Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | L1 | Accepted-AOC tcr | |
| 2 | Rejected-Technical KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | - | Rejected-Technical TC recommendation | |
| 3 | Rejected-Technical DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | MUKHERJEE AND CHATTERJEE CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 2.00 | Making complete arrangement for replacement of Head gear pully | 1 | No | 34,565 ₹34,565 Lowest |
| 3.00 | Dismantling of winding rope, old head gear pully with bush and block and lowering the same at ground level. | 1 | LS | 34,565 ₹34,565 Lowest |
| 4.00 | Lifting, Installation and alignment of head gear pully on head gear with its accessories and adjustment of winding rope | 1 | LS | 49,648.5 ₹49,648.5 Lowest |
| 5.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 21,380.13 ₹21,380.13 Lowest |
Tender Value
₹1.4 L
EMD Value
₹1,800
Closing Date
2 Sept 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Replacement of Head gear pulley of head gear structure of pit no. 6 of CM project at Nakrakonda Kumardihi B colliery under Bankola Area
2025_ECL_342250_1
ECL/GM/BA/E TENDER/25-26/ENM/81 Dt 23.08.2025
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Nakrakonda Kumardihi B Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,800
28 Nov 2025
23 Aug 2025
3 Sept 2025
23 Aug 2025
2 Sept 2025
23 Aug 2025
23 Aug 2025 - 27 Aug 2025
Amount
Item Description/ Heading
Making complete arrangement for replacement of Head gear pully
Dismantling of winding rope, old head gear pully with bush and block and lowering the same at ground level.
Lifting, Installation and alignment of head gear pully on head gear with its accessories and adjustment of winding rope
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .