Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹21.0 LAWARDED | ₹21.0 L | AWARDED |
Tender Value
₹28.8 L
EMD Value
₹72,000
Closing Date
17 May 2025, 10:00 pmClosed
Directorate of Municipal Administration
Providing and Laying of Paver Blocks at wno 03 06 07 09 14 15 19 21 23 in Lingasugur town Limit
DMA/2025-26/RD/WORK_INDENT39398
DMA/2025-26/RD/WORK_INDENT39398
Open
Roads
Electronic Documents, First(One Cover)
DMA Town Municipal Council Lingasaguru
₹720
₹72,000
29 Apr 2025
29 Apr 2025
17 May 2025
Providing and Laying of Paver Blocks at wno 03 06 07 09 14 15 19 21 23 in Lingasugur town Limit
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work PWD SR 2023-24 Vol:3 P.No.17 I.No:3.1
Providing and laying 100mm thick factory made precast M -40 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions more than 10MSA upto 20MSA f...
Wet Mix Macadam (Plant Mix Method)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical ...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate for drain formworks considered 5%.PWD SR 2021-22 Vol:2 P.No....
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .