Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC | ₹17.0 L | L1 | Accepted-AOC As per tender committee |
| 2 | Rejected-Technical | - | - | Rejected-Technical As per tender committee |
Tender Value
₹17.0 L
EMD Value
₹17,000
Closing Date
21 Mar 2026, 5:00 pmClosed
EXECUTIVE OFFICER,NAC,KESINGA
NAC,KEISNGA,DIST-KALAHANDI
CONSTRUCTION OF SHOPPING COMPLEX NEAR TAHASIL OFFICE IN WARD NO 10
2026_ORULB_127071_5
KSNG-NAC-06/2025-26
Open Tender
Civil Works - Buildings
Percentage
60 days
KESINGA NAC
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹17,000
Yes
5 Aug 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
21 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work Excavation in hard soil or Gravely soil within 5km lead and 1.5mt initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30M in depth and as per direction of Engineer - In - Charge etc. complete | 90.95 | Cum | 294.2 | ₹26,757.49 |
| 2 | Filling in foundation and plinth with sand watered and rammed including cost, conveyance and royalty etc complete in all respect. | 231.88 | Cum | 541.1 | ₹1,25,470.27 |
| 3 | Cement concrete 1:3:6 with 4cm size Crusher Broken granite metal including cost, conveyance and royalty etc. Complete | 37.68 | Cum | 5,815.1 | ₹2,19,112.97 |
| 4 | Fly Ash Brick 25 x 12 x 8 cm in C.M. 1:6 for foundation and plinth work including cost, conveyance & royalty etc. Complete | 89.04 | Cum | 5,402.9 | ₹4,81,074.22 |
| 5 | Fly Ash Brick with 25 x 12 x 8 cm in C.M. 1:6 in Superstructure including cost, conveyance & royalty etc. Cocmplete | 49.2 | Cum | 5,441.3 | ₹2,67,711.96 |
| 6 | R.C.C. work of M-20 grade with 20mm and down grade black hard granite(crusherbroken) stone chips including cost,carraiage,royalty,taxes etc. complete.COLUMN BASE | 18.66 | Cum | 5,847.6 | ₹1,09,116.22 |
| 6.1 | PLINTH BAND | 8.36 | Cum | 5,847.6 | ₹48,885.94 |
| 6.2 | COLUMN | 3.67 | Cum | 5,847.6 | ₹21,460.69 |
| 7 | Providing and fixing Centering and shuttering including strutting, propping etc. and removal of form the site after completion of respective work as the direction of engineer in charge.COLUMN BASE | 86.22 | Cum | 248.7 | ₹21,442.91 |
| 7.1 | PLINTH BAND | 165.56 | Cum | 248.7 | ₹41,174.77 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.18 MB
DTCN.pdf
Tender Documents • 0.20 MB
BOQ_584603.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .