| 1 | Admitted-Finance NEDUVASAL EAST ALANGUDI TALUK PUDUKKOTTAI DISTRICT 622304 | PUDUKKOTTAI | TAMIL NADU | 622304 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹9,980
Closing Date
29 Dec 2022, 6:00 pmClosed
BLOCK DEVELOPMENT OFFICER VP , SETHUBAVACHATRAM
BLOCK DEVELOPMENT OFFICE , SETHUBAVACHATRAM
Renovation of Pond construction of Inlet and Outlet Revetment and Bathing Ghat at Patchai kuttai kulam in Adaikkadevan Sethubavachatram Block in Thanjavur District under AGAMT
2022_RDTN_275101_1
2315/2022/B1/AGAMT-II/47
Open Tender
Civil Works - Others
Works
180 days
BLOCK DEVELOPMENT OFFICE, SETHUBAVACHATRAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹9,980
Yes
3 Jan 2023
24 Dec 2022
29 Dec 2022
24 Dec 2022
29 Dec 2022
24 Dec 2022
Amount
Renovation of Pond construction of Inlet& outlet , Revetment and Bathing ghat at Patchai kuttai kulam in Adaikkadevan Panchayat
Desiliting of pond
Clearing the light juncle and Removal away from the site including charges as the standard specification
earth in all soils expert hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaay and tippers including etc.
Add to revavent T.N.D.S.S no . 20 rates for new tank bunds and closing breaches for extra watering consolidation by power roller
earth work deploying earth moving machinary and conveying for formation of bund with lead of junle clearene (uoto 3 m width) earth moving machinaay and tippers including etc.
Provision for Demacration stone (90cm *15 cm * 15cm)
INLET &OUTLET STRUCTURE
earth work excavation for foundation in all soils and sub-soils full depth as may be direct expect in hart rack soil requring blasting butinclusive of shorting , structing and bailling out water etc.
supply and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick well ramed watered and campacted etc
C.C.(1:4:8) Mix using 40mm ISS & HBG metal including cost & conveyance & Labour charge etc. complete
Supplying and and erection of steel centering using mild steel sheets including Cost and conveyance, labour charges etc, Complete
C.C.(1:3:6) Mix using 20mm ISS & HBG metal including cost & conveyance & Labour charge etc. complete.
cost and supply of RCC 600 mm dia pipe at site including all charges and conveyance etc,complete
provision for RCC 600 dia collar
labour charges for fixing RCC pipe proper line and gradient and fixing the collar , finishing with cement morter including cost and conveyance etc.
BATHING GHAT
earth work excavation for foundation in all soils and sub-soils full depth as may be direct expect in hart rack soil requring blasting butinclusive of shorting , structing and bailling out water etc
supply and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick well ramed watered and campacted etc
C.C.(1:4:8) Mix using 40mm ISS & HBG metal including cost & conveyance & Labour charge etc. complete
Supplying and and erection of steel centering using mild steel sheets including Cost and conveyance, labour charges etc, Complete
C.C.(1:3:6) Mix using 20mm ISS & HBG metal including cost & conveyance & Labour charge etc. complete.
Exterior emulson two coats using plastic emulsion paint including cosy and conveyance of all material and labour charges etc.
ROUGH STONE DRY PACKING
earth work excavation for foundation in all soils and sub-soils full depth as may be direct expect in hart rack soil requring blasting butinclusive of shorting , structing and bailling out water etc.
supply and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick well ramed watered and campacted etc
C.C.(1:4:8) Mix using 40mm ISS & HBG metal including cost & conveyance & Labour charge etc. complete
Supplying and and erection of steel centering using mild steel sheets including Cost and conveyance, labour charges etc, Complete
C.C.(1:3:6) Mix using 20mm ISS & HBG metal including cost & conveyance & Labour charge etc. complete.
Providing Roughstone Dry packing for Revetment icluding cost and conveyance of all materials and labour chrges etc.
Gravel backing revetments including all labour charges for filling etc .. Complete .
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K DHASHINAMOORTHY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .