| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.3 LAccepted-AOC IDUVAI TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | 1 | Accepted-AOC ok | |
| 2 | 2₹12.4 L+₹9,006.70 (0.73%)Rejected-AOC | 2 | Rejected-AOC ok |
| Sl No | Description | Qty | Unit | RAJARAM L2 | Ramachandran L1 |
|---|---|---|---|---|---|
| 1.00 | Supplying and erecting steel centering for the sides and soffits of RCC slab or plane surfaces excluding strutting and the rate including cost and conveyance of all materials and labour charges etc. Complete complying with standard specification. Above | 36 | m2 | 47,880 ₹47,880 | 47,772 ₹47,772 Lowest |
| 2.00 | Supplying, fabricating and placing in position of steel rods (M.S or RTS) including cost of binding wire and the rate including cost and conveyance of all materials and labour charges etc. complete complying with standard specification. | 450 | Kg | 63,000 ₹63,000 | 62,100 ₹62,100 Lowest |
| 3.00 | Reinforced cement concrete 1:1.5:3 mix using 20 mm size I.S.S. HBG metal mixing, laying and the rate including cost and conveyance of al materials and labour charges etc. Complete complying with standard specification. | 4.5 | m3 | 51,750 ₹51,750 | 51,732 ₹51,732 Lowest |
| 4.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications | 10.5 | m3 | 86,047.5 ₹86,047.5 | 86,037 ₹86,037 Lowest |
| 5.00 | Supplying and fixing of M.S.grill of approved design for doors. Windows and ventilators using necessary mild steel flats for inner and outermembers which should be fixed to window frames inclusive of priming coat of best approved quality red oxide primer etc., complete complying with standard specifications. | 760 | KG | 1,06,400 ₹1,06,400 | 1,04,880 ₹1,04,880 Lowest |
| 6.00 | Providing UPVC (Un-Plasticized Polyvinyl Chloride)Door: Providing and fixing casement doors fabricatedfrom un-plasticized polyvinyl chloride (uPVC) sections.Profiles: The profiles should be hree chamber systemwhich provides high insulation properties with outerframe 60mm x 55mm with an outer wall thickness of2.4mm. The window unit should be designed with allcorner joints mitred and fusion welded. Windowsshould be steel reinforced with 25 x 24 x 25mm steelreinforcement with a thickness of 1mm to havedimensional stability. The sash should be of 60 x 02mm. The mullion should be of 60 x 74mm. Theprofiles should have co-extruded seals.Hardware: All the hardware like friction stays, handlesshould be screwed with self tapping screws. Thehandles, locks should be designed so that they cannotbe released from outside.Glazing: The window system should be glazed with5mm plain float glass / 6mm bison lamInstallation: The profiles should be cut to length andwelded 45 degrees. The window should be designedsuch that the water drainage does not pass throughthe reinforcement chamber. The window systemshould be fixed directly to the lastered brick wallusing self expanding nylon plug and driving mselectroplated screws into plug. | 2.6 | m2 | 21,619 ₹21,619 | 21,613.8 ₹21,613.8 Lowest |
| 7.00 | UPVC Window Specification: Supplying and fixing UPVC (Un-Plasticized PolyvinylChloride)Windows of casement type (open) from theprofile the size of outer frame 60mm x 58mm andshutter profile are reinforcement with GI/1mm 125GSMand 100% corrosion free, the profiles are multichambered sections with wall thick of 2mm. The EPDMrubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided withEspag multi power point locks and also it operates ashandle. The corners and joints should be welded andcleaned. Radiations free pin headed plain or browncolour glass 4mm thick should be provided to theshutter and it should not allow leakage of water evenat most ranging storms and should have key lockableaction, security protective hinges, strong lockingsystems and as per size for arresting noise and energyloss. The connecting mechanism between sash andouter frame that enables opening of the window. Thewindow should be fixed to the wall with 100% packingwith screws and silicon packing all round the frames.The window should be got approved from the Executive Engineer before use on work | 38 | m2 | 2,84,430 ₹2,84,430 | 2,84,316 ₹2,84,316 Lowest |
| 8.00 | Plastering in cm 1:5 to 12mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 161 | m2 | 59,570 ₹59,570 | 59,087 ₹59,087 Lowest |
| 9.00 | White washing two coats using best shell lime, kanji or prickly pear juice water and the rate including cost and conveyance of all material and labour charges etc., complete complying with standard specifications. | 161 | m2 | 8,855 ₹8,855 | 8,211 ₹8,211 Lowest |
| 10.00 | Painting the new walls two coats over one coat of priming with best Emulsion paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications. | 161 | m2 | 49,910 ₹49,910 | 49,266 ₹49,266 Lowest |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
3 Apr 2025, 3:00 pmClosed
EXECUTIVE OFFICER
KETTI TOWN PANCHAYAT
CONSTRUCTION OF FIRST FLOOR TO EXISTING COMMUNITY HALL IN SAKKALATTY VILLAGE IN KETTI TOWN PANCHAYAT.
2025_DTP_536305_1
55/2024
Open Tender
Civil Works - Buildings
Works
60 days
KETTI TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
Yes
12 Sept 2025
28 Mar 2025
3 Apr 2025
28 Mar 2025
3 Apr 2025
28 Mar 2025
28 Mar 2025 - 3 Apr 2025
Supplying and erecting steel centering for the sides and soffits of RCC slab or plane surfaces excluding strutting and the rate including cost and conveyance of all materials and labour charges etc. Complete complying with standard specification. Above
Supplying, fabricating and placing in position of steel rods (M.S or RTS) including cost of binding wire and the rate including cost and conveyance of all materials and labour charges etc. complete complying with standard specification.
Reinforced cement concrete 1:1.5:3 mix using 20 mm size I.S.S. HBG metal mixing, laying and the rate including cost and conveyance of al materials and labour charges etc. Complete complying with standard specification.
Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications
Supplying and fixing of M.S.grill of approved design for doors. Windows and ventilators using necessary mild steel flats for inner and outermembers which should be fixed to window frames inclusive of priming coat of best approved quality red oxide primer etc., complete complying with standard specifications.
UPVC Window Specification: Supplying and fixing UPVC (Un-Plasticized PolyvinylChloride)Windows of casement type (open) from theprofile the size of outer frame 60mm x 58mm andshutter profile are reinforcement with GI/1mm 125GSMand 100% corrosion free, the profiles are multichambered sections with wall thick of 2mm. The EPDMrubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided withEspag multi power point locks and also it operates ashandle. The corners and joints should be welded andcleaned. Radiations free pin headed plain or browncolour glass 4mm thick should be provided to theshutter and it should not allow leakage of water evenat most ranging storms and should have key lockableaction, security protective hinges, strong lockingsystems and as per size for arresting noise and energyloss. The connecting mechanism between sash andouter frame that enables opening of the window. Thewindow should be fixed to the wall with 100% packingwith screws and silicon packing all round the frames.The window should be got approved from the Executive Engineer before use on work
Plastering in cm 1:5 to 12mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
White washing two coats using best shell lime, kanji or prickly pear juice water and the rate including cost and conveyance of all material and labour charges etc., complete complying with standard specifications.
Painting the new walls two coats over one coat of priming with best Emulsion paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications.
Supplying and fixing of mild steel hallow sections of square and rectangular pipes and the rate including the cost of materials, trasporting charges, labour charges for welding and fixing charges and all other incidential charges to work site etc., complete complying with standard specification.
Supply, and fixing of Galvalum sheet ( pre painted ) 6mm thick including 15 cm lapping necessary 'J' bolt and nut ,bitumen washer and screws if wooden baterns including cost and conveyance of all materials and labour charges etc complete complying with standard specifications
RAJARAM (BID ID -1283825)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_638225.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .