| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Finance | -22.67% | ₹4.7 L | L1 | Admitted-Finance |
| 2 | L2₹4.8 LAdmitted-Finance | -21.32% | ₹4.8 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Part-I Not Approved |
Tender Value
₹6.1 L
EMD Value
₹15,000
Closing Date
23 Apr 2026, 2:00 pmClosed
SE Civil
57 George town
Maintenance Repair of old security wall
2026_UPCTL_1128475_1
66/ECTC,PRG/2025-26
Open Tender
Civil Works
Percentage
60 days
Varanasi
Refer to tender documents
2 documents required · 2 mandatory
₹1,180
SE CTC PRG A/c 8832005900000016 IFSC PUNB0883200
₹15,000
15 Jun 2026
21 Mar 2026
24 Apr 2026
21 Mar 2026
23 Apr 2026
21 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.(DSR 2.6.1) | |||||
| 2Providing and laying 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(DSR 4.1.10)) | |||||
| 3Brick work in foundation & plinth with old dismantled bricks (supplied by department free of cost) and coarse sand mortar in 1:6 including supply of all other materials, labour, removing mortar & cleaning of old & used bricks,T&P etc complete.( CSI:6.18) | |||||
| 4Demolishing brick work In cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge(DSR 15.7.4). | |||||
| 5Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts(DSR 5.9.6) | |||||
| 6Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Cement mortar 1:6 (1 cement : 6 coarse sand) in superstructure above plinth level up to floor V level in all shapes and sizes in (DSR 6.4.2) | |||||
| 712 mm cement plaster1:4 (1 cement: 4 coarse sand) of mix :(DSR 13.4.1) | |||||
| 8Providing and laying 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level .(DSR 4.1.2) | |||||
| 9Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.(DSR 13.80) | |||||
| 10Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) (DSR 13.46.1) | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.46 MB
66DocsforPathrahiyaSonebhadraSecuritywallVNS.pdf
Tender Documents • 2.56 MB
BOQ_2104799.xls
BOQ • 0.32 MB
CorriETN66.pdf
PDF • 0.74 MB
1Corri66.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].