Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 13 138 SHAKTINAGAR SHUKLAGANJ UNNAO | UNNAO | UTTAR PRADESH | 209801 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.1 L
EMD Value
₹1,050
Closing Date
6 Oct 2023, 2:00 pmClosed
SE EDC II FATEHABAD
EDC II FATEAHBAD
line work
2023_DVVNL_844940_1
Tender no 54/2023-24
Open Tender
Miscellaneous Works
Lump-sum
180 days
fatehabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
DVVNL
₹1,050
29 Apr 2025
1 Oct 2023
6 Oct 2023
1 Oct 2023
6 Oct 2023
1 Oct 2023
Amount
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 8.5/9/11 Mtr. long PCC Poles.
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) 11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps and other required line material, if any.
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.) a) 8.5 Mtr/ 9 Mtr/11. Long PCC
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)D) 11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps and other required line material, if any.
Erection of single new pole including fitting all accessories for proper ground clearance.
Replacement of damaged poles HT/LT Lines by digging of pits and dismantling of all 11KVKV accessories from the existing / damaged pole and erection of single new pole including fitting of all accessories.
Erection of stays its tightning, binding, nozelling etc. of stay wire with stay and stay clamp of pole as per requirement of work at site.
Re- sagging and stringing of existing conductor in 11KV/ /LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor.
laying sagging, binding and jumpering etc of new and old used. following conductor as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work A) ACSR Weasel Conductor.
Replacement of damaged following 11 KV accessories along with Nut & Bolt and all other related accesoories :- A) 11 KV X-Arm
B) 11 KV Disc Insulator with fitting
Replacement of damaged following 33 KV accessories along with Nut & Bolt and all other related accesoories :- A) 33 KV X-Arm
B) 33 KV Disc Insulator with fitting
Straightening of tilted single 8.5 Mtr. PCC Polesof existing lines by opening of line conductor, digging earth pit, straightning of pole, filling the earth pit after straightning then relaying the line conductor, as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Straightening of tilted single 9/11 Mtr. ST Poles/R.S. Joyst in the existing lines by opening of line conductor, digging earth pit, straightning of pole, filling the earth pit after straightning then relaying the line conductor, as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
Earthing of pole
concreating of Pole
MAA DURGA CONSTRUCTION
SAMADHIYA ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .