Loading…
Loading…
Tender Value
₹18.7 L
EMD Value
₹37,360
Closing Date
25 Aug 2026, 5:00 pmDue tomorrow
DALCHAND
Municipal Council Nuh
Construction of RMC street and drain from NH 248A to house of Mamman via Janu patwari house in ward 04 in MC Nuh
2026_HRY_541639_1
2026C9BF6226 B545 4EB7 B845 4B78C5285BE2337ULB
Open Tender
Civil Works
Works
150 days
MC Nuh
2 documents required · 2 mandatory
₹1,000
₹37,360
Yes
18 Aug 2026
18 Aug 2026
26 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
18 Aug 2026 - 25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.6]Providing and laying of screed of 40 mm thick cement concrete 1:4:8 to be laid below the topping. [Through Rate] | 46 | Sqm | 92 | ₹4,232 |
| 2 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 46 | Sqm | 113 | ₹5,198 |
| 3 | [14.71]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km . [Through Rate] | 472.5 | cum | 115 | ₹54,337.5 |
| 4 | [17.22.1]Water Bound Macadam Gr I 1. Water Bound Macadam Grading I (without screenings for low volume roads (undesignated)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | 157.5 | cum | 1,038 | ₹1,63,485 |
| 5 | [17.44]Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing, as per clause 601 of MORT&H specifications [Through Rate] | 105 | cum | 2,057 | ₹2,15,985 |
| 6 | [17.45]Cement Concrete Pavement Construction of un-reinforced M-40 grade concrete pavement with dowel jointed, over a prepared sub base with 43 grade OPC cement concrete coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a fully computerised batching and mixing plant as per approved mix design, transported to site in transit mixer with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing, complete as per clause 602 of MORT&H specifications. [Through Rate] | 241.5 | cum | 5,270 | ₹12,72,705 |
| 7 | [21.53]Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of 1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar [Through Rate] | 350 | Metre | 160 | ₹56,000 |
| 8 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] | 472.5 | cum | 83 | ₹39,217.5 |
| 9 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | 13.8 | cum | 4,128 | ₹56,966.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_621058.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].