EE(C) FTR HQ BSF JALANDHAR PUNJAB
FTR HQ BSF JALANDHAR PUNJAB
Renovation and Upgradation of Toilet Blocks of ADM Block at Ftr HQ BSF Jalandhar Pb
2026_BSF_908471_1
04/NIT/FTR /BSF/JAL/26-27
Open Tender
Civil Works
Percentage
180 days
Ftr HQ BSF Punjab Jalandhar
please refer to NIT documents
12 documents required · 12 mandatory
₹0
₹31,852
8 Jun 2026
13 May 2026
28 May 2026
13 May 2026
26 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 208.32 | sqm | 71.42 | ₹14,878.21 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 3.84 | cum | 2,368.53 | ₹9,095.16 |
| 3 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead :Of area 3 sq. metres and below | 12 | Each | 139.63 | ₹1,675.56 |
| 4 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 6.48 | sqm | 259.26 | ₹1,680 |
| 5 | Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in- Charge. | 12 | Each | 130.48 | ₹1,565.76 |
| 6 | Dismantling of flushing cistern of all types (C.I./PVC/Vitreous China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead. | 12 | Each | 109.02 | ₹1,308.24 |
| 7 | Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead :100 mm dia pipe | 12 | mtr | 444.32 | ₹5,331.84 |
| 8 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 135.3 | sqm | 53.17 | ₹7,193.9 |
| 9 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 1.22 | cum | 3,455.37 | ₹4,215.55 |
| 10 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 2.82 | cum | 2,004.57 | ₹5,652.89 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.07 MB
BOQ_954857.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .