Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹5.5 Cr Construction of Mezzanine floor and up-gradation of VIGA/EIGA Powder Manufacturing Machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi (SH: Balance work). | Construction of Mezzanine floor and up-gradation of VIGA/EIGA Powder Manufacturing Machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi (SH: Balance work). | ₹5.5 Cr | L1 |
| 2 | L2₹5.6 Cr Construction of Mezzanine floor and up-gradation of VIGA/EIGA Powder Manufacturing Machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi (SH: Balance work). | Construction of Mezzanine floor and up-gradation of VIGA/EIGA Powder Manufacturing Machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi (SH: Balance work). | ₹5.6 Cr | L2 |
| Sl No | Description | Qty | Unit | SAS INFRA L1 | MAYANK ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1 | Composite work | - | - | -22.07 ₹5.5 Cr | -20.23 ₹5.6 Cr |
Tender Value
₹7.1 Cr
EMD Value
₹14.1 L
Closing Date
24 Mar 2026, 3:00 pmClosed
EE&SM( C) -1
ALOK KUMAR
7905365783
Executive Engineer and SM Civil 1 BHU Project Varanasi behind Central Office CPWD BHU Varanasi 22100
Construction of Mezzanine floor and up-gradation of VIGA/EIGA Powder Manufacturing Machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi (SH: Balance work).
146067
08/EE/BHUPD-1/2025-26
OPEN
Civil Works - Buildings
7 months
Kanpur Nagar, Uttar Pradesh
6 documents required · 6 mandatory
₹14.1 L
Not Applicable
7 Mar 2026
7 Mar 2026
24 Mar 2026
24 Mar 2026
10 Mar 2026
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT082025-26.pdf
document • 28.38 MB
Download all tender documents and submit your bid