| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹86.6 LAdmitted-Finance | -18.05% | ₹86.6 L | L1 | Admitted-Finance |
| 2 | L2₹86.9 LAdmitted-Finance | -17.77% | ₹86.9 L | L2 | Admitted-Finance |
| 3 | L3₹87.9 LAdmitted-Finance | -16.79% | ₹87.9 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Document Not complete |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Document Not complete |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
30 Jul 2026, 3:00 pmClosed
SE Vrindavan Circle
SE Vrindavan Circle, UPAVP, Lko
Construction of RCC Culvert and Covering of Trunk Drain at Sec-13 VrindavanYojna Lucknow
2026_UPHDB_1168085_1
2022/M-13/283 Dt. 06.07.26 (Infra Sec-13)
Open Tender
Civil Works
Percentage
180 days
Sec-13, Vrindavan Yojna Lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
EE, CD Lko-05, UPAVP, Lko
₹2.1 L
10 Aug 2026
10 Jul 2026
30 Jul 2026
10 Jul 2026
30 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil (loam, day or sand) i/c lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavated earth in to the trenches or into the side of foundation trenches or into the plinth and removal and disposal of surplus earth as per direction by E/I. | 1,252.56 | Cum | 156 | ₹1,95,399.36 |
| 2 | Providing and laying of cement concrete in 1:4:8 (1 cement 4 C.sand 8 40mm stone balast) including supply of all materials labour T&P etc.complete with form work as per direction by E/I., | 45.9 | Cum | 6,099 | ₹2,79,944.1 |
| 3 | Class 150 Brick Work in 1:6 cement and coarse sand (FM 1.50 to 2.00) mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work & as per direction by E/I. | 658.72 | Cum | 6,519 | ₹42,94,195.68 |
| 4 | Providing and laying of cement concrete in 1:1.5:3 (1 cement 1.5 C.sand 3 20mm stone grit) including supply of all materials labour T&P etc.complete with form work as per direction by E/I., | 76.5 | Cum | 7,314 | ₹5,59,521 |
| 5 | R.C.C. work with cement approved coarse sand and 20mm gauge stone grit in the proportion of 1:1.5:3 in slabs excluding supply of reinforcement and including necessary centering & shuttering etc and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item. required for proper completion of the work & as per direction by E/I. | 31.18 | Cum | 7,664 | ₹2,38,963.52 |
| 6 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerata retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note Cement content considered in this item is @ 330 kg/cum Excess/ less cement used as per design mix payable/recoverable separately) required for proper completion of the work & as per direction by E/I. | 152.39 | Cum | 9,756 | ₹14,86,716.84 |
| 7 | M..S. or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work. required for proper completion of the work & as per direction by E/I. | 165.45 | Qtl | 8,925 | ₹14,76,641.25 |
| 8 | Centering and shuttering including strutting propping etc and removal of form for lintels, beams plinth beam, girders, bressumers and cantilevers required for proper completion of the work & as per direction by E/I. | 608.88 | Sqm | 301 | ₹1,83,272.88 |
| 9 | Disposal of surplus earth including loading, unloading cartage and disposal in low lying area as directed by the Engineer-in-charge upto 5 Km within the scheme and from the site of work and also including leveling and dressing of surface in required level and slope. required for proper completion of the work & as per direction by E/I. | 501.02 | cum | 183.5 | ₹91,937.17 |
| 10 | Dismantaling of old existing ramp/slabs i/e disposal of dismantaled material within 5km distance as per direction by E/I. | 24.48 | cum | 1,255.5 | ₹30,734.64 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Technical13.pdf
Tender Documents • 7.66 MB
Financial.pdf
Tender Documents • 0.57 MB
BOQ_2190884.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].