Tender Value
Refer Docs
EMD Value
₹63,640
Closing Date
25 Aug 2026, 2:00 pmDue tomorrow
AGNINDER BAKSHI
O/o Executive Engineer, SIDCO Construction Division, Ghatti -Kathua
Up-gradation /Restoration of Sewerage Pipe network at Industrial Estate Ghatti-Kathua
2026_SIDCO_321425_1
E-Nit No. 05 of 2026-27 Dated13-08-2026
Open Tender
Civil Works
Percentage
IE GHATTI-KATHUA
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
Executive Engineer, SIDCO Const Division Ghatti
₹63,640
18 Aug 2026
18 Aug 2026
27 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil.
E/W for 300mm dia pipe on main spine road nallah to L6 road(depth =4.80 mtr)
Qty=1x90.00x2.5+0.80/2x4.80= 12.80cum(a)
E/w for 300mm dia pipe on main spine road axiom opposite to L 15 Road (depth=1.80 mtr)
qty= 200x1.80+0.80/2x1.80 =468 cum….(b)
E/W for manholes A(depth =5 mtr)
Qty=3x2.5x2.5x5.0 =93.75…[c)
E/W for manholes B (depth =1.80 mtr)
qty =6x1.80x1.80x1.80 =34.99 cum …(d)
E/W for inlet chambers
qty=15x1.05x1.05x0.85 = 14.05cum…….(e)
Total qty. =a+b+c+d+e = 1323.59cum | 1,323.59 | CUM | 256.85 | ₹3,39,964.09 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil :
Qty=1x90x2.50+0.80/2x3.30=490.05cum…(a)
qty=200x1.80+0.80/2x0.30= 78.00cum….(b)
manholes
A qty=3x2.5x2.5x3.50 =65.62cum…[c)
B qty=6x1.80x1.80x0.30 =5.83cum….(d)
Total qty=a+b+c+d = 639.50 Cum | 639.5 | CUM | 89.75 | ₹57,395.13 |
| 3 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Bituminous roads
QTY for 300 mm dia Pipes on main road
Qty =1x80x2.5 = 200 Sqm | 200 | SQM | 305.95 | ₹61,190 |
| 4 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge.
1:3:6 or richer mix (i/c equivalent design mix) Qty =12cum | 12 | CUM | 1,725.2 | ₹20,702.4 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering 1:4:8 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) All work upto plinth level with.
PCC for 300mm dia pipe line.
bed=1x290.00x0.60x0.10 = 17.40cum
PCC for manhole A
qty =3x2.0x2.0x0.10 =1.20 cum
PCC for manhole B
qty=6x1.60x1.60x0.10 =1.53cum
PCC for inlet chambers
qty=15x1.05x1.05x0.10 =1.65cum
Total qty =21.78 Cum | 21.78 | CUM | 4,826.5 | ₹1,05,121.17 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering 1:4:8 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) All work upto plinth level with.
PCC for 300mm dia pipe line.
bed=1x290.00x0.60x0.10 = 17.40cum
PCC for manhole A
qty =3x2.0x2.0x0.10 =1.20 cum
PCC for manhole B
qty=6x1.60x1.60x0.10 =1.53cum
PCC for inlet chambers
qty=15x1.05x1.05x0.10 =1.65cum
Total qty =21.78 Cum | 17.4 | CUM | 5,733.6 | ₹99,764.64 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)
CC for manholes
qty = 1x6x1.60x1.60x0.10 =1.53cum
qty = 1x3x2.0x2.0x0.15 =1.8 cum
CC for 300 mm dia pipe line
qty=1x290x0.55x0.60= 95.7 cum
d/d=300 mm pipe dia
qty =290x3.14x(0.175)²=27.88cum
total =67.62cum
Total qty = 70.95 | 70.95 | CUM | 7,275.25 | ₹5,16,178.99 |
| 8 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.
300mm dia. R.C.C. pipe L=290 RM | 290 | MTR | 837.55 | ₹2,42,889.5 |
| 9 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement, 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Manhole (B) size (.90x.90)
Raft=1x1.30x1.30x0.20= 0.338
L.wall=1x2x1.30x0.20x1.80=0.936
S.wall=1x2x0.90x0.20x1.80=0.648
Casting & PlacingManhole cover
Qty=1x3x1.30x0.45x0.15 =0.263
Qty for single manhole =2.18 cum
total no. of manhole = 6
total qty=1x6x2.18 =13.08cum…..(A)
Manhole (A) size (1.20x1.20)
Raft=1x1.80x1.80x0.25= 0.81
L.wall=1x2x1.80x0.30x4.60=4.97
S.wall=1x2x1.20X1.20X.30x4.60=3.97
Casting & Placing Manhole cover
Qty=1x3x1.80x0.60x0.25 =0.81
Qty for single manhole =10.55 cum
Total no. of manhole = 5
Total qty=1x3x10.55 =31.68cum…..(B)
RCC for inlet chambers
qty=15x(4x0.65x0.20x0.70)=5.46cum…(C)
casting RCC cover (slab) for inlet chamber
Qty =15x0.75x0.75x0.125 =1.05cum…….(D)
Total qty a+b+c+d 51.27=cum | 51.27 | CUM | 9,395.7 | ₹4,81,717.54 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete
(B)PCC=2x(1.60+1.60)x0.10=0.512sqm
Casting for Manhole cover shuttering
3x{(1.30+0.45)x2}x0.15=1.575
Qty for single manhole = 0.96+1.575=2.53sqm
Total qty=1x6x2.53 =15.18sqm….a
(A)PCC=2x(2.0+2.0)x0.10=0.80sqm
Casting for Manhole cover shuttering
3x{(1.80+0.60)x2}x0.25=3.60sqm
Qty for single manhole =0.80+3.60=4.40sqm
qty=1x3x4.40=13.20sqm…..b
FOR pipe line
PCC2x290x.10=58sqm……c qty=2x290x.60=348sqm…..d
Total qty =a+b+c+d = 434.38cum | 434.38 | SQM | 286.35 | ₹1,24,384.71 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1073345.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].