Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.2 L+₹22,822.93 (3.27%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹7.4 L+₹42,203.30 (6.05%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹8.0 L+₹1.0 L (14.7%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹8.8 L+₹1.8 L (26.2%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹12.8 L
EMD Value
₹25,500
Closing Date
29 Oct 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Xen Rew Office Kathua
Xen Rew Office Kathua
Laying of Tiles and allied works near Shiv Shankar Yog Ashram at Subechack Block Hiranagar
2026_RDPR_328680_1
e-NIT No.278/REW/K of 2026-27 Dated 19/10/2026
Open Tender
Civil Works
Percentage
150 days
Hiranagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹25,500
30 Oct 2026
19 Oct 2026
30 Oct 2026
19 Oct 2026
29 Oct 2026
19 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including
stacking material within 50 meters lead.
15.23.1 For thickness of tiles 10 mm to 25 mm | 103.28 | sqm | 57 | ₹5,886.96 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:
15.2.1 1:3:6 or richer mix (i/c equivalent design mix) | 32.12 | Cum | 1,725.2 | ₹55,413.42 |
| 3 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in 1:6 mix | 5.9 | Cum | 7,571.55 | ₹44,672.15 |
| 4 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 5.9 | Cum | 1,455.65 | ₹8,588.34 |
| 5 | 12mm Plaster in 1:4 mix | 19.28 | Sqm | 266.2 | ₹5,132.34 |
| 6 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) | 278.81 | Sqm | 98.75 | ₹27,532.49 |
| 7 | Providing and fixing aluminum work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixed with dash fastener of required dia. and size including necessary filling up of gaps at junctions i.e, at top, bottom and sides with required EPDM rubber / neoprene gasket felt etc. Aluminum sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminum snap beading for
glazing / panelling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-Charge (glazing,
panelling and dash fasteners to be paid for separately.) For fixed portion Anodized aluminum (Anodized transparent or dyed to required
shade according to IS:1868, minimum anodic coating of grade AC 15) | 90 | kg | 481.95 | ₹43,375.5 |
| 8 | Providing and fixing aluminum work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixed with dash fastener of required dia. and size including necessary filling up of gaps at junctions i.e, at top, bottom and sides with required EPDM rubber / neoprene gasket felt etc. Aluminum sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminum snap beading for glazing / panelling, C.P. brass / stainless steel screws, all complete as per
architectural drawings and the directions of Engineer-in-Charge (glazing, panelling and dash fasteners to be paid for separately.) For shutters of doors, windows & ventilators including
providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately.)
22.1.2.1 Anodized aluminum (Anodized transparent or dyed to required shade according to IS:1868, minimum anodic coating of grade AC 15) | 116.34 | kg | 574.45 | ₹66,831.51 |
| 9 | Providing and fixing glazing in aluminum door, window, ventilator
shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineerin-charge. (Cost of aluminum snap beading shall be paid in basic item.) 22.3.1 With floating glass panes of 4.0 mm thickness (weight not less than 10.00 kg / sqm) | 13.75 | Sqm | 1,061.95 | ₹14,601.81 |
| 10 | Providing and fixing fly proof wire gauge to windows and clerestory windows using wire gauge with average width of aperture 1.4 mm in both directions all complete. With Galvanized M.S. Wire gauge with wire of dia 0.63 mm With 12 mm mild steel U beading | 12.45 | sqm | 827.4 | ₹10,301.13 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.87 MB
BOQ_1113078.xls
BOQ • 0.32 MB
278221026.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .