Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LI₹62.5 LAccepted-AOC VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | ₹62.5 L | LI | Accepted-AOC L1 |
| 2 | L2₹65.4 LRejected-Finance | ₹65.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹68.1 LRejected-Finance 0 KUMHARPURA PHULWARIYA CANTT VARANASI UTTAR PRADESH 221106 UDYAM UP 75 0135081 | VARANASI | UTTAR PRADESH | 221106 | ₹68.1 L | L3 | Rejected-Finance L3 |
| 4 | L4₹71.3 LRejected-Finance | ₹71.3 L | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical VILLAGE POST FATEHPUR SANGAT GOSAIGANJ DISTRICT SULTANPUR | GOSAIGANJ | SULTANPUR | UTTAR PRADESH | - | - | Rejected-Technical As Per Uploaded |
| Sl No | Description | Qty | Unit | M/S ADITYA CONSTRUCTION COMPANY L1 | M/S ARYA ENTERPRISES L3 | M/S ANAND CONSTRUCTION COMPANY L4 | santosh kumar pal L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismentalling of brick work with cement mortar including cost of all lead lift, labour and T&P etc. Complete of work. | 35.01 | M3 | 400 ₹14,004.40 | 400 ₹14,004.40 | 100 ₹3,501.10 | 570 ₹19,956.27 |
| 2.00 | Dismentalling of CC (bed block) both side including cost of all lead lift, labour and T&P etc. Complete of work. | 4.3 | M3 | 280 ₹1,204 | 400 ₹1,720 | 350 ₹1,505 | 376 ₹1,616.80 |
| 3.00 | E/W in lip cutting for proper disposal, compaction and dressing i/c cost of all lead lift T&P material labour etc complete as per direction of engineer-in- charge. | 179.56 | M3 | 80 ₹14,364.80 | 60 ₹10,773.60 | 70 ₹12,569.20 | 84 ₹15,083.04 |
| 4.00 | E/W in foundation including back filling with proper dressing and manual compaction in all type of soil including of lead, lift T&P etc. complete as per direction of engineer-in-charge | 232.29 | M3 | 90 ₹20,906.10 | 80 ₹18,583.20 | 90 ₹20,906.10 | 103 ₹23,925.87 |
| 5.00 | E/W in filling for making canal section by power transport lead up to 1km lift upto 1.50 m with manual compaction and dressing etc. completion of work | 2,698.2 | M3 | 150 ₹4.0 L | 135 ₹3.6 L | 150 ₹4.0 L | 223.75 ₹6.0 L |
| 6.00 | Centering and shuttering for foundation and sleeper including cost of all material labour T&P etc. complete as per direction of engineer-in-charge. | 400.67 | M² | 150 ₹60,100.50 | 150 ₹60,100.50 | 180 ₹72,120.60 | 210 ₹84,140.70 |
| 7.00 | Laying C.C. 1:3:6 in foundation with crushed stone grit size 20 mm to 40 mm and coarse sand and including cost of all lead, lift, material, labour, T&P etc. completion of work | 61.44 | M3 | 8,500 ₹5.2 L | 9,000 ₹5.5 L | 10,200 ₹6.3 L | 8,500 ₹5.2 L |
| 8.00 | Raising of slab by lifting divice including hiring charges with all carriage, expenditure, labour, T&P etc. for completion of work | 147.82 | M² | 25 ₹3,695.50 | 2,200 ₹3.3 L | 2,500 ₹3.7 L | 3,500 ₹5.2 L |
| 9.00 | Ist class B/W in 1:4 CM with C.sand and cement i/c cost of all material labour T&P etc completion of work. | 172.63 | M3 | 6,200 ₹10.7 L | 6,800 ₹11.7 L | 6,850 ₹11.8 L | 6,280 ₹10.8 L |
| 10.00 | Centering & shuttering for R.C.C. Slab & bed block including cost of all lead, lift, material, labour, T&P etc complete. | 117.25 | M² | 750 ₹87,937.50 | 600 ₹70,350 | 900 ₹1.1 L | 800 ₹93,800 |
Tender Value
₹82.4 L
EMD Value
₹1.6 L
Closing Date
6 Mar 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Repairing, Slab Rasing and Protection work of 07 Nos. Old Pucca structure and Repairing, Slab Rasing and Protection work of 07 Nos. Old Pucca structure and construction of One No. New VRB Between Km. 0.000 To Km. 2.500 of Bhatpar Dy in Santkabirnagar
2026_UPIDC_1111408_11
06/S.E/2025-26
Open Tender
Civil Works
180 days
Khalilabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,972
₹1.6 L
10 Apr 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
Dismentalling of brick work with cement mortar including cost of all lead lift, labour and T&P etc. Complete of work.
Dismentalling of CC (bed block) both side including cost of all lead lift, labour and T&P etc. Complete of work.
E/W in lip cutting for proper disposal, compaction and dressing i/c cost of all lead lift T&P material labour etc complete as per direction of engineer-in- charge.
E/W in foundation including back filling with proper dressing and manual compaction in all type of soil including of lead, lift T&P etc. complete as per direction of engineer-in-charge
E/W in filling for making canal section by power transport lead up to 1km lift upto 1.50 m with manual compaction and dressing etc. completion of work
Centering and shuttering for foundation and sleeper including cost of all material labour T&P etc. complete as per direction of engineer-in-charge.
Laying C.C. 1:3:6 in foundation with crushed stone grit size 20 mm to 40 mm and coarse sand and including cost of all lead, lift, material, labour, T&P etc. completion of work
Raising of slab by lifting divice including hiring charges with all carriage, expenditure, labour, T&P etc. for completion of work
Ist class B/W in 1:4 CM with C.sand and cement i/c cost of all material labour T&P etc completion of work.
Centering & shuttering for R.C.C. Slab & bed block including cost of all lead, lift, material, labour, T&P etc complete.
Cutting bending and binding of steel bar for reinforcement including cost of steel lead, lift, material, labour, T&P etc complete.
Laying and fixing of joint filler board i/c cost of all material labour T&P etc complete.
Laying R.C.C. 1:1.5:3 in Bed Block & Slab with chopan coarse sand & dalla crushed stone grit size 10 mm to 20 mm including cost of all lead, lift, material, labour, T&P etc. Completion of work.
Laying c.c 1:1.5:3 with dala crushed stone grit 4.75mm-20.00mm size and chopan coarse sand and i/c cost of all material labour, T&P etc.
Struck deep cement pointing 1:2 C.M in brick work i/c cost of all material labour T&P etc. complete of work.
E/W in making of ramp for aproch of V.R.B of both side including mannually compaction with all lead lift labour T&P etc. complete of work.
Ist class brick on edge soling including preparation of sub grade and filling joint local earth on ramp.
Preparation of sub grade for lining work including cost of all material labour T&P etc. complete as per direction of engineer-in-charge.
Laying local sand as filler material in bed and side slope with cost of material, labour etc. As per required for proper completion of work. complete as per direction of engineer-in-charge.
Supply and laying LDPE film 200 micron thick in bed and side slope over filler material including cost of all material, labour etc. required for proper completion of work.
Laying 75 mm thick CC 1:1.5:3 grade with dala crust stone grit size 4.75 to 20 mm and C-sand for lining by manual in bed and side slope including cost of all material, labour etc. required for proper completion of work. complete as per direction of engineer-in-charge.
Making construction joint, painting with sealing primer and filling with sealing compund i/c cost of all material labour T&P etc complete.
Making and Fixing of Wheel Guard in U/S & D/S of VRBs & DRBs with cost of all carriage, material, labour T&P etc. With complete of work.
Painting on old surface of B/W two coat i/c cost of all materials labour T&P etc. required for proper completion of work.
Painting on New surface of B/W two coat i/c cost of all materials labour T&P etc. required for proper completion of work.
Writing letter above 80mm size on VRBs & DRBs of bhatpar dy including all material, labour, paint, brush and T&P etc. complete of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_2083708.pdf
BOQ Comparative Chart
xlsx
finsummary_2083708.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.95 MB
Buklet.pdf
Tender Documents • 3.54 MB
BOQ_2083708.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid