| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | ₹9.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹9.3 LRejected-Finance | ₹9.3 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | JAI LAXMI CONTRACTOR L2 | M/S ARYA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P leads and lift etc complete. | 224.56 | CUM | 64 ₹14,371.58 | 60 ₹13,473.36 |
| 2.00 | Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 24.19 | CUM | 5,150 ₹1.2 L | 5,100 ₹1.2 L |
| 3.00 | Providing first class M-100 Brick Work 1:4 Cm mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | 2.46 | CUM | 5,200 ₹12,802.40 | 5,000 ₹12,310 |
| 4.00 | Providing and Laying Lean Concrete CC 1:4:6 in foundation using Stone Blast including cost of all material, labour and T&P etc. complete required for proper complition of work. | 29.29 | CUM | 4,850 ₹1.4 L | 4,750 ₹1.4 L |
| 5.00 | Providing and Laying M-15 CC 1:2:4 in foundation using Stone Blast including cost of all material, labour and T&P etc. complete required for proper complition of work. | 70.47 | CUM | 5,640 ₹4.0 L | 5,400 ₹3.8 L |
| 6.00 | Providing and Laying M-20 CC 1:1.5:3 in foundation using Stone Blast including cost of all material, labour and T&P etc. complete required for proper complition of work. | 18.13 | CUM | 6,600 ₹1.2 L | 6,500 ₹1.2 L |
| 7.00 | Providing and Laying M-25 CC 1:1:2 in foundation using Stone Blast including cost of all material, labour and T&P etc. complete required for proper complition of work. | 0.5 | CUM | 7,100 ₹3,550 | 7,000 ₹3,500 |
| 8.00 | Providing and fixing Suttering & Centring for CC Work including cost of all material, labour and T&P etc. complete required for proper complition of work. | 229.53 | SQM | 460 ₹1.1 L | 450 ₹1.0 L |
| 9.00 | Providing and fixing of 100 mm. Dia PVC Pipe in proper position for Drainage spout including cost of all material, labour and T&P etc. complete required for proper complition of work. | 3.64 | RM | 135 ₹491.40 | 130 ₹473.20 |
| 10.00 | Providing and Laying 12 mm Thick Cement Plaster in 1:4 on surface including cost of all material, labour and T&P etc. complete required for proper complition of work. | 3.6 | SQM | 138 ₹497.49 | 130 ₹468.65 |
Tender Value
Refer Docs
EMD Value
₹19,000
Closing Date
10 Feb 2026, 5:00 pmClosed
EE M G C C Div 8 Bulandshahr
M G C C Div 8 Bulandshahr
Lot 1 Construction of Fall at Km. 0.400 of Dhatra Shekh Minor
2026_UPIDC_1109495_2
04/EE/2025-26
Open Tender
Civil Works - Canal
60 days
SAMBHAL
2 documents required · 2 mandatory
₹856
₹19,000
Yes
15 Apr 2026
5 Feb 2026
11 Feb 2026
5 Feb 2026
10 Feb 2026
5 Feb 2026
5 Feb 2026 - 10 Feb 2026
Earth work in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P leads and lift etc complete.
Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing first class M-100 Brick Work 1:4 Cm mortar including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and Laying Lean Concrete CC 1:4:6 in foundation using Stone Blast including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and Laying M-15 CC 1:2:4 in foundation using Stone Blast including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and Laying M-20 CC 1:1.5:3 in foundation using Stone Blast including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and Laying M-25 CC 1:1:2 in foundation using Stone Blast including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and fixing Suttering & Centring for CC Work including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and fixing of 100 mm. Dia PVC Pipe in proper position for Drainage spout including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and Laying 12 mm Thick Cement Plaster in 1:4 on surface including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing Dry Brick Pitching including cost of all material, labour and T&P etc. complete required for proper complition of work.
Earth work in Filling in embankment in ordinary soil excavation to be in the form of regular pits and Earth Work in embankment to be in 20 mm layers including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto distance including 1 Km cost of all Labour T&P etc complete as directed by Engineer-in-charge
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
TD14EE2526.pdf
Tender Documents • 2.18 MB
BOQ_2057805.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid