civil) Bokaro Colliery, BnK Area, PO. Sunday Bazar, Bokaro Jharkhand PIN -829127
Providing barbed wire fencing toward (1) the western and south western side of the mines and (2) towards the southern side of the mines between PWD road from Kathara to Phusro and toe of active spoil bank under Bokaro Colliery of BnK Area
2026_CCL_361644_1
PE(C)/BKO/E -Tender/26-27/02, dt. 03.07.2026
Open Tender
Civil Works - Others
30 days
Bokaro Colliery
As per NIT
3 documents required · 3 mandatory
₹7,000
3 Jul 2026
3 Jul 2026
14 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
4 Jul 2026 - 7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil | 1 | Cum | 139.7 | ₹139.56 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1 | Cum | 7,424.45 | ₹7,417.03 |
| 3 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand incuding manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 20% : 3 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) upto 20%). | 1 | Cum | 9,432.95 | ₹9,423.52 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1 | Kg | 105.6 | ₹105.49 |
| 5 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | - | Meter | 10.5 | - |
| 6 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | Sqm | 10.55 | - |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | - | Sqm | 112.3 | - |
| 8 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.