| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.2 LAccepted-AOC SONITPUR | ASSAM | 784001 | ₹82.2 L Quoted ₹69.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹69.8 L+₹13,968.51 (0.20%)Rejected-Finance | ₹69.8 L+₹13,968.51 (0.20%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical NEERU WALA BAGH FIROZABAD UTTAR PRADESH | - | - | Rejected-Technical NON RESPONSIVE |
Tender Value
₹70.4 L
EMD Value
₹1.4 L
Closing Date
10 Aug 2026, 12:00 pmClosed
OFFICE OF SE RED CIRCLE KANPUR 119 MANGALA VIHAR-2
OFFICE OF SE RED CIRCLE KANPUR 119 MANGALA VIHAR-2 KANPUR NAGAR
Construction of a road from beneath the Panki Dham bridge via the railway crossing to the Saraymita intersection
2026_REDUP_1172764_1
988/RED/Tender/TVY 25-26(KANPUR NAGAR)/bond clerk /2026-27 DT 17.07.2026
Open Tender
Civil Works - Roads
Percentage
120 days
KANPUR NAGAR
TECHNICAL PART
2 documents required · 2 mandatory
₹3,500
₹1.4 L
Yes
15 Sept 2026
27 Jul 2026
10 Aug 2026
27 Jul 2026
10 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismentling of flexible pavement and disposal of dismentled material up to a lead of 100 m stacking servicable and unserviceable material seprately as per technical specification clause 202.2.14 | 24.75 | Cum | 313.5 | ₹7,759.13 |
| 1.02 | Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300.1 and 300.2 as per Technical Specification Clause 301.5 & Sl No.3.3 | 63.2 | Cum | 98.61 | ₹6,232.15 |
| 1.03 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density as per MORD specification 401 | 439.69 | Cum | 2,583.72 | ₹11,36,035.85 |
| 1.04 | Providing,Laying,Spreading and compacting graded stone aggregates to Wet Mix Macadem specification including premixing the material with water at OMC in mechanical Mixer (Pug Mill) carriage of mixed Material by tipper to site,laying in uniform layers in sub base/base course on a well prepared sub base and compacting with smooth wheel roller 80-100 KN weight to achieve the desired density including lighting,barricating and maintenance of diversion,etc,as per tables 400.11 & 400.12 and Technical Specification Clause 406.. | 572.79 | Cum | 3,146.5 | ₹18,02,283.73 |
| 1.05 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 4,582.35 | sqm | 63.08 | ₹2,89,054.64 |
| 1.06 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to .30 kg per sqm on the prepared granual surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 | 4,582.35 | sqm | 20.71 | ₹94,900.47 |
| 1.07 | Providing and Laying bituminous Macadem with higher capacity hot mix plant using crushed aggregates of specific grading premixed with bituminous binder transported to site, laid over a previously prepared surface with paver finisher to the required grade level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. | 229.12 | cum | 9,148.31 | ₹20,96,060.79 |
| 1.08 | Providing and Laying bituminous Concrete with higher capacity batch type hot mix plant using crushed aggregates of specific grading, premixed with bituminous binder @ 5.40% of Mix and filler transporting the Hot Mix to work site, laying with a hydrostatic paver finisher with senser control to the required grade level and alignment, rolling with smooth wheeld vibratory and tendem rollers to acheive the desired construction as per MORT&H specification clause No.507 complete in all respects. | 114.56 | cum | 12,842.2 | ₹14,71,202.43 |
| 1.09 | Road making with Hot applied thermoplast compound with reflectorising glass beads on bituminous surface providing and laying of hot applied thermoplast compound 2.5 mm thick including reflectorising glass beads @ 250 gm/sqm area thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC.35 finished surface to level unform and free streaks and holes as per PWD SOR Lko Morth 803(8.13) | 126 | sqm | 587.1 | ₹73,974.6 |
| 1.1 | Supply and fixing 4.00X2.50 Ft.Size Inauguration Stone of Granite.Sanction by SE RED Knp. | 1 | Nos | 2,918.4 | ₹2,918.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.50 MB
BOQ_2202313.xls
BOQ • 0.25 MB
988SBD.pdf
Tender Documents • 2.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .