Loading…
Loading…
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
21 Oct 2026, 6:00 pm
Garrison Engineer (East) JRC
Garrison Engineer (East) JRC
Certain maint to lekage/ seepage a roof treatment, sunken floor and certain B/R work at OTM and Md Accn at Haripur Range, Parjiyan Kalan, Vir Sangwal and Jalandhar Cantt under AGE B/R-I of GE (East) Jalandhar Cantt
2026_MES_791771_1
GE/JULL/ET-30/2026-27
Open Tender
Civil Works
Item Rate
273 days
Garrison Engineer (East) JRC
as per tender documents
9 documents required · 9 mandatory
₹500
Garrison Engineer (East) JRC
₹80,000
Yes
30 Sept 2026
30 Sept 2026
28 Oct 2026
30 Sept 2026
21 Oct 2026
14 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete in ground floor and paving/as in sunken portion (below or above ground level), complete all as specified and as directed. | 25 | Cum | - | - |
| 2 | M&L for cement concrete 1:5:10 type E - 2 (using 40 mm graded brick aggregate) as in sunken flooring, complete all as specified and as directed. | 25 | Cum | - | - |
| 3 | Water proofing treatment to sunken floors of kitchen, toilets, laboratories, bath and WCs etc shall be as under:-
(i) The top surface of the sunken RCC slab shall be laid with cross slope as per direction of Engr in charge/GE towards the spouts. The min thickness of the RCC slab shall be as specified in drg.
(ii) 25mm thick PCC 1:1.5:3 fillets at corners with 12.5mm graded aggregate shall be provided.
(iii) Plastering in CM (1:3) 15mm thick with WPC on walls as well as on sunken floor finished even and smooth using extra cement.
(iv) GI Pipe 40mm dia medium grade be inserted at the end of lateral slope projecting at least 45cm beyond the outer most projected part of the building below the drain pipe upto two storey construction and 25cm beyond two storey construction.
(v) After doing the plaster, testing be carried out by ponding (Min 3 to 5 days) the sunken portion before further treatment to the sunken slabs. Any leakage/seepage observed shall be rectified before carrying out water proofing treatment.
(vi) Two component Acrylic modied Cementitious coating:- | 40 | Sqm | - | - |
| 3.01 | (aa) The surfaces to be applied shall be completely dry and free from containments such as dirt, dust, oil, surface treatments and old coatings. Concrete substrates must be mechanically prepared using abrasive blast cleaning or milling to remove cement laitance, existing coating and achieve a gripping profile that is clean, dry and free from laitance and dry other form of surface contamination. The installation instructions in manufacture's published literature should be strictly complied with, including but not limited to the following:-
(bb) Chipping out any visible cracks in "V-Groove" pattern as applicable. Special attention on this part. Cleaning of cracks & then filling those cracks with SIKA latex SBR 100 putty/Dr Fixit 302 SBR latex/ Perma latex SBR/FOSROC Nitabond SBR latex/Asian paint latex as required. Final cleaning of surface with power grinder, wire brush, hair brush & vacuum pressure if required.
(cc) Dampen all surfaces immediately ahed of application of Acrylic modified Cementitious coating of sika Top Seal-107/Brush Bond FOSROC/Dr Fixit/STP/CICO.
(dd) Whilst the surface is still damp from saturation (S.S.D), apply one coat of Acrylic modified cementitious coating of SIKA Top Seal-107 /Brush Bond FOSROC/Dr Fixit/STP/CICO of viscosity as per manufacturer's instructions.
(ee) Apply glass fabric sheet of SIKA Fab 1/FOSROC/Dr Fixit/STP whilst the first coat is wet.
(ff) Once touch dry, apply second coat of Acrylic modified cementitious coating of SIKA Top Seal -107 /Brush Bond FOSROC/Dr Fixit/STP/CICO of viscosity as per manufacturer's instructions on the entire area.
(gg) Second coat shall be applied after 6-8 Hrs of application of previous coat and in the direction right angle to the previous coat. | - | - | - | - |
| 3.02 | (hh) The waterproofing coating should be taken to a height minimum 300mm above the finished floor level on the vertical surfaces.
(jj) It is essential to cure Acrylic modified cementitious coating immediately after application (minimum 6-8 hrs drying) for a minimum of 3 to 5 days to ensure full cement hydration and to minimize cracking.
(kk) A protection plaster 12-15mm thick) in CM 1:3 admixed with appropriate integral water proofing compound has to be applied on the walls. Admixture: SIKA Plastocrete Plus/FOSROC/DR Fixit/STP/CICO conforming to IS 2645.
Providing and applying a protection screed of 50mm thick 1:4, cement sand mortar admixed with SIKA Plastocrete over the applied water proofing coating on horizontal surfaces. Admixture: SIKA Plastocrete Plus/FOSROC/DR Fixit/STP/CICO conforming to IS 2645.
(ll) All the corners and joints should be pretreated with an elastic waterproofing sealing tape with a woven bonding mesh on each surface and an elastic expansions zone in the centre of Make SIKA Seal Tape/FOSROC/Dr Fixit/STP.
(mm) The membrane has to be protected in accordance with the manufacturer's recommendations until placement of concrete. The membrane to be inspected for damage just prior to concrete placement and make repairs in accordance with manufacturer's recommendations.
(nn) Waterproofing treatment has to be carried out through applicators authorised by the respective manufacturer's and approved by GE.
(vii) All the joints of pipes and traps within the sunken portion shall be sealed properly by epoxy sealent. | - | - | - | - |
| 3.03 | (viii) All CI traps in sunken slab to be enclosed with PCC 1:1.5:3 (Min 15cm) all around.
Note:- Plan area (wall to wall/ wall to beam/ beam to beam shall be measured and paid (0.45 to 0.60 mtr). No separate measurement for vertical surface shall be accounted and quoted rate shall be deemed to include for the same. | - | - | - | - |
| 4 | Dismantling of brick tiles single layer as in roof covering complete all as directed. | 1,000 | Sqm | - | - |
| 5Demolition of mud in roofs any thickness all as directed by Engr-in-Charge. | |||||
| 6Wire brushing and cleaning top surface of cement concrete, including flashing and junction of parapets etc, complete all as specified and as directed. | |||||
| 7M&L for Brushing neat cement slurry with 3 kg of cement per sqm, complete all as specified and as directed. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_887818.xls
BOQ • 0.33 MB
Tender30.pdf
Tender Documents • 1.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .