Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.8 LAccepted-AOC | ₹58.8 L Quoted ₹70.6 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | K.RAMESH L1 |
|---|---|---|---|---|
| 1.00 | Providing and laying PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete including form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification. | 43 | M3 | 10,399 ₹4.5 L |
| 2.00 | Providing and laying R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 20 | M3 | 12,500 ₹2.5 L |
| 3.00 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with a minimum cement content of 360 kg per cu.m for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (up to basement level) (RCC Wall) | 79 | M3 | 17,000 ₹13.4 L |
| 4.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete. | 5 | MT | 70,000 ₹3.5 L |
| 5.00 | Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos.washer in High Tensile Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site | 1,470.04 | Kgs. | 250 ₹3.7 L |
| 6.00 | Filling with good quality gravel including cost of all materials, transport, consolidation, labour, lead, lift etc., complete as directed by the dept Engineer at site | 5,370.4 | M3 | 600 ₹32.2 L |
| 7.00GST for bidders within TamilNadu | ||||
| 7.01 | SGST | 1 | percentage | 0.09 ₹5.4 L |
| 7.02 | CGST | 1 | percentage | 0.09 ₹5.4 L |
| 8.00 | GST for bidders outside TamilNadu (IGST) | 1 | percentage | - |
Tender Value
₹58.9 L
EMD Value
₹58,900
Closing Date
5 Mar 2026, 2:00 pmClosed
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2026_EB_668080_1
LT-043/25-26 of SE/GCC-I/CNI
Limited
Civil Works
60 days
Thiruvalangadu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹58,900
Yes
2 Jun 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
Providing and laying PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete including form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification.
Providing and laying R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with a minimum cement content of 360 kg per cu.m for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (up to basement level) (RCC Wall)
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete.
Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos.washer in High Tensile Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Filling with good quality gravel including cost of all materials, transport, consolidation, labour, lead, lift etc., complete as directed by the dept Engineer at site
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_802690.xls
BOQ • 0.28 MB
LT043.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid