| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 CrAdmitted-Finance | -36.86% | ₹3.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.2 CrAdmitted-Finance 2726 203 ONKAR NAGAR TRI NAGAR NORTH WEST DELHI NORTH WEST DELHI DELHI 110035 | NORTH WEST DELHI | DELHI | 110035 | -35.67% | ₹3.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.3 CrAdmitted-Finance | -34.26% | ₹3.3 Cr | L3 | Admitted-Finance |
| 4 | L4₹3.4 CrAdmitted-Finance B 5 TULSI DAS KI BAGICHI JANTA COLONY JAIPUR RAJASTHAN 302004 | JAIPUR | RAJASTHAN | 302004 | -31.88% | ₹3.4 Cr | L4 | Admitted-Finance |
| 5 | L5₹3.4 CrAdmitted-Finance | -31.52% | ₹3.4 Cr | L5 | Admitted-Finance |
Tender Value
₹5.0 Cr
EMD Value
₹10.0 L
Closing Date
7 May 2026, 6:00 pmClosed
Unit Head
RIICO AJMER
Construction of Cement Concrete road at industrial area Saradhana, amounting to Rs. 501.03 lakh
2026_RIICO_552502_1
2026/Ajmer/39015/1134
Open Tender
Civil Works
180 days
Saradhana
please refer bid documents
5 documents required · 5 mandatory
₹5,900
Through SSO ID of Contractor
₹10.0 L
Yes
Ajmer
26 May 2026
18 Apr 2026
8 May 2026
18 Apr 2026
7 May 2026
18 Apr 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses & Granular Courses | - | CUM | - | - | 1 |
| 2 | CARRIAGE OF MATERIALS
Earth, sand, gravel, u/s kankar, lime, flyash, morrum, manure or sludge. upto 4 km lead. | - | CUM | - | - | 2 |
| 3 | Compaction of original ground with maximum of six passes of 8-10 tonnes power roller including filling depression occurring during rolling [MoRTH Specification : Clause 305.3.4] | - | 100 SQM | - | - | 17 |
| 4 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | - | CUM | - | - | 18 |
| 5 | Construction of un-reinforced , plain cement concrete pavement M-40 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Slip Form Paver (laying and fixing of 125 micron thick polythene film) and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 should have minimum flexural strengthen of 4.5 MPa, including vaccum dewatering process with all required equipments. (Dowel Bars will be paid seprately). | - | CUM | - | - | 19 |
| 6 | Granular Sub-Base with Close Graded Material (Table:- 400-1)
Plant Mix Method
Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete. [MoRTH specification: Clause 401]. By mechanical means. For Grading-II Material | - | CUM | - | - | 20 |
| 7 | Providing, laying & fixing in position RCC spun or hume pipes ISI marked with proper jointing in required slope packed in the gasket of hume or spun yarn and neatly finished with rich grout of cement moratar 1:3 or having flexible rubber ring joint made with prefectly air and water tight including testing of joints as per MoRTH Specfication : Clause : 1000 & 2900, NP - 3, 300 mm dia | - | METER | - | - | 22 |
| 8 | Providing and Fixing of Dowel Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. | - | P. KG | - | - | 23 |
| 9 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. | - | SQM | - | - | 24 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BIDsaradhana.pdf
Tender Documents • 0.73 MB
BOQ_984523.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid