| 1 | L1₹57.5 LAccepted-AOC | ₹57.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹58.2 L+₹73,188.82 (1.27%)Rejected-AOC WARD NO 13 GURUNANAK NAGAR BONGAIGAON | DHUBRI | ASSAM | 783371 | ₹58.2 L+₹73,188.82 (1.27%) | L2 | Rejected-AOC L2 |
| 3 | L3₹59.4 L+₹1.9 L (3.38%)Rejected-AOC GURUNANAK NAGAR WARD NO 13 HOUSE NO 345 CITY TOWN P O P S BONGAIGAON DISTRICT BONGAIGAON PIN 783380 | BONGAIGAON | ASSAM | 783380 | ₹59.4 L+₹1.9 L (3.38%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | SRI SHRIRAM RABIDAS L2 | Sibji Rabi Das L3 | Samrat Brahma L1 |
|---|---|---|---|---|---|---|
| 1.00 | 1. Earth work in filling
Construction of Embankment with approved materials obtained from borrow pits, with all lift and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 (including compensatio3n of earth) (including cost of testing of materials at site and laboratory as directed by the deptt.)
a) Private land | 6,673.74 | Cum | 235 ₹15,68,328.9 Lowest | 255 ₹17,01,803.7 | 258 ₹17,21,824.92 |
| 2.00 | 2. Sand Gravelling the road surface
Collection and supply of Sand gravel containing 60% sand and 40% gravel at quarry free from disintegrated and flaky pieces vegetation or other dileterious matter and adherent coating etc. including cost of loading & unloading at road side, stacking in measurable stack as directed by the Deptt. including payment of forest royalty and sale tax etc. | 1,125 | Cum | 1,750 ₹19,68,750 | 1,750 ₹19,68,750 | 1,628 ₹18,31,500 Lowest |
| 3.00 | Labour for spreading metal gravel/ granular material on the road surface as directed including dressing and cambering the formation and utilizing the loose earth in filling the depression as directed including carriage of gravel within 30 m | 1,125 | Cum | 210 ₹2,36,250 | 205 ₹2,30,625 Lowest | 217 ₹2,44,125 |
| 4.00 | 3. CD Work: Construction of 600 mm dia culvert, 8 Nos.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
I) Ordinary soil
Upto 3 m depth | 116.24 | Cum | 115 ₹13,367.6 | 105 ₹12,205.2 Lowest | 128 ₹14,878.72 |
| 5.00 | Bedding of pipe
Laying concrete cradle bedding with M 15 Grade Cement Concrete as per Clause 1105 (i) | 29.52 | Cum | 5,500 ₹1,62,360 Lowest | 5,500 ₹1,62,360 Lowest | 5,894 ₹1,73,990.88 |
| 6.00 | Plain Cement Concrete M 10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 | 11.6 | Cum | 6,000 ₹69,600 Lowest | 6,000 ₹69,600 Lowest | 6,037 ₹70,029.2 |
| 7.00 | Providing and Laying Reinforced Cement Concrete Pipe NP 3 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
B) 1000 mm dia | 60 | Rm | 8,500 ₹5,10,000 | 8,500 ₹5,10,000 | 7,788 ₹4,67,280 Lowest |
| 8.00 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203
Brick masonry in 1:3 cement mortar | 99.12 | Cum | 8,250 ₹8,17,740 | 8,200 ₹8,12,784 | 7,692 ₹7,62,431.04 Lowest |
| 9.00 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204
I) In 1:3 cement mortar | 21.36 | Cum | 8,500 ₹1,81,560 | 8,500 ₹1,81,560 | 8,224 ₹1,75,664.64 Lowest |
| 10.00 | Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification | 257.04 | Sqm | 146 ₹37,527.84 | 145 ₹37,270.8 Lowest | 146 ₹37,527.84 |
Tender Value
₹57.5 L
EMD Value
₹1.1 L
Closing Date
8 Jun 2026, 1:30 pmClosed
the Addl. Chief Engineer cum Director, PWD
O/o the Addl. Chief Engineer cum Director, PWD
Sand Gravelling of road with earth filling from Sibrubari at Ch. 1.200 Km to Arnibli (Dihira) via Moinaguri SSB Camp under Baksa District for the year 2025-26 TN_04_14
2026_BTC_52388_14
ACE-106/PWD/IFB/PT-I/23-24/285
Open Tender
Civil Works – Roads
Item Rate
180 days
Baksa
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹1.1 L
Yes
17 Aug 2026
18 May 2026
8 Jun 2026
18 May 2026
8 Jun 2026
18 May 2026
18 May 2026 - 8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Earth work in filling
Construction of Embankment with approved materials obtained from borrow pits, with all lift and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 (including compensatio3n of earth) (including cost of testing of materials at site and laboratory as directed by the deptt.)
a) Private land | 1 | Cum | - | - |
| 2 | 2. Sand Gravelling the road surface
Collection and supply of Sand gravel containing 60% sand and 40% gravel at quarry free from disintegrated and flaky pieces vegetation or other dileterious matter and adherent coating etc. including cost of loading & unloading at road side, stacking in measurable stack as directed by the Deptt. including payment of forest royalty and sale tax etc. | - | Cum | - | - |
| 3 | Labour for spreading metal gravel/ granular material on the road surface as directed including dressing and cambering the formation and utilizing the loose earth in filling the depression as directed including carriage of gravel within 30 m | - | Cum | - | - |
| 4 | 3. CD Work: Construction of 600 mm dia culvert, 8 Nos.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
I) Ordinary soil
Upto 3 m depth | 1 | Cum | - | - |
| 5 | Bedding of pipe
Laying concrete cradle bedding with M 15 Grade Cement Concrete as per Clause 1105 (i) | 1 | Cum | - | - |
| 6 | Plain Cement Concrete M 10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 | 1 | Cum | - | - |
| 7 | Providing and Laying Reinforced Cement Concrete Pipe NP 3 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
B) 1000 mm dia | - | Rm | - | - |
| 8 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203
Brick masonry in 1:3 cement mortar | - | Cum | - | - |
| 9 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204
I) In 1:3 cement mortar | 1 | Cum | - | - |
| 10 | Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
SBD04.pdf
Tender Documents • 4.29 MB
BOQ_82824.xls
BOQ • 0.25 MB
FOB04.pdf
Additional Documents • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .