Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹1.9 L (1.72%)Admitted-Finance | ₹1.1 Cr+₹1.9 L (1.72%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SIVAGNANAM L1 | A.AKBAR L2 |
|---|---|---|---|---|---|
| 1.00PART I: Rejuvenation of Padavattamman Kulam in Melaiyur Panchayat Estimate Amount : Rs.21.36 Lakh | |||||
| 2.00 | Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification | 2,743.2 | sqm | - | - |
| 3.00 | Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation | 3,734.7 | cum | - | - |
| 4.00 | Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation | 296.45 | cum | - | - |
| 5.00 | Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy for foundation | 104.76 | cum | - | - |
| 6.00 | Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa | 29.28 | cum | - | - |
| 7.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 37.6 | cum | - | - |
| 8.00 | Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc. | 730 | sqm | - | - |
| 9.00 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications | 48.84 | cum | - | - |
| 10.00 | Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications | 120.96 | cum | - | - |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
13 Feb 2020, 3:00 pmClosed
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Rejuvenation of 4 Nos. of Ponds in Thirupporur Block of former Kancheepuram District and present Chengalpattu District under SFC - PU and DP Grant 2019-20 having Pkg No.19/2019-20
2020_RDTN_157431_1
DIPR/646/Tenders/2020, dt.30.01.2020
Open Tender
Civil Works
Item Rate
180 days
Thirupporur Block
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.1 L
O/o The Project Director DRDA Kancheepuram
21 Feb 2020
8 Feb 2020
13 Feb 2020
8 Feb 2020
13 Feb 2020
8 Feb 2020
10 Feb 2020
Amount
PART I: Rejuvenation of Padavattamman Kulam in Melaiyur Panchayat Estimate Amount : Rs.21.36 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy for foundation
Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Gravel backing for revetments including cost and conveyance and all labour charges etc complete
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
Cement Concrete 1:2:4 mix using 20mm ISS HBG including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Pointing the RR masonry with CM 1:3 mix - 20mm thick including cost and conveyance etc., complete.,
Painting the cement plastered wall furface with two coats of ready mixed cement paint of Ist quality including cleaning preparing te surface etc., complete
PART II: Rejuvenation of Kattur eswaran koil kulam in Venbedu Panchayat Estimate Amount : Rs.29.50 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Gravel backing for revetments including cost and conveyance and all labour charges etc complete
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Pointing the RR masonry with CM 1:3 mix - 20mm thick including cost and conveyance etc., complete.,
Painting the cement plastered wall furface with two coats of ready mixed cement paint of Ist quality including cleaning preparing te surface etc., complete
PART III : Rejuvenation of Chinna Kattur Kulam in Venbedu Panchayat Estimate Amount : Rs.37.63 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Gravel backing for revetments including cost and conveyance and all labour charges etc complete
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Pointing the RR masonry with CM 1:3 mix - 20mm thick including cost and conveyance etc., complete.,
Painting the cement plastered wall furface with two coats of ready mixed cement paint of Ist quality including cleaning preparing te surface etc., complete
PART IV : Rejuvenation of Periya Kulam in Kayar Panchayat Estimate Amount : Rs.23.39 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Gravel backing for revetments including cost and conveyance and all labour charges etc complete
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Pointing the RR masonry with CM 1:3 mix - 20mm thick including cost and conveyance etc., complete.,
Painting the cement plastered wall furface with two coats of ready mixed cement paint of Ist quality including cleaning preparing te surface etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A.AKBAR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_188758.xls
BOQ • 0.30 MB
Price.pdf
Additional Documents • 0.14 MB
Technical_.pdf
Tender Documents • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .