Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | FIRST₹19.8 LAccepted-AOC 259 4TH CROSS HAL III STAGE BANGALORE 560075 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560075 | FIRST | Accepted-AOC BEING LOWEST | |
| 2 | SECOND₹22.3 LRejected-Finance NO 49 MSN NILAYAM 3RD CROSS HILL VIEW GARDEN TUNAHALLI SUBRAMANYAPURA POST BANGALORE 560061 | BANGALORE | BANGALORE | KARNATAKA | 560061 | SECOND | Rejected-Finance BEING NOT LOWEST | |
| 3 | THIRD₹22.7 LRejected-Finance | THIRD | Rejected-Finance BEING NOT LOWEST | |
| 4 | FORTH₹23.4 LRejected-Finance NO 28 4TH A CROSS 1ST MAIN ROAD ATTUR LAYOUT YELAHANKA NEW TOWN BANGALORE 560064 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560064 | FORTH | Rejected-Finance BEING NOT LOWEST | |
| 5 | FIFTH₹26.7 LRejected-Finance | FIFTH | Rejected-Finance BEING NOT LOWEST |
| Sl No | Description | Qty | Unit | PRAGATHI BUILDERS L2 | B5BUILDING SOLUTIONS L5 | ABHISHEK CONSTRUCTIONS L1 | Srinivas G Civil Contractor L3 | GNANI BUILDERS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exc 1.50m wide and not exc 1.50m depth and getting out in Hard/Dense soil including dewatering from the excavated trenches before concreteing for foundation complete all as specified and directed. Note: All excavation shall be carried out manually. The contractor shall be liable for any damage caused to underground (UG) cables, OFC, AFNET, BSNL, water lines, or sewage lines during excavation and must make good such damages at their own cost. | 40 | Cum | 360 ₹14,400 | 400 ₹16,000 | 250 ₹10,000 Lowest | 600 ₹24,000 | 400 ₹16,000 |
| 2.00 | Material & labour for plain cement concrete mix 1:4:8, type D2 using 40mm graded stone aggregate as in foundation, filling and mass concrete. | 9.6 | Cum | 4,500 ₹43,200 | 6,000 ₹57,600 | 3,500 ₹33,600 Lowest | 7,500 ₹72,000 | 5,000 ₹48,000 |
| 3.00 | Material & labour for formwork to side of concrete foundations, footings, plinth beams etc. | 75 | Sqm | 500 ₹37,500 | 500 ₹37,500 | 550 ₹41,250 | 470 ₹35,250 Lowest | 500 ₹37,500 |
| 4.00 | M & L RCC M 25 (using 20 mm graded stone aggregate ) as in foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, piles foundation and mass concrete complete all as specified and directed.
Note : The work shall be carried out in low laying/water logged area, the quoted rate shall be included for dewatering from the foundation before concrete casting, base of column or plinth beam etc. | 16 | Cum | 9,000 ₹1,44,000 | 8,900 ₹1,42,400 | 9,500 ₹1,52,000 | 9,000 ₹1,44,000 | 7,500 ₹1,20,000 Lowest |
| 5.00 | Material & labour for RCC M 25 design mix using 20mm graded stone aggregate for columns, pillers, piers, posts and struts for fair finished flat concrete surfaces. | 8 | Cum | 9,000 ₹72,000 | 8,750 ₹70,000 | 9,500 ₹76,000 | 9,000 ₹72,000 | 7,500 ₹60,000 Lowest |
| 6.00 | Material & labour for formwork tosides of column with fair finished surfaces complete all as specified & as directed. | 93 | Sqm | 550 ₹51,150 | 500 ₹46,500 | 450 ₹41,850 Lowest | 550 ₹51,150 | 500 ₹46,500 |
| 7.00 | Material & labour for RCC M 25 design mix with 20mm graded stone aggregate in beams, cantilevers, bressumers, lintels over 1.50m span. | 4.5 | Cum | 9,000 ₹40,500 | 8,700 ₹39,150 | 9,500 ₹42,750 | 9,000 ₹40,500 | 7,800 ₹35,100 Lowest |
| 8.00 | Material & labour for formwork to side and soffits of beams, lintels etc. with rough finished surfaces complete all as specified & as directed. | 39 | Sqm | 600 ₹23,400 | 525 ₹20,475 | 450 ₹17,550 Lowest | 750 ₹29,250 | 550 ₹21,450 |
| 9.00 | Returning, filling in, including spreading leveling watering and well ramming in layers not exc 25cm. | 30 | Cum | 100 ₹3,000 Lowest | 140 ₹4,200 | 100 ₹3,000 Lowest | 180 ₹5,400 | 200 ₹6,000 |
| 10.00 | Removing excavated surplus material not exc 50m and depositing where directed at a level not exc 1.5m above the starting point. | 10 | Cum | 200 ₹2,000 | 160 ₹1,600 | 100 ₹1,000 Lowest | 1,100 ₹11,000 | 250 ₹2,500 |
Tender Value
₹24 L
EMD Value
₹48,000
Closing Date
1 Jun 2026, 6:00 pmClosed
GE AF MARATHAHALLI
GE AF MARATHAHALLI WIND TUNNEL ROAD, KEMPAPURA, YEMALUR POST, BANGALORE. PIN- 560037
SPECIAL REPAIR TO BOUNDARY WALL AND APPRAOCH PATH AT BLDG NO. 24 TO 25 AT GAGAN VIHAR AT 26 ED AF UNDER GE (AF) MARATHAHALLI BANGALORE
2026_MES_764854_1
8827/E8
Open Tender
Civil Works
Item Rate
210 days
GE AF MARATHAHALLI
AS PER ENIT
7 documents required · 7 mandatory
₹500
GE AF MARATHAHALLI
₹48,000
Yes
30 Jul 2026
12 May 2026
6 Jun 2026
12 May 2026
1 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exc 1.50m wide and not exc 1.50m depth and getting out in Hard/Dense soil including dewatering from the excavated trenches before concreteing for foundation complete all as specified and directed. Note: All excavation shall be carried out manually. The contractor shall be liable for any damage caused to underground (UG) cables, OFC, AFNET, BSNL, water lines, or sewage lines during excavation and must make good such damages at their own cost. | 40 | Cum | 1.25 | ₹50 |
| 2 | Material & labour for plain cement concrete mix 1:4:8, type D2 using 40mm graded stone aggregate as in foundation, filling and mass concrete. | 9.6 | Cum | - | - |
| 3 | Material & labour for formwork to side of concrete foundations, footings, plinth beams etc. | 75 | Sqm | 100 | ₹7,500 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
TENDER.pdf
Tender Documents • 0.56 MB
BOQ_856656.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .