| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-Finance | ₹8.8 L | L1 | Accepted-Finance Accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | K.RAMESH BABU L3 | Amma Systems L5 | Bharathi Raja L1 | E.BHARATHKUMAR L4 | MONIKA CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 21.18 | Cum | 260 ₹5,507.28 | 420 ₹8,896.38 | 250 ₹5,295.47 Lowest | 251 ₹5,316.65 | 255 ₹5,401.37 |
| 2.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 8.59 | Cum | 1,650 ₹14,180.26 Lowest | 1,950 ₹16,758.49 | 1,650 ₹14,180.26 Lowest | 1,650 ₹14,180.26 Lowest | 1,700 ₹14,609.97 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 8.59 | Cum | 5,200 ₹44,689.32 | 7,800 ₹67,033.98 | 5,100 ₹43,829.91 | 5,079 ₹43,649.43 Lowest | 5,110 ₹43,915.85 |
| 4.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 9.13 | Cum | 5,800 ₹52,960.94 | 8,600 ₹78,528.29 | 6,000 ₹54,787.18 | 5,797 ₹52,933.54 Lowest | 5,900 ₹53,874.06 |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.19 | MT | 78,000 ₹14,820 Lowest | 78,000 ₹14,820 Lowest | 91,000 ₹17,290 | 87,284 ₹16,583.96 | 85,000 ₹16,150 |
| 6.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items with cost and conveyance incluidng all other labour charges etc complete | 6.92 | Cum | 8,000 ₹55,369 Lowest | 11,800 ₹81,669.28 | 8,500 ₹58,829.56 | 8,615 ₹59,625.49 | 8,600 ₹59,521.68 |
| 7.00 | Centering with shuttering for all cc works using Ms sheet with cost and conveyance incluidng all other labour charges etc complete | 11.49 | Sqm | 500 ₹5,743 Lowest | 850 ₹9,763.1 | 525 ₹6,030.15 | 1,040 ₹11,945.44 | 500 ₹5,743 Lowest |
| 8.00 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. | 68.66 | Sqm | 1,300 ₹89,255.4 Lowest | 1,500 ₹1,02,987 | 1,450 ₹99,554.1 | 1,354 ₹92,962.93 | 1,350 ₹92,688.3 |
| 9.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 34.83 | Sqm | 270 ₹9,403.51 | 320 ₹11,144.9 | 275 ₹9,577.64 | 268 ₹9,333.85 Lowest | 280 ₹9,751.78 |
| 10.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete | 14.18 | Sqm | 260 ₹3,686.28 | 220 ₹3,119.16 Lowest | 255 ₹3,615.39 | 249 ₹3,530.32 | 260 ₹3,686.28 |
Tender Value
₹10.4 L
EMD Value
₹10,500
Closing Date
22 Jul 2026, 3:00 pmClosed
BDO VP
BDO KTR
Construction of Bus Shelter to Near Adidravidar Govt Hr Sec School at Mannivakkam Panchayat in Kattankolathur Panchayat Union
2026_RDTN_684441_1
3/2026/A5 dt 07.07.2026
Open Tender
Civil Works
Item Rate
90 days
BDO KTR
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹10,500
Yes
19 Aug 2026
8 Jul 2026
22 Jul 2026
8 Jul 2026
22 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 21.18 | Cum | - | - |
| 2 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 8.59 | Cum | - | - |
| 3 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 8.59 | Cum | - | - |
| 4 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 9.13 | Cum | - | - |
| 5 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.19 | MT | - | - |
| 6 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items with cost and conveyance incluidng all other labour charges etc complete | 6.92 | Cum | - | - |
| 7 | Centering with shuttering for all cc works using Ms sheet with cost and conveyance incluidng all other labour charges etc complete | 11.49 | Sqm | - | - |
| 8 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. | 68.66 | Sqm | - | - |
| 9 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 34.83 | Sqm | - | - |
| 10 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete | 14.18 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_822757.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_822757.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .