Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC | ₹3.8 Cr Quoted ₹3.9 Cr | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹4.0 Cr+₹13.4 L (3.43%)Rejected-Finance 15 281 CHHILI INT ROAD GHATIYA AZAM KHAN AGRA UTTAR PRADESH 282003 | AGRA | UTTAR PRADESH | 282003 | ₹4.0 Cr+₹13.4 L (3.43%) | L2 | Rejected-Finance Other than being lowest |
| 3 | L3₹4.1 Cr+₹20.9 L (5.38%)Rejected-Finance A 14 USHA SADAN NEAR POST OFFICE COLABA MUMBAI 05 | MUMBAI | MUMBAI | MAHARASHTRA | 400005 | ₹4.1 Cr+₹20.9 L (5.38%) | L3 | Rejected-Finance Other than being lowest |
| 4 | L4₹4.8 Cr+₹94.8 L (24.4%)Rejected-Finance GE W COLABA MUMBAI | CHANDRAPUR | MAHARASHTRA | 441205 | ₹4.8 Cr+₹94.8 L (24.4%) | L4 | Rejected-Finance Other than being lowest |
| 5 | L5₹4.9 Cr+₹99.4 L (25.5%)Rejected-Finance | ₹4.9 Cr+₹99.4 L (25.5%) | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹6.2 L
Closing Date
13 Mar 2023, 6:00 pmClosed
CWE (NW) MUMBAI
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
SPECIAL REPAIR TO DHANISTA BUILDING AT OLD NAVY NAGAR UNDER GE (NW) NOFRA COLABA MUMBAI
2023_MES_580096_1
8753/CWE (NW) Mumbai/E8
Open Tender
Civil Works
Item Rate
365 days
GE (NW) NOFRA
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,000
Yes
GE (NW) NOFRA
₹6.2 L
Yes
30 Mar 2023
9 Feb 2023
15 Mar 2023
9 Feb 2023
13 Mar 2023
3 Mar 2023
9 Feb 2023 - 2 Mar 2023
Amount
Taking down cement or cement lime plaster of any description on brick or stone walls, etc including raking out joints, hacking for key, scrubbing down with water, etc including errection of double steel scaffolding, covering with green cloth and all the safety measures/ precautions should be taken and remove the debries outside MoD land (as per directions of BMC) complete all as specified and as directed by Engineer in Charge
From G F to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for chipping, removing carefully concrete work by low impact hammer, breaker without damaging the structure & cleaning and disposal of debries out side the premises etc , including errection of double steel scaffolding, covering with green cloth and all the safety measures/ precautions should be taken and remove the debries outside MoD land (as per directions of BMC) complete all as specified and as directed by Engineer in Charge. (Hard concrete should not be removed by force).
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Demolition of reinforced cement concrete of any description and in any position (reinforcement cut as required to facilitate demolition wherever required), complete all as specified and as directed by Engineer in Charge
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for cleaning existing reinforcement with wire/rotary wire brush,making the surfaces free from loose material dirt etc, complete, applying two coats of alkaline rust converting primer FEOVERT or equivalent specification confirming to ASTM-B-117, on the rebars, including cleaning the reinforcement, wire brushing to remove loose rust spalls, with time interval of 6 hour between the coats and applying protective coating IPNET-RB complete all as specified and as directed by Engineer in Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Replacement of steel reinforcement with TMT bars of appropriate size where 20% of cross section is reduced including dismantling of rusted steel including application of rust converter FEOVERT and applying protective coating IPNET_RB complete all as specified and as directed by Engineer in Charge
From GF to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for carry out application of Bi-polar migratory corrosion inhibitor EPCO-KP-100/Protectsil CIT/Ferogard 903 on concrete surface (This inhibitor shall have migratory kind of properly which permits the material to migrate to a vertual extent of 100 mm, through pores of concrete. inhibiting the corrosion and de-passivating the electro-chemical reaction. It should have property to attack anode as well as cathode, which is purely alkaline in nature (pH-9.5), so it has no carcinogen activity with concrete complete all as specified and as directed by Engineer in Charge
From GF to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for drilling and fixing Rohibb Teflon nozzles in RCC members, including drilling holes of 12mm dia 50 to 100mm deep holes in structural members at the intervals of 300mm center to center in staggered manner or as directed by Engineer-in-charge in RCC structural element. Work shall be carried out as under :- (Cleaning of holes, clean the holes by air blower prior to fixing nozzles. (iFixing of nozzles, insert 12mm dia. Rohibb Teflon nozzles in cleaned holes. External end of nozzles to be machined to receive outlet of grouting gun. Fix it inside the holes by applying thixotropic epoxy putty to ensure complete sealing. Cure the system for min 12hrs. (Cutting of nozzles. Cut the nozzles by chisel after completion of grouting wihtout damaging structural elements.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and albour for injecting of cement slurry grout, in the ratio 1:2 (1-Cement, 2-water) including super plasticizer (Supercom 100)250 ml/50 Kgs. Mixing shall be done by mechanical mixer continuously stirring mechanically to keep cement particles in suspension. injection of approved / specified grout by means of pump at a pressure of 0.5 Kg/cm2 etc complete till the grout mix flows out from the nozzle indicating complete filing of grout in the holes drilled. (for repair to wall & slab) complete all as specified and directed by Engineer-in-Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for injecting low viscosity MONOPOL (3-5CPS) high molecular weight monomer by pressure and using mechanized injector gun with accessories till nozzles refuses to accept the grout, including, mixing of materials: Mixing of material components (part a&b) in the required quantities as per manufacturer's instruction by weigh batching Grouting maintain the pressure at exit (0.5 to 1.0 Kg/cm2) by monitoring pressure guage at exit.Grout the material through prefixed nozzles in the structural elements @ 100ml per nozzle. Repeat the process for all the nozzles complete all as specified and directed by Engineer-in-Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Matrial and labour for providing and applying structural grade EPIBOND-21-LP or equivalent specification prior to application of any type of mortar plaster confirming to ASTM-C-882-91 (Arizona Slant Shear Test) to ensure bond between old contrete and new concrete complete all as specified and as directed by Engineer in Charge
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for building up the profile of structural members by using latex additives(monobond) modified air cured mortar system (Polymer modified mortar) (1:5:15 = 1 monobond -5Cement-15 sand)- in damaged areas in 30 mm thickness avg. including leveling profiling etc complete all as specified and as directed by Engineer in Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for providing and applying jacketing around columns/ beams / any other RCC members with micro concrete (Molith-MC) M40 including all lifts, shuttering,drilling holes and fixing shear anchor as per specifiation complete. Note: Reinforcement shall be measured and paid separately. (Rates including jacketing, formwork and micro concrete) complete all as specified and as directed by Engineer in Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for rendering 20mm thick cement plaster in CM 1:4 in two layers 15mm thick base coat and 5mm thick finishing coat /final coat on brick work/concrete surfaces finished even and smooth without using extra cement by using WPC @2% by weight of cement in finishing coat complete all as specified and as directed by Engineer in Charge. (WPC shall be measured and paid seperately)
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for rendering 15mm thick cement plaster in CM 1:4 on fair faces of brick work/concrete surfaces finished even and smooth without using extra cement by using WPC @2% by weight of cement complete all as specified and as directed by Engineer in Charge. (WPC shall be meaasured and paid seperately)
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material & labour for preparation of newly plastered wall surfaces and applying two coats of water proof paint (rain coat of Dr. fixit or equivalent in STP, Fosroc, Krishna as approved by GE) over a coat ofprimer Dr. Fixit primeseal or equivalent in STP, Fosroc, Krishna as approved by GE complete all as specified and as per manufacturer's instruction and directed by Engineer-in-Charge..
From G F to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for rendering 15mm thick cement plaster in CM 1:6 on fair faces of brick work/concrete surfaces finished even and smooth without using extra cement complete all as specified and as directed by Engineer in Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and Labour for rendering 10mm thick on fair faces of ceilings in CM (1:3) & rendering is to be finishing even & smooth without using extra cement complete all as specified and as directed by Engineer in Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for waterproof cement based putty @ 1 Kg(undiluted) per sqm of average thickness 2 mm over the plastered/old painted wall after scrapping to prepare the surface even and smooth complete and sanding of the putty surface with mechanical wall sander (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 240 Grit or above to make the surface free from dust etc. by skilled labour as per following steps:- Step 1) Mix the putty powder by adding water as per manufacturer instructions and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute. Step 2) Apply the first coat the prepared mixer with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI. Step 3) Allow 6-8 hrs time to dry the putty surface.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for applying two coats of oil bound distemper over a coat of primer using fully automatic Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and as mentioned in PS and accessories for applying distemper should be able to spray in hard to reach areas and penetration of distemper on the surface complete all as specified and directed. Note : Sanding of surface to be done by mechanical sander with 1500 - 2700 rpm, with internal dust extraction system for clean environment certified by paint manufacturer. Proper masking to be carried out before primer and paint application).
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for preparation of new plastered surface of ceiling and applying three coats of white wash, complete all as specified and as directed by Engineer in Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for preparation of old plastered surface of ceiling and applying two coats of white wash, complete all as specified and as directed by Engineer in Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material & labour for complete removal of existing plastered wall surfaces, over 10cm girth, preparation of surfaces, filling cracks with approved crack filler & applying two coats of water proof paint (Rain coat of Dr. fixit or equivalent in STP, Fosroc, Krishna as approved by GE) over a coat of primer Dr. Fixit primeseal or equivalent in STP, Fosroc, Krishna as approved by GE complete all as specified and as per manufacturer's instruction and directed by Engineer-in-Charge..
From GL to 4th floor
iFrom 5th floor & above
From 9th floor to 12th floor
From 13th floor to 16 th floor
Supply and fixing mild steel framed work as in doors, gates, roof truss, rafter, purlins etc of angle or other section with gusset plates, rails, braces, etc., complete, drilled for fixing of steel sheeting or other covering. Doors, etc. to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also fastening and fixing complete, conforming to FE-410W Gde E-250 quality A, complete all as specified and as directed by Engineer in Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Supply and fix Pre-painted Galvalume Aluminium zinc coating GI based corrugated steel sheet 0.50 mm thick of any colour approved by Engr in Charge having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws complete all as specified and as directed by Engineer in Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Material and labour for uprooting of small plants/roots from walls and use chemical to permanently destroy the roots and making good to disturbed surface with brick work in CM 1:4 and plastering in CM 1:4 on both sides of wall area of surface n exc 30cm x 30 cm complete all as specified and as directed by Engineer in Charge.
From G F to 4th floor
iFrom 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16 th floor
Taking down Cast iron pipes of 100mm bore fixed on wall or floor at any floor/ any height/ any location including all fittings & including scaffolding upto 16th floor of building complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Taking down Cast iron pipes of 75mm bore fixed on wall or floor at any floor/ any height/ any location including all fittings & including scaffolding upto 16th floor of building complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 100 mm bore of sand cast CI Soil/ Waste pipe in any length with ears and jointed with neat cement paste fixed to wall & including scaffolding upto 16th floor of building complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 75 mm bore of sand cast CI Soil/ Waste pipe waste pipe in any length with ears and jointed with neat cement paste fixed to wall & including scaffolding upto 16th floor of building complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 75mm sand cast CI Branch pieces (Tee), Single (equal), ordinary or inverted (spigot or socket type) or with parallel branches with ovel access door and jointed with neat cement paste to CI pipes fixed to wall or roof at any floor/ any height/ any location including all fittings complete all as specified and as directed by Engr-in-Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 100mm sand cast CI Branch pieces (Tee), Single (equal), ordinary or inverted (spigot or socket type) or with parallel branches with ovel access door and jointed with neat cement paste to CI pipes fixed to wall & including scaffolding upto 16th floor of building complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour in repair 75mm cast iron floor trap with grating including jointing to waste pipe fixed in cement concrete type B1 (1:2:4) including complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing in repair 100mm CI ‘P’ or ‘S’ Traps jointed with neat cement paste fixed to wall or roof at any floor/ any height/ any location including all fittings complete all as specified and as directed by Engr-in-Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing as in repairs 100mm cast iron sanitary connections short connections pipe of length upto 300 mm complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing stack clamps suitable for securing 100mm dia CI pipe made out of 40mm by 3mm flat iron and 8mm dia round iron stays Including bolts and nuts and securing ends of stays fixed to wall & including scaffolding upto 16th floor of building complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing stack clamps suitable for securing 75mm dia CI pipe made out of 40mm by 3mm flat iron and 8mm dia round iron stays Including bolts and nuts and securing ends of stays fixed to wall & including scaffolding upto 16th floor of building complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing in repair cast iron cowl suitable for 75mm dia pipe & including scaffolding at roof / 16th floor of building complete all as specified and as directed by Engineer in Charge.
Supply and fixing in repair cast iron cowl suitable for 100mm dia pipe & including scaffolding at roof / 16th floor of building complete all as specified and as directed by Engineer in Charge.
Taking down rain water pipes/PVC pipes/cemented pipe (any size or pattern) including all fittings, heads, shoes, bends, swan necks, etc.,& including scaffolding, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 75mm bore PVC (SWR) pipes single socketed,in any length with rubber ring joints, fixed in wall including GI clamps of approved shape and size approved by GE & including scaffolding complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 75mm bore PVC (SWR) branch piece, single (Y) equal or unequal provided with access door fixed to pipe, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 75mm PVC (SWR) bends any radius fixed to pipe & including scaffolding at16th floor of building complete all as specified and as directed by Engineer in Charge.
Supply and fixing 160mm dia PVC (SWR) pipes single socketed,in any length with rubber ring joints, fixed in wall including GI clamps of approved shape and size approved by GE & including scaffolding upto 16th floor of building complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing as in repairs 160mm dia PVC (SWR) bends/shoes any radius fixed to pipe & including scaffolding, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 13th floor to 16th floor (at roof level)
Demolition of cement concrete in ground floors and pavings any thickness, complete all as specified and as directed by Engineer in Charge.
Demolition of existing treatment of any type and preparing the surface by cleaning the concrete surface with wire brush and a high pressure water jet and ensure that it is free of dust, oil grease, loose particles vegetation roots etc and filling crackswith polymer modified mortar using smartcare RP or Epoxy mortar including Material and labour for laying padding cement concrete on terrace 1:2:4 type B-0 (using 12.5mm graded stone aggregate) of 50mm average thickness maintaining 1:30 slope finishing with 10 mm thick cement mortar 1:3 as specified and directed by Engr-in-Charge. Material & labour for High performance hybrid polyurea elastomeric waterproofing spray applied SmartCare Hypertron Hybrid liquid membrane with an elongation of 600% and tensile strength of more than 13 N/mm2 as per ISO 527 type 5, shore A Hardness of min 85 as per ISO 868 and crack bridging ability of 3.5 mm as per ASTM C1305. The system includes final base preparation, epoxy primer application and applying SmartCare Hypertron Hybrid or approved equivalent in two coats with a consumption of 2kg/sqm etc, complete as per Manufacturer specifications and to be applied by the authorised applicator of company complete all as specified and as directed by Engineer in Charge.
Dismantling floor, hearth or wall tiling (fixed at any portion but not backing) including cement mortar bedding and removing rubbish off the premises (outside MoD land) complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour coloured non-skid ceramic tiles 7-8mm thick rectified glossy (square/rectangular) area of each tiles exceeding 0.11 sqm but not exceeding 0.18sqm in floors etc , set and jointed in neat cement slurry and pointed in white or coloured cement to match over/ incl 15mm thick screed bed (1:6), complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour coloured non-skid ceramic tiles 7-8mm thick rectified glossy (square/rectangular) area of each tiles exceeding 0.11 sqm but not exceeding 0.18 sqm in skirting etc , set and jointed in neat cement slurry and pointed in white or coloured cement to match over 15mm thick rendering in CM (1:4), complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour Glazed ceramic tiles coloured of size 350x 250x 7 mm/ 450X 350X 7mm laid on vertical surface such as dado/skirting over cement mortar backing coat, set jointed in neat cement slurry and pointed in white or coloured cement including 15mm thick backing coat in CM 1:4, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Dismantling stone slabs and tiles of any description or thickness in floors laid bedded and pointed in any mortar, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour for machine cut cudappa stone slab 20-25 mm thick laid over 15mm thick screed base in cement mortar 1:6 and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour 20mm thick Granite (of any type) work (table rubbed and polished) in steps, jambs, pillars, window-cills, cooking platforms and like in 15mm thick cement mortar (1:4) including pointing in white cement (1:2) using marble dust with admixture of pigment to match with shade of granite., and nosing /rounding to edges of stone slabs one edge,complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour for Machine cut kota stone slab flooring 20-25mm thick over 15mm thick cement screed base in CM (1:6) laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour for machine cut cudappah stone slab 50mm thick over cement screed base, laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Taking down of chowkhats or frames without taking off shutters from the frame exc 1.5 Sqm but n.exc 4.00 Sqm each, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Taking down of chowkhats or frames without taking off shutters from the frame n.exc 1.5 Sqm, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 2nd class HW plain, solid, straight chowkats and frames,wrought, framed rebated on the solid, rounded or chamfered, put together with glue pinned at joints complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 35mm thick factory made plain framed, panelled shutters (two panel), 2nd class HW rail and style, with lock rail and panel of 9 mm B.W.P commercial ply with commercial veneering on both faces. The size of rail and stile as per IS: 1003 (Part I), kiln seasoned and chemically pressure treated etc complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour 35mm thick factory made 2nd Class Hard Wood as glazed and skelton shutters open rebated and prepared to receive glass, gauze etc, edges of forming plain chamfered or rounded, fitted with cut and mitred beads for securing glass etc sizes of members of shutters with sash bars all as specified in SSR Pt-I complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing Factory made single extruded WPC (WoodPolymer Composite) solid door/ window/Ceosetory windows & other Frames/Chowkhat of size 45 x 70 mm comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/ rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 750 kg/cum, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum comp?ressive strength of 58 N/mm2, modules of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/ moisture proof and fire retardant and fixed in position with MS hold fast/lugs/SS dash fasteners of required dia andlength complete as per direction of Engineer-in-Charge. (M.S. hold fast/ lugsor SS dash fasteners shall be paid for separately)
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour Factory made single extruded WPC (Wood Polymer Composite) solid plain flush door shutter of 30mm thick comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/ rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength 50 N/mm2, modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws, complete all as specified and as directed by Engineer in Charge. (Note: butt hinges and necessary screws shall be paid separately and as per specification & drawing complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Dismantling boarding any description fixed in any position with screws complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 18/19 mm thick prelaminated partical board interior grade prelaminated one side with decorative choice lamination & other side balancing white lamination fixed with screws to timber frame work including 6 mm thick teak wood beading all around complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour Machine cut kota stone 20-25mm thick (table rubbed and polished) as in window cills/ jambs, vertical surface over cement rendering and jointed with grey cement,over and including screed bed of 15mm thick in CM 1:4,including pointing in white cement (1:2) and making nosing at right angle corner complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing powder coated (50Micron minimum thickness) aluminium frame for door, windows, ventilators etc.with one or more rebates including joining cleat for fixing etc.fixed type/ louvered window or ventilator without sash bar,aluminium including necessary joining cleats,glazing clips,rubber packing,anodised aluminium snap beading,screws, sliding rollers, Rubber gasket etc. complete all as specified and as directed by Engineer in Charge. Note:a) Glazing shall be measured seperately. b) Item shall be paid as per weight of aluminium section.c) The rate quoted shall be inclusive of neoprene beading,glazing clips,screws, etc., as required which shall not be measured for arriving the weight.d)the rate shall be inclusive of the locking arrengement including complete packing with silicon gel around contacting surfaces of aluminium work, and including matching the existing surface area.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing hold fasts and similar small articles conforming to Fe 290 Gde E 165 complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fix 4.8 mm thick plain glass n exc 0.5 sqm in each pane fixed to aluminium windows and iron frame complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 3mm thick glass sheet ordinary quality frosted on one side, n exc 0.5Sqm in each pane,fixed to Aluminium windows complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 100mm stainless steel butt hinges medium weight and fixed complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 300mm Aluminium alloy, anodised, sliding door bolt with hasp, staple (bolt type) and fixing clips of sheet, cast or extruded sections and fixing bolts and sliding bolts of extruded sections or cast-aluminium alloy and fixed complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing Aluminum anodized barrel tower bolt of extruded section 200mm long complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing Aluminum anodized barrel tower bolt of extruded section 150mm long complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing extruded aluminium alloy handle fabricated type anodized 150mm long complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 150 mm long floor door stopper of aluminium door stopper of aluminium alloy body and tongue, anodised with hard drawn steel spring complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing aluminium alloy wire cloth 0.45 mm nominal dia of wire and average width of aperture 1.40 mm and fixed to aluminium frame, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour PCC 1:2:4 B1 (20mm graded aggregate) as in bed blocks, copings, benchings, railing, bends, fixing of hold fasts etc incl necessary form work complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing as in repairs Harrison rails, mild steel, chromium plated with fixing brackets, stops, rollers etc complete all as specified and as directed by Engineer in Charge
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing aluminium grill with and including suitable aluminium anodised frame F/H section as required manufactured by M/S Decogrill as per design No DG- 104, 7.5 mm thick all as specified and as directed by Engr- in- charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour preparation of new wooden surface and apply two coats of synthetic enamel paint of any description, over 10 cm in width or girth, not otherwise described, over a coat of pink primer, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing as in repairs Vitreous China wash basin, white, flat back, size 550 x 400mm including brackets or fixing with bolts in wall and including 15mm fancy pillar tap, waste coupling, waste pipe, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and Fixing in repairs Vitreous China, semi-pedestal pattern (Anglo-Indian Type), white (excluding fixing bolts, flushing cistern and flush pipe) P trap including Health faucet (ABS Body) mild steel chromium plated suitable for 15 mm dia pipe with 1.25 metre long flexible tube and ABS wall hook including making connections and fixed in position complete in all respect complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing PVC low level flushing cistern 10 litre capacity with 32mm bore polythene flush pipe of sufficient lenght including internal fitting (valve less syphonic) etc. complete fixed as in repairs complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing sinks with drainage board made of stainless steel 1mm thick kitchen or laboratory with plugs, washers and wastes; including bedding in cement mortar to dwarf wall or including fixing cantilever brackets and connecting union to pipe overall size 915mm x 460mm bowl size 410mm x 330mm x 160mm and including CP waste coupling and flexible waste pipe of adequate length upto floor trap complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing in repairs aluminium anodised tubular towel rail 20mm dia 600mm long including necessary aluminium brackets complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing as in repairs stainless steel plate rack 1mm thick of size 900 x 580 x210 mm fixed to wall with screws complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing in repairs PVC connections 15 mm size with PTMT nuts of length 600mm complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Demolition of cement concrete filling of any description in sunken portion and removing debris out side MoD land complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Treatment of sunken floor slab compraises of the following specifications and all as specified :-
Material and labour for cleaning the sunken/lowered portion of RCC slab surface (including vertical total depth plus skirting height) of floors by wire brush, chisel out any mortar sticking to the surface and brooming completely. 40mm thick avg PCC 1:2:4 type B-0 using 12.5mm graded aggregate as in padding concrete to achieve proper slope including cutting holes in bricks or RCC wall for spout (Cost cutting holes and pipes shall be measured and paid separately)
Rendering of uneven surfaces with 6mm thick CM 1:4 mixed with integral water proofing compound @ 3% by wt of cement consumed. Fill it with water and check dampness and seepage. Where dampness/seepage is noticed, nozzles shall be fixed and grouting carried out.( WPC shall be measured & paid separately)
All junctions points of side wall where CI/GI pipes are passing through shall be sealed with epoxy putty complete all as specified and as directed by Engineer in Charge.
After drying putty, wash the slab and sides of sunken portion with water and make it clear and clean complete all as specified and as directed by Engineer in Charge.
Material and labour for applying two coats of polymer modified cementious water proof coating as per manufacturs instruction to bottom and vertical sides up to finished floor level+100mm height. The thickness of two layer shall be 1mm. When the second layer is still sticky, coarse sand spray shall be carried for the vertical and bottom surface of the sunken portion complete all as specified and as directed by Engineer in Charge. (This item shall be measured and paid separately)
Plaster the bottom and sides up to bottom of the skirting with minimum 20mm thick CM 1:4 mixed with integral water proofing compound 3% by wt of cement consumed as per manufacturer's specification including rounding of corners and junctions sloping towards spout.( WPC shall be measured & paid separately)
Note :- Test the water proofed area (ponding test) by filling water for at least 72 hours and tested for leakage seepage and to the entire satisfaction of GE. Test shall be done in presence of reps of PMG and record for each sunken slab shall be maintained. The treatment shall be carried out by authorised applicators of chemicals. Cost of testing is included in the rates quoted above.
All pipes laid in sunken portion shall be covered with 50mm thick PCC 1:3:6 all round after painting with anticorrosive paint
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour for Cutting holes in bricks or RCC walls exce half brick built in cement mortar including making good after inserting and setting spouts complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing GI pipe 50mm dia medium grade laid on sunken floor complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour for applying two coats of polymer modified cementious water proof coating as per manufacturs instruction to bottom and vertical sides up to finished floor level+100mm height. The thickness of two layer shall be 1mm. When the second layer is still sticky, coarse sand spray shall be carried for the vertical and bottom surface of the sunken portion complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour PCC 1:7:12 Type F2 (40mm graded brick coarse aggregate) as in lean concrete/filling concrete complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Demolition of brick work built in cement mortar or cement lime mortar and removal of debris out side MoD land complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour for brick work built in cement mortar 1:6 with sub class B bricks straight or curved on plan exc 6m mean radius complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour brick work sub class 'B' bricks straight or curved on plan to any radius in half brick thick walls in cement mortar 1:4 etc complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing in repairs 0.71mm thickness Plain, Aluminium sheeting, Alloy 31000 H4 in ridges, hips, valley gutter, drip and straight flashing , crumple joints and fixed to wall with screws complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply only integral water proofing compound complete all as specified and as directed by Engineer in Charge.
Dismantling wrought iron or mild steel work of any description not otherwise provided for, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Taking up or down 80mm bore steel tubing and connections, complete all as specified and as directed by Engineer in Charge.. (Work carried out at terrace).
Taking up or down 40mm bore steel tubing and connections, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Taking up or down 20mm bore steel tubing and connections, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Taking up or down 15mm bore steel tubing and connections, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 80mm bore steel water tubes, medium grade, galvanised, with all fitting and fixed complete to walls and ceilings or laid in floors, complete all as specified and as directed by Engineer in Charge.. (Work carried out at terrace).
Supply and fixing 40mm bore steel water tubes, medium grade, galvanised, with all fitting and fixed complete to walls and ceilings or laid in floors complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 20mm bore steel water tubes, medium grade, galvanised, with all fitting and fixed complete to walls and ceilings or laid in floors complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 15mm bore steel water tubes, medium grade, galvanised, with all fitting and fixed complete to walls and ceilings or laid in floors complete all as specified and as directed by Engineer in Charge.
( From Ground floor to 4th floor
(i From 5th floor to 8th floor
( From 9th floor to 12th floor
( From 13th floor to 16th floor
Material and labour for nominal mix 1:1.5:3 Type A1 (using 20mm graded stone aggregate) as in slabs supported on walls beams and columns in floors, roofs, landing, balconies, canopies, deck slabs and in shelves and the like complete all as specified and as directed by Engineer in Charge.. (work will be executed at roof of the bldg i.e 16th floor)
Mild Steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending binding spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed by Engineer in Charge.
Formwork to soffits suspended slabs, floor salbs, landing and similar work, not exc 200mm thick fair finished surfaces complete all as specified and as directed by Engineer in Charge. (work will be executed at roof of the bldg i.e 16th floor)
Formwork to edges of concrete flats, treads, breaks in floors, window cills, concrete railings, openings in concrete walls, floor and roofs n.exc 20cm wide and sides of RCC/ PCC bands in walls, horizontal or sloping and similar work exc 10cm but n exc 20cm wide complete all as specified and as directed by Engineer in Charge.
Supply and fixing 5000 ltr Rotational moulded polyethylene water storage tanks tripple layer (cylindrical vertical with closed top) hoisted and fixed in position (roof level of bldg) all as specified in SSR Part I and including float valve complete all as specified and as directed by Engineer in Charge.
Supply and fixing as in repairs 80mm bore of dia Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed complete all as specified and as directed by Engineer in Charge.. (Work to be carried out at terrace).
Supply and fixing as in repairs 40mm bore of dia Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed complete all as specified and as directed by Engineer in Charge.( Work to be carried out at terrace).
Material and labour for PCC 1:2:4 Type B2 (40mm graded stone aggregate) for filling and mass concrete complete all as specified and as directed by Engineer in Charge. ( Work to be carried out at terrace).
Material and labour for Cutting holes into or through brickwalls built in cement mortar n.exc 150 Sqcm superficial area & making good after pipes lines are laid by using PCC(1:2:4), complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fix in repair white rectangular PVC water storage tanks (Loft tank) of capacity 300Ltrs with complete fitting including fixing 03 Nos tank nipples of GI/ PPR with washer for out let and inlet and including float valve all as per manufacturers instructions including disconnecting service connections/over flow pipes and removing old tank complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing in repair PVC modular 20mm thick as in proflie including 'C' channels, aluminium U clip all around the profile suitable for 300 ltr capacity loft tank ,complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Disconnecting existing tanks of capacity exc 250 but n.exc 500 litres, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position after Cleaning and removing all scale and dirt, etc, from tanks and from mouths of circulating pipes, etc.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supplying and fixing in repairs brass float valve flat type of size 20 mm bore, high pressure with polythene float & fly nut complete, screwed for GI pipe including necessary GI fittings complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing Mild steel angle iron section (Fe 410W Gde E 250 quality A) fixed independently, without connecting plates, etc incl cutting to required length, drilling, welding etc and embedding in Brick work incl Cutting holes into or through brick walls built in cement mortar and making good in cement mortar 1:3 as required as in loft Water tank base in bathrooms/kitchens etc complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour for mild steel Framed work such as grills, gratings, etc.. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290.Gde-E-165, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour preparation of new Steel surface synthetic enamel paint of two coats in any description, over 10 cm in width or girth, not otherwise described, over a coat of Red oxide primer, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing as in repairs 15mm fancy type chromium plated Bib taps, cast copper alloy with crutch or butterfly handle, screwed down, screwed for iron pipe or for brass ferrule and fixed complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing as in repairs brass chromium plated shower rose 125mm size, including fixed to steel tube, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing in repairs stop valve /angle valve fancy type chromium plated screwed down, high presure with butterfly handle screwed both ends for pipe and fixed to pipe of 15mm dia bore complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Demolition of Wall/ ceiling boards (fibre, pulp, insulatio, etc) or insulation boards/ slabs/ blanket, any thickness, including cover fillets complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing in repairs 2mm thick Fibre glass reinforced translucent corrugated sheeting fixed with L-type or J type or cranked hook bolts as in opening at corridoors, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material & Labour for providing and fixing stainless steel (Grade 304) railing made of hollow tubes, channels, plates etc, including welding, grinding, buffing, polishing and making curvature (where ever required) and fitting the same with necessary stainless steel nuts and bolts complete, including fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc, of required size, on the top of floor or the side of waist slab with suitable arrangement complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material & Labour for 75mm thick PCC (1:3:6 ) type C-1 using 20 mm graded stone aggregate as in plinth protection laid in panels finish the top surfaces even and smooth without using extra cement complete all as specified and as directed by Engineer in Charge.
Material and labour for PCC 1:4:8 type D-2 (using 40mm graded stone aggregate) as in foundations, filling ad mass concrete, complete all as specified and as directed by Engineer in Charge.
Material and labour for cement concrete interlocking type paver block 60 mm thick M 35 Grade having glossy finish (colour and pattern approved by GE) (tested as per IS 1237-1980) laid over and including 50 mm thick dry sand cushioning and voids filled with dry and surface compact, including compaction by means of surface vibrator & removing of old broken tiles, complete all as manufacture instructions an complete all as specified and as directed by Engineer in Charge.
Supply and fixing Hard drawn steel wire fabric cut to lengths, bent to shape required and tying with and including mild steel wire (annealed) not less than 0.9mm in dia supplied and fixed in reinforcemnt as in opening at corridoors by any means as directed and weight not exc 4.00 Kg/ Sqm, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Taking down copper/aluminium point wiring (light, fan, socket or power) complete, including fixture and fittings such as switches, ceiling roses, pendants, regulators, sockets, light fitting etc. removing materials to store for keeping in safe custody or for taking credit (credit for above items should be made as per conditions separately) and making good disturbed surfaces of walls, floors, etc. complete all as specified and as directed by Engineer in Charge.
Material and labour for point wiring complete with 1.5 sqmm single core multistranded FRLS PVC insulated unsheathed copper conductors 1100 volts grade drawn through & including PVC conduits, ISI marked with accessories concealed in wall/ceiling/truss etc with metallic ISI marked terminal boxes concealed in wall including one FRLS PVC insulated & sheathed multistranded green colour copper conductor 1.5 sqmm as earth continuity conductor connected to common earth as earth dolly for :-
One light point controlled by one switch SP one way.
One ceiling fan point controlled with one 5A switch
One exhaust fan point controlled with one 5A switch
One 3 pin socket outlet 5Amps on independant board.
One 3 pin socket outlet 5Amps on same board with other switches.
One bell point controlled by one bell push 5 Amps.
one light point controlled by two 2- way switches
Material and labour for point wiring complete with 2.5 sqmm single core multistranded FRLS PVC insulated unsheathed copper conductors 1100 volts grade drawn through & including PVC conduits of size not less than 25mm width, ISI marked with accessories fixed on wall/ceiling/truss etc with metallic ISI marked terminal boxes concealed in wall including one FRLS PVC insulated & unsheathed multistranded green colour copper conductor 2.5 sqmm as earth continuity conductor connected to common earth as earth dolly complete all as specified and as directed by Engineer in Charge.
Supply and fixing Modular Switch , 6Amp, One way, 1 module, ISI marked complete all as specified and as directed by Engineer in Charge. Make : Legrand(Arteor), Havells(Coral) , Goldmedal (Nixon)
Supply and fixing Modular Switch , 6Amp, 2 way, 1 module, ISI marked complete all as specified and as directed by Engineer in Charge.. Make : Legrand(Arteor), Havells(Coral) , Goldmedal (Nixon)
Supply and fixing Modular Switch , 16 Amp, 1 way, 1 module, ISI marked complete all as specified and as directed by Engineer in Charge.. Make : Legrand(Arteor), Havells(Coral) , Goldmedal (Nixon)
Supply and fixing Modular Socket, 6 Amps, 2/3 pin combined 2 module, ISI marked complete all as specified and as directed by Engineer in Charge. Make : Legrand(Arteor), Havells(Coral) , Goldmedal (Nixon)
Supply and fixing Modular Socket, 6/16 Amps, 2/3 pin combined 2 module, ISI marked complete all as specified and as directed by Engineer in Charge.
Supply and fixing Modular type bell push , 6Amp, 1 module, ISI marked complete all as specified and as directed by Engineer in Charge. Make : Legrand(Arteor), Havells(Coral) , Goldmedal (Nixon)
Supply and fixing Bell electric AC 230Volt single pole musical type, ISI marked complete all as specified and as directed by Engineer in Charge.Make : Legrand(Arteor), Havells(Coral) , Goldmedal (Nixon)
Supply and fixing Modular type, electronic fan regulator ( 5 step ), 450 Watts, 230 volts, 2 module, ISI marked complete all as specified and as directed by Engineer in Charge. Make : Legrand(Arteor), Havells(Coral) , Goldmedal (Nixon)
Supply and fixing ceiling rose surface bakelite with ISI mark, flush type with ISI mark three terminals complete all as specified and as directed by Engineer in Charge. Make : Legrand(Arteor), Havells(Coral) , Goldmedal (Nixon)
Supply and fixing Modular white cover plate with Frame 2 Module complete all as specified and as directed by Engineer in Charge. Make : Legrand(Arteor), Havells(Coral) , Goldmedal (WEGA)
Supply and fixing Modular white cover plate with Frame 3 Module, ISI marked complete all as specified and as directed by Engineer in Charge. Make : Legrand(Arteor), Havells(Coral) , Goldmedal (WEGA)
Supply and fixing Modular white cover plate with Frame 4 Module complete all as specified and as directed by Engineer in Charge. Make : Legrand(Arteor), Havells(Coral) , Goldmedal (WEGA)
Supply and fixing Modular white cover plate with Frame 8 Module, ISI marked complete all as specified and as directed by Engineer in Charge.Make : Legrand(Arteor), Havells(Coral) , Anchor (Ave)
Supply and fixing Modular metal flush box 2 module complete all as specified and as directed by Engineer in Charge. Make : Make : Legrand(Arteor), Havells(Coral) , Goldmedal (WEGA)
Supply and fixing Modular metal flush box 3 module complete all as specified and as directed by Engineer in Charge. Make : Legrand(Arteor), Havells(Coral) , Goldmedal (WEGA)
Supply and fixing Modular metal flush box 4 module complete all as specified and as directed by Engineer in Charge.Make : Legrand(Arteor), Havells(Coral) , Goldmedal (WEGA)
Supply and fixing Modular metal flush box 8 module complete all as specified and as directed by Engineer in Charge. Make : Make : Legrand(Arteor), Havells(Coral) , Goldmedal (WEGA)
Supply and fix in repair Linear Aluminium Baten LED T/L 20W Aluminium Extruded Chanel Powder Coated with opaque diffuser for glare free light complete with accessories internally prewired and including connecting up with twin core twisted flexible copper conductor cable with suitable size complete all as specified and as directed by Engineer in Charge.
Supply and fix in repair Linear Aluminium Baten LED T/L 10W Aluminium Extruded Chanel Powder Coated with opaque diffuser for glare free light complete with accessories internally prewired and including connecting up with twin core twisted flexible copper conductor cable with suitable size complete all as specified and as directed by Engineer in Charge.
Material and labour for Lamp holder, PVC/ Polycarbonate type with cord grip cap suitable for pendant fittings complete all as specified and as directed by Engineer in Charge.
Supply and fix in repair LED lamp suitable for 14 watts, 240 volts, single phase, 50 Hzs, Lumen 1450 AC supply complete all as specified and as directed by Engineer in Charge.
Taking down MCB DB of any type, single phase including disconnection of all circuits complete with MCBs etc complete all as specified and as directed by Engineer in Charge.
Supply and fixing 8 way Double door type having protrection IP-42, with 200 Amps rated bus bar connecting with existing wiring circuits by providing copper pin terminals of suitable size complete all as specified and as directed by Engineer in Charge of comprising of the following :-
Supply and fixing Isolator SPN 63 Amps, 240 Volts, C Series . Make Legrand Model No 408620 or as approved by GE
Supply and fixing MCB SP 6-32 Amps, 240 Volts, C Series . Make Legrand Model No 408595 or as approved by GE.
Taking down old unserviceable submain cable, XLPE Cable of any size and capacity and finishing wall surfaces complete all as specified and as directed by Engineer in Charge.
Supply and fix 2 single core FRLS 1100 volts grade cable with stranded copper conductor of size 4.0 Sqmm in and including PVC conduits of suitable size not less than 25mm dia including 1 single core cable with stranded copper conductor of size 04 sqmm (green colour) for earthing. Note : 2 runs of 4 Sqmm cable, 1 run of PVC casing caping and 1 run of 04 Sqmm cable shall be measured as 1 Run.
Supply and fix 2 single core FRLS 1100 volts grade cable with stranded copper conductor of size 6 Sqmm in and including PVC conduits of suitable size not less than 25mm dia including 1 single core cable with stranded copper conductor of size 06 sqmm (green colour) for earthing. Note : 2 runs of 6 Sqmm cable, 1 run of PVC casing caping and 1 run of 06 Sqmm cable shall be measured as 1 Run.
Taking down Ceiling / Exhaust fan of any size, sealing cable end, dismantling blades carefully and removing fan and blades to MES E/M Store for safe custody all as directed by Engr-in- charge.
Supply and fixing Ceiling Fan of size 1200mm Sweep, ISI marked, BEE 5 Star rating, BLDC type and alongwith down rod fixed to ceiling and connecting up including provision of flexible 3 core copper cable & testing, smooth functioning at site complete all as specified and directed by the Engineer-in-Charge. (a) Taking down U/S C/Fan ( 03 C/ Fan per Qtr) of any capacity will be deposited in MES store yard (b) One additional fan will be provided as per MAP authorisation
Supply and fixing Exhaust fan 230mm sweep, 1400 RPM metallic body with louvers AC supply, single phase, 230 volts, 50Hz, complete fixing arrangements on the wall with nuts and bolts and making the good surfaces at site complete all as specified and as directed by Engineer in Charge. Note:- (a) Taking down U/S E/Fan ( One E/ Fan per Qtr) of any capacity will be deposited in MES store yard
Supply and fixing Exhaust fan 225 mm sweep, 1400 RPM plastic ABS body without sound with automatic shutter, AC supply, single phase, 230 volts, 50Hz, complete fixing arrangements on the wall with nuts and bolts and making the good surfaces all as specified and directed at site.
Supply and fix moduar single pole & neutral enclosure with a two pin earth plug and socket complete with one single pole MCB 20 Amps complete with modular box & modular plate complete all as specified and as directed by Engineer in Charge.
Supply, install, testing and commissioning of LT Panel meter cabin panel of minimum size 900 mm x900 mm x 450 mm mounted on angle iron frame 40x40x5 mm grouted on floor,cubical indoor type for 415V, 3 phase, made of 2 mm thick CRCA sheet weather, vermin proof factroy fabricated, CPRI approved, front open hinged door with locking arrangement powder coated, individual compartment for MCCBs and 400 Amps rated bus bar, top and bottom cable entry including disconnecting cable connections and electronic meters from old meter cabin panel and fixing/connecting in new insalled panel with provisions of thimble/lugs and necessary farmwork and PCC foundation 1:2:4 using 20 mm graded stone aggregates including shifting of existing (old) LT Panel, if any, making arrengement for fixing of panel and making good to disturbed surface as directed comprising of the following
MCCB, FP, 250 Amps 36 kA- 02 Nos.
Isolator 63 Amps, 10KA, B series - 16 No .
Sheet metal enclosure 2 way without bus bar - 16 No,
Copper Bus bar, 400 Amps Rated - R,Y,B & N
Digital Ammeter-01 No
Digital Voltmeter-01 No
Phase indicator lamp R,Y & B
Making provision for fixing of digital electronic meters removed from old panel including fixing and providing vision glasses - 16 Nos.
Material and labour for 2 core 10 Sqmm multistranded copper conductor cable 1100V form bus bar to electronic energy meters using suitable size copper thimbles/glads.
Fixing of submain cable 2 core 10 Sqmm copper conductor with outgoing of energy meter complete all as specified and as directed by Engineer in Charge.
Supply, install, testing and commissioning of LT Panel CPRI Approved mounted on angle iron frame 40x40x5 mm grouted on floor,cubical outdoor type, with both side opening Minimum size 1200x1200x600 mm or suitable fixing of all breakers and controls, for 415V, 3 phase, made of 3 mm thick CRCA sheet weather, vermin proof factroy fabricated, CPRI approved, front open hinged door with locking arrangement powder coated, individual compartment for MCCBs and 800 Amps rated bus bar, top and bottom cable entry including disconnecting cable connections Panel and fixing/connecting in new insalled panel with provisions of thimble/lugs and necessary farmework and PCC foundation including shifting of existing (old) LT Panel, if any, making arrengement for fixing of panel and making good to disturbed surface as directed comprising of the following :-
MCCB 400 Amps, 36 KA, FP - 01 Nos
MCCB 125 Amps, 25 KA, TP - 04 Nos
MCCB 100 Amps, 25 KA, TP - 08 Nos
MCCB 63 Amps, 16 KA TP - 04 Nos
MCB DP 40 Amps - 06 Nos
Aluminium bus bar 800 Amps for phase & 400 Amps for neutral complete with bus bar insulator,nuts & bolts complete all as specified and as directed by Engineer in Charge.
Power panel wiring between bus bar to MCCB of different capacity with PVC insulated multistranded copper cable , single core ,1100 volts grade of appropriate size complete with copper lugs
Supply, laying including testing and commissioning PVC insulated XLPE, armoured LT cable, 1100 Volts grade with aluminium conductor of size 3.5 core 185 Sqmm laid through pipe /ducts or fixed on wall etc complete all connections to LT panel with proper size glands & lugs complete all as specified and as directed by Engineer in Charge.
Supply and fixing baton intergrated LED channel 1x12 WH, flexible neck for adjusting beam, bronze finish for superior feel, 3000K with warm white (Color rendering CRI>8) complete accessories internally prewired and including connecting up with twin core twisted flexible copper conductor cable with suitable size complete all as specified and as directed by Engineer in Charge. Make- CAT Part : 31403 Muziris in Philips/ Jaquar/ Havells/ Syska or as approved by GE
Supply and fixing LED inverter bulb 9W works on AC supply in normal mode and DC supply in inverter mode with inbuilt battery backup of upto 04 hours, high efficiency , high output complete all as specified and as directed by Engg -In -Charge.
Supply and fixing 36W LED ceiling light with inbuilt smart motion sensor, 230 Volt , 50 Hz , 2x2 feet, CRCA sheet metal, powder coated with diffuser for glare free light, Inbuilt motion sensor prewired with 25% dimmer illuminous in ideal time with all accessories with following specification:- (i) Housing-Aluminum Extrusion,diffuser- opal, sensor type- HF Inbuilt integral, occupancy/ movement sensor, LED type- MID power ,Light distribution- general Spread, LED efficiency - > 130 lumen/Watt, System effieciency- > 100 lumen/Watt, Driver efficiency - more than 85%, power factor- more than 0.95, THD - <10%, Mounting/Fixing- recess mounting, Ingress Protection - IP-20, sensor range- upto 5 mtrs(cone formation ), Dimming operation- default operation at 25% of the is rated value. On detection of motion, light output rises to 100% for upto 20 sec . in absence of otion switches back to default operation, LED life- upto 50,000 Hrs.Surge Protection- not less than 4KV. Note:- (i) contractor shall submit LM79 report LM 80Test certificates before claiming for payment .(ii) Warranty certificate for minimum 1 years to be submitted from OEM.
Materal and labour for in repair CPT Cirprotec CPT-L ESE Lighting rod with stainless steel body type advance lightning protection system in compliance with standard NFC 17-102 & UNE 21186-96, working on principle of early streamer emission technology which will offer level 1 protection for upto 42 mtrs radius when mounted on the RCC concrete base on building at a height of 4.5 mtrs from the place to protected complete all as specified and directed.. make:- NIMBUS-JEF Techno or erico as approved by GE
Supply and erection of in repair mounting structure of 4.5 mtrs height with base plate suitable for roof mounting on RCC concrete base on building complete all as specified and as directed by Engineer in Charge. Make:- NIMPUS-JEF Techno or erico as approved by GE
Supply and fixing of in repair 1x 50 sqmm copper conductor with 0.5 mm thick PVC sheathed cable complete all as specified and as directed by Engineer in Charge.
Supply and fixing in repair 4 digital electromechanical lightning event counter in weather proof resistance complete all as specified and as directed by Engineer in Charge.. Make:- JEF Techno or erico as approved by GE
Supply and fixing of in repair test link for connecting the earth pit and down conductor complete all as specified and directed.. Make:- JEF Techno or erico as aproved by GE
Material & labour for in repair maintanance free enviroment friendly earth electrode set comprising of 17.2mm dia, 3m long rod low carbon steel molecular copper bounded for a thickness of 250 micro OHMS, highly conductive ANS/INSF STD-60 certified carbon bound backfill compound which shall set like concrete according to BS 7430 & IEEE 80 (each bag shall contain 50 Ibs) complete all as specified and directed.. make:- JEF Ecosfe or erico as approved by GE
Material and labour for in repair PCC pit 1:2:4 type B-1, cover reinforced with XPM, weight not less than4kg/sqm and 6mm dia bar handle earth pit angle iron frame of size 25x25x3mm complete all as specified and as directed by Engineer in Charge.
Material and labour for taking down and refixing of fire alarm panel after painting, fixing of old cables any type etc complete all as specified and as directed by Engineer in Charge.
Material and labour for taking down and refixing of fire fighting pipeline upto 150 mm dia after painting as per existing color/as per colour code for high rise building including all safety measures, all as specified and directed by Engineer - in- Charge
Material and labour for taking down and refixing of Hose reel Box after painting as per existing color/as per colour code, all as specified and directed by Engineer - in- Charge
Supply and fixing Hose reel of 36 RM complete all as specified and as directed by Engineer in Charge.
Material and labour for taking down and refixing of SCADA System Valves, Water Level Indicators/sensor and wirings complete all as specified and as directed by Engineer in Charge.
Supply and fix , testing and commissioning of storage type water heater (geyser) vertical type of 06 Ltrs capacity , single phase, vertical type, Rust Resistant, ABS made with thermal cut off with power consumption 1500 watts, ISI marked, BEE 5 star rating including fixing on wall with chroumium plated screws & nut bolts connected to existing water and electric connection complete all as specifed and directed by Engr-in-Charge. Note:- (a) 65 geyser will be provided as per MAP auth.
Supply and fix RCCB with MCB of 2 Pole, 20 Amps rating with sensitivity of 30 mA suitable for 240 Volts complete all as specified and as directed by Engineer in Charge.
Supply and fix 15 Amps plug top, AC 230 volts, ISI marked complete all as specified and as directed by Engineer in Charge.
Supply and fix hot water extension pipe made out of copper chromium plated 450mm long with brass adaptor and fixing in position complete all as specified and as directed by Engineer in Charge.
Supply and fix in repair 450mm long PVC connector with brass adaptor, washer and fixing in position complete all as specified and as directed by Engineer in Charge.
Taking up or down 25mm bore steel tubing and connections, complete all as specified and complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 25mm bore steel water tubes, medium grade, galvanised, with all fitting and fixed complete to walls and ceilings or laid in floors complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Supply and fixing 40mm bore forged pressure reducing Valve (PRV) made up of brass rugged body, piston operated with all fittings to be fixed with GI pipe upto complete all as specified and as directed by Engineer in Charge.
Supply and fixing name of building "DHANISTHA" in Bold and hollow letters Height - 450mm, 40mm wide made up of 1mm thick Stainless-Steel Sheet (304) with all fixing arragements complete all as specified and as directed by Engineer in Charge.
Supply and fixng number plate, size of plate should be 130mm x 100mm x 2mm thick rectangular in shape made up of Stainless Steel (304), number and border of plate should be engraved/ itched and filled with black metallic colour, Four (04) numbers of holes to be provided for fixing with 04 numbers of round headed Chromium Plated Screws. Number plate to be fixed at front of each qtr complete all as specified and as directed by Engineer in Charge.
Material and labour for post Construction anti termite treatment at the points of contact with wooden surface by Anti Termite Chemical Emulsion (in oil or kerosine based solution) @ 0.5 liter/hole by drilling 6 mm dia holes at downward angle of 45 degree at 150 mm center to center and sealing the same, complete all as specified and as directed by Engineer in Charge.
From Ground floor to 4th floor
From 5th floor to 8th floor
From 9th floor to 12th floor
From 13th floor to 16th floor
Material and labour for laying RG6 Cable for TV in PVC conduit from Ground floor to Drg room of each qtrs. complete all as specified and as directed by Engineer in Charge.
Material and labour for TV socket jack with pressed steel sunken box with 3mm thick PVC top cover complete all as specified and as directed by Engineer in Charge.
Garima Construction Co
S S ENTERPRISES
SN CONSTRUCTION
Shetty Construction Co
Darpan Construction
AGRAWAL ASSOCIATES
Nexus Infratech
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .