Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹10.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.5 L+₹62.96 (<0.01%)Admitted-Fee/PreQual/Technical/Finance 4 107 EDAYARPALAYAM KUNIYAMUTHUR COIMBATORE 641 008 | COIMBATORE | TAMIL NADU | 641008 | ₹10.5 L+₹62.96 (<0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹12.0 L+₹1.5 L (14.1%)Admitted-Fee/PreQual/Technical/Finance | ₹12.0 L+₹1.5 L (14.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JAYALAKSHMI BUKDERS L2 | svasit Engineers L1 | MJ Infrastructures L3 |
|---|---|---|---|---|---|---|
| 1.00 | 1.Earth work excavating and depositing on bank with initial lead of 10m & initial lift
of 2m in Sand, silt or other loose soil, wet sand or silt notunder water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B) (SCH.No.50 ) etc., complete | 148 | M3 | 187 ₹27,676 | 180 ₹26,640 | 99.5 ₹14,726 Lowest |
| 2.00 | Dismantling the damaged RCC Slab as per Instruction of departmental officers..including all initial lead and lift etc complete. | 1 | M3 | 4,310.64 ₹4,310.64 | 2,000 ₹2,000 | 1 ₹1 Lowest |
| 3.00 | Desilting the exg drain as per Instruction of departmental officers..including all initial lead and lift etc complete. | 29 | M3 | 108.93 ₹3,158.97 | 9.9 ₹287.1 | 1 ₹29 Lowest |
| 4.00 | Dismantling the damaged PCC WALL as per Instruction of departmental officers..including all initial lead and lift etc complete. | 18 | M3 | 486.41 ₹8,755.38 | 200 ₹3,600 | 1 ₹18 Lowest |
| 5.00 | Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 697 | M2 | 453.99 ₹3,16,431.03 | 440 ₹3,06,680 Lowest | 534 ₹3,72,198 |
| 6.00 | 6. Conveying the excavated earth,desilting materials dismantling concrete from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 194 | M3 | 88.4 ₹17,149.6 | 80 ₹15,520 Lowest | 104 ₹20,176 |
| 7.00 | 7.Plain Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 31 | M3 | 5,068.06 ₹1,57,109.86 | 4,500 ₹1,39,500 Lowest | 5,962 ₹1,84,822 |
| 8.00 | 8.Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete | 7 | M2 | 302.65 ₹2,118.55 Lowest | 326 ₹2,282 | 356 ₹2,492 |
| 9.00 | 9.Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard Specification | 28 | M3 | 6,176.81 ₹1,72,950.68 Lowest | 7,000 ₹1,96,000 | 7,266 ₹2,03,448 |
| 10.00 | Plain Cement Concrete 1:3:6 (one cement, three crushed Stone Sand (M-Sand) and six coarse aggregates) using 20mm size ISS HBG metalincluding cost and conveyance of all materials to site and including forthe mixing, laying and labour charges etc., complete as per standardspecification | 53 | m3 | 5,713.33 ₹3,02,806.49 Lowest | 6,000 ₹3,18,000 | 6,721 ₹3,56,213 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
3 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Renewal of Cement Concrete Flooring and Reconstruction of Storm Water Drain at Dr.Radhakrishnan street in ward no.75 of West Zone
2026_MAWS_694692_25
E54/2026-WZ Single
Open Tender
Civil Works
Works
120 days
Coimbatore corporation
AS PER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹15,000
3 Sept 2026
17 Aug 2026
3 Sept 2026
17 Aug 2026
3 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Earth work excavating and depositing on bank with initial lead of 10m & initial lift
of 2m in Sand, silt or other loose soil, wet sand or silt notunder water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B) (SCH.No.50 ) etc., complete | 148 | M3 | - | - |
| 2 | Dismantling the damaged RCC Slab as per Instruction of departmental officers..including all initial lead and lift etc complete. | 1 | M3 | - | - |
| 3 | Desilting the exg drain as per Instruction of departmental officers..including all initial lead and lift etc complete. | 29 | M3 | - | - |
| 4 | Dismantling the damaged PCC WALL as per Instruction of departmental officers..including all initial lead and lift etc complete. | 18 | M3 | - | - |
| 5 | Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 697 | M2 | - | - |
| 6 | 6. Conveying the excavated earth,desilting materials dismantling concrete from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 194 | M3 | - | - |
| 7 | 7.Plain Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 31 | M3 | - | - |
| 8 | 8.Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete | 7 | M2 | - | - |
| 9 | 9.Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard Specification | 28 | M3 | - | - |
| 10 | Plain Cement Concrete 1:3:6 (one cement, three crushed Stone Sand (M-Sand) and six coarse aggregates) using 20mm size ISS HBG metalincluding cost and conveyance of all materials to site and including forthe mixing, laying and labour charges etc., complete as per standardspecification | 53 | m3 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
ITB.pdf
Additional Documents • 0.19 MB
SingleDocument.pdf
Tender Documents • 0.59 MB
BOQ_835345.xls
BOQ • 0.32 MB
e52toe55Extension.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .