Tender Value
₹1.6 Cr
EMD Value
₹2.0 L
Closing Date
13 Jun 2026, 6:00 pm
Area Engineer Civil Satgram-Sripur Area
Office of the Area Engineer Civil, Satgram-Sripur Area, PO-Devchandnagar, WestBengal-713332
Construction of Retaining wall Embankment with bed pitching and retaining wall along Nonia Jore at Bhanora West OCP for execution of Hired OC mining and Highwall mining. (Re-tender)
2026_ECL_360392_1
ECL/SSA/GM/AE(C)/e-T/26-27/07 date 26.05.2026
Open Tender
Civil Works - Others
120 days
Bhanora West OCP
As per NIT
5 documents required · 5 mandatory
₹2.0 L
28 May 2026
28 May 2026
15 Jun 2026
29 May 2026
13 Jun 2026
29 May 2026
29 May 2026 - 6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 735 | Cum | 188.75 | ₹1,38,731.25 | - |
| 1.02 | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil. | 105 | Cum | 78.15 | ₹8,205.75 | - |
| 1.03 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 31.5 | Cum | 1,061.6 | ₹33,440.4 | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 20 mm nominal size). | 296.63 | Cum | 5,434.55 | ₹16,12,050.57 | - |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 408 | Cum | 6,903.9 | ₹28,16,791.2 | - |
| 1.06 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 137.37 | Cum | 8,030.65 | ₹11,03,170.39 | - |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 40,800 | kg | 95.75 | ₹39,06,600 | - |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 122.24 | Sqm | 269.3 | ₹32,919.23 | - |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1,354.35 | Sqm | 562.9 | ₹7,62,363.62 | - |
| 1.1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 245 | Cum | 121.05 | ₹29,657.25 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.71 MB
BOQ_373259.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid