Tender Value
₹2.3 Cr
EMD Value
₹2.7 L
Closing Date
16 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
AGRA DIV
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure- VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.(Note: No other document than specified above shall be considered valid for evaluating this eligibility criteria).In case of non-submission of above documents, offer may be summarily rejected.
(a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the onein which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender,or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender,or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous tothe onein which tender is invited: (i) Three similar works each costing not less thanthe amount equal to30% of advertised value of each component of tender,or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender,or (iii) similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited througha works contract.
In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.(Note:In case of non-submission of above documents, offer may be summarily rejected).
Defination of Similar Work :- Execution of any Signaling work
49 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Documents to be submitted along with the tender.
Please submit your bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, and PAN Number. (Format attached)
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. (Note:In case of non-submission of above documents, offer may be summarily rejected).
The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) /registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. A separate power of 2.2.1 attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Apostille certificate.(Note:In case of non-submission of above documents, offer may be summarily rejected).
The tenderer will give full information ( in annexure-A) as to the date of retirement of such Engineer or gazetted officer from the said service and as to whether permission for taking such contract, or if the Contractor be a partnership firm or an incorporated company, to become a partner or director as the case may be, has been obtained by the tenderer or the Engineer or officer, as the case may be from the President of India or any officer, duly authorized by him in this behalf, shall be clearly stated in writing at the time of submitting the tender,if a tenderer is - i) be a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, whether in the executive or administrative capacity or whether holding a pensionable post or not, in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, OR ii) being partnership firm / joint venture (JV) / registered society / registered trust etc have as one of its partners/members a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, OR iii) being an incorporated company have any such retired Engineer of the gazetted rank or any other gazetted officer working before his retirement as one of its directors AND in case where such Engineer or officer had not retired from government service at least 1 year prior to the date of submission of the tender
If a tenderer or Contractor being an individual, have member(s) of his family or in the case of partnership firm/ company / joint venture (JV) / registered society / registered trust etc. one or more of his partner(s)/shareholder(s) or member(s) of the family of partner(s)/shareholder(s) having share of more than 1% in the 2.3.1 tendering entity employed in gazetted capacity in the Engineering or any other department of the railway, then the tenderer at the time of submission of tender, will inform the authority inviting tenders the details of such persons. ( in annexure-A)
An undertaking shall be submitted in form of Annexure-VA is to be given by attorney/authorized signatory/each member of Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. as the case may be. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. Note-1: Annexure VA should be submitted as per explanatory formats which are part of documents uploaded alongwith the NIT in the name of guidelines for filling of Annexure VA. Note-2: In case of non submission of above certificate, or submission of certificate either not properly filled in, or, in a format other than the prescribed format, shall lead to summarily rejection of your offer.
General Compliance
The accepted rates shall be deemed to include and cover all fees, taxes, duties, royalties, rent etc
Income Tax, Surcharge thereof, Goods & Service Tax (GST Act, 2017) and any other applicable tax shall be recovered from contractor's bill as per rule in force.
Implementation of GST Act, 2017 - Procedure for payment of Contractual bill is given in General Instructions attached in document. Please go through the procedure before submission of the offer.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Information regarding staff, Plant & machinery, past experience and ongoing work details
Please furnish list of plant and Machinery available on hand own and proposed to be inducted own and hired to be given separately for the subject work.
Please furnish list of Works on hand indicating Description of Work, Contract Value, Approximate value of balance work yet to be done and Date of award.
Please furnish list of Works completed in last seven financial years giving Description of Work, Organization for whom executed, approximate value of contract at time of award, Date of award and Date of Completion. Date of actual Start, Actual Completion and Final value of Contract shall also be given
Please furnish list of personal, organization available on hand and proposed to be engaged for the subject work.
If bid security is submitted in the form of Bank Guarantee, it shall be made in favour of Senior Divisional Finance Manager, North Central Railway, Agra. The format of Bank Guarantee is attached in Annexure VI A. The original Bank Guarantee should be delivered to this office within 5 working days before closing date for submission of bids.
Prior consent of Railway representative to be taken before procurement of material for supply item.
Guidelines for online Bank Guarantee verification should be followed as per attached document.
Tenderer (s) should attached the scan documents in support of minimum eligibility criteria along with the tender. No document in support of minimum eligibility criteria will be accepted/entertained after opening of tender.
Security Deposit: The Security Deposit shall be 5% of the contract value. The Bid Security submitted by the Contractor with his tender will be retained/encashed by the Railways as part of security for the due and faithful fulfillment of the contract by the Contractor. Provided further that, if Contractor submits the Cash or Term Deposit Receipt issued from a Scheduled commercial bank of India or irrevocable Bank Guarantee Bond from a Scheduled commercial bank of India, either towards the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security, to the Contractor. Balance of Security Deposit may be deposited by the Contractor in cash or Term Deposit Receipt issued from Scheduled commercial bank of India or irrevocable Bank Guarantee bond issued from Scheduled commercial bank of India, or may be recovered at the rate of 6% of the bill amount till the full Security Deposit is recovered. Provided also that in case of defaulting Contractor, the Railway may retain any amount due for payment to the Contractor on the pending "on account bills" so that the amounts so retained (including amount guaranteed through Performance Guarantee) may not exceed 10% of the total value of the contract. The Irrevocable Bank Guarantee submitted towards Security deposit shall be initially valid up to the stipulated date of Maintenance period plus 60 days and shall be extended from time to time, depending upon extension of contract granted in terms of Clause 17A and 17B of the Standard General Conditions of Contract. Note: Security Deposit deposited in cash by the Contractor or recovered from the running bills of a Contractor or submitted by contractor as Term Deposit Receipt(s) can be refunded/returned to the contractor, in lieu of irrevocable Bank Guarantee bond issued from scheduled commercial bank of India, to be submitted by him, for an amount equal to or more than the already available Security Deposit, provided however that, in a contract of value less than Rs. 50 Crore, such refund/ return of the already available Security Deposit is permitted up to two times and in a contract of value equal to or more than Rs. 50 Crore, such refund / return of the already available Security Deposit is permitted up to three times.
Performance Guarantee:- The procedure for obtaining Performance Guarantee is outlined below: (a)The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22ndday after the date of issue of LOA. Further, if the 60thday happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work.
The Tenderers having more than 20 labour, is required to obtain the labour license from the licensing Officer under Provision of Contract Labour (Regulation and Abolition) Act 1970 read with Contract Labour (Regulation and Abolition) Central Rules 1970. They should obtain a proper and valid labour license for the concerned work from the concerned Asstt. Labour Commissioner or licensing officer of the area and the photo copy of the labour license must be submitted to Railway for records . Failure to do so will attract legal action against the tenderer
In case any contradiction between general condition of contract & special conditions of contract will prevail over general conditions of contract.
If the tenderer(s) deliberately gives / give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
All Rules of NIT & Post LOA shall be governed by GCC & tenderer agree to adhere to it without any dispute.
Contractor will clear/clean the work site after completion of the work, to the satisfaction of site engineer.
All false work, staging etc. should be so erected, clamped and secured that these should not infringe / moving dimension and obstruct the railway traffic.
In terms of clause 26A.3 of GCC, the Contractor shall deploy atleast one Diploma Holder Engineers at site during the execution of work.
Special Conditions of contract for mandatory updation of Labour Data on Railway's Srakimkalyan Portal by Contract. Clause 54 & 55 of Indian Railway General Conditions of Contract deals with Wages to labour and action in case of default of contractor to payment of wages. In order to increase transparency in payment of Contract Labour wages and other payments, a web based application has been developed and hosted on website www.shramikkalyan.indianrailway.gov.in. All contractors are required to upload details of their LoAs, engaged workmen, wage payment details, PF/ESI details, bonus details etc., on monthly basis. This details so uploaded shall be available in public domain. In order to ensure prompt and proper uploading of details related to LoAs, engaged workmen, wage & other payment details. The special condition is as under:
A.Contactor is to abide by the provisions of Payment of Wages act & Minimum Wages act in terms of clause 54 and 55 of Indian Railway General Condition of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment in this portal. These details shall be available in public domain. The Registration/ updation of Portal shall be done as under: (a) Contractor shall apply for onetime registration of his company/firm etc. in the Shramikkalyan portal with requisite details subsequent to issue of Letter of Acceptance. Engineer shall approve the contractor's registration on the portal within 7 days of receipt of such request. (b) Contractor once approved by any Engineer, can create password with login ID (PAN No.) for subsequent use of portal for all LoAs issued in his favour. (c) The contractor once registered on the portal, shall provide details of his Letter of Acceptances (LoA)/Contract Agreement on shramikkalyan portal within 15 days of issue of any LoA for approval of concerned engineer. Engineer shall update (if required and approve the details of LoA filled by contractor within 7 days of receipt of such request. (d) After approval of LoA by Engineer, contractor shall fill the salient details of contract labours engaged in the contract and ensure updating of each wage payment to them on shramikkalyan portal on monthly basis. (e) It shall be mandatory upon the contractor to ensure correct and prompt uploading of all salient details of engaged contractual labour & payments made thereof after each wage period.
B. While processing payment of any 'On Account bill' or 'Final bill' or release of 'Advances' or 'Performance Guarantee/Security deposit', contractor shall submit a certificate to the Engineer of Engineer's representatives that " I have 14.1.1 uploaded the correct details of contract labours engaged in connection with this contract and payment made to them during the wage period in Railway's Shramik kalyan portal at 'www.shramikkalyan.indianrailways.gov.in' till_____ Month,_______ year."
Old GCC has been changed and replaced with new General Conditions of Contract-2022, which has been added in tender document. Please go through this new General Condition of Contract-2022 before bidding. In case of any discrepancy, contradiction with regard to GCC (except special condition of contract) in that case GCC- 2022 will be applicable.
Various Signalling works in connection with CTR/TTR/TRR and other track maintenance works in AGC-DHO, BHA-UDI and IDH-BXN sections (Under the jurisdiction of ADSTE/S/AGC of Agra Division).
AGRA-ST-2026-15
AGRA-ST-2026-15
Open
Works - General
12 Months
Agra, Uttar Pradesh
₹0
₹2.7 L
16 Mar 2026
20 Feb 2026
2 Mar 2026
143 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,30,40,108.09 | ||
| — | 22.00 | — | — | ||
| Supply of 24 fiber optical fiber cable straight joint enclosure (SJC) complete with all accessories along with enclosures with heat shrinkable splice protection sleeve as per RDSO spec. RDSO/SPN/TC68/2014 Revision 1.0, Amndt. 1.0 or latest. Splice losses in no case should be more than 0.1 dB. (Inspection by Consignee) | — | — | — | 1,21,147.62 | |
| — | 180.00 | — | — | ||
| Arranging JCB/580,JCB/3D model or higher capacity as per direction of Engineer in change for excavation of trenches including cutting & clearing of roots of trees etc.,in any type of soil . Back filling & ramming of the soil in trenches after cable laying .Note: Only working hours of JCB will be counted for payment (i.e. Start to Stop of working hours.) Maximum 8 hrs per day will be paid. The rate also inclusive of all labour cost, lead, life, taxes, fule, driver and other charges complete. | — | — | — | 2,83,181.4 | |
| — | 980.00 | — | — | ||
| Charging of secondary cell with contractor's own charging equipments including supply of sulphuric acid IS:1069-1964, installation supply and application of acid proof foam spray of approved type, on the terminals of charger batteries, all activities as per terminals of specifications and according to standard adopted for initial charging and installation of charged batteries in battery room in groups as per instrucction of engineer at site. (2V, 80AH/300AH).(unit , per 100 VAH =Numbers) | — | — | — | 2,76,497.2 | |
| — | 120.00 | — | — | ||
| Supply of uncharged Low Maintenance Lead Acid (LMLA) secondary cell, 2V ,300AH, shelf mounting type conforming to RDSO Specn.No.IRS:S-88/2004 or latest with inter cell connectors, nuts and bolts etc. (Inspection by RDSO) | — | — | — | 8,53,351.2 | |
| — | 709.00 | — | — | ||
| Maintenence of Signalling gears required for excecution of BCM/TTM/FRM or any other signalling work which includes: (1) Proper dressing of track lead jumpers as required by the Railways before and after BCM/TTM/FRM machine working. (2) All cables attended during work to be meggared and all damaged cables due to work to be replaced as per requirement of Railways (3) Preparatory work required for the work of Point renewal, removing, fixing, installation and testing of rodding set for point machine including all associated gears of mechanical/electrical points as per direction of Railway representative at site. (4) Any other s decided by Railways. The team to be provided for this work should comprise of: Fitter-1 no., Blacksmith- 1 no., Carpenter/Mason- 1 no. and Helpers- 5 no. (Day = per day per team). | — | — | — | 23,03,065.97 | |
| — | 119.00 | — | — | ||
| Erection, fitting and Rail connection of track lead junction box with contractor's fixing material including angle of size 40 x 40 x5 mm1200mm length. This will include drilling of holes for side connection.(supporting foundation as per site engineer must be made) The work shall be done as per instruction of Rly. Engineer at site. | — | — | — | 1,02,205.53 | |
| — | 3200.00 | — | — | ||
| Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. wide at bottom as per RDSO sketch No. SDO/CABLE LAYING/003, issued vide RDSO document no. RDSO/SI/G/2010 Version 1.1 dated 04.02.2014 or latest, alongside the track in normal soil/strata (including soft rock), conforming to distances as per cable route plan and refilling and ramming of loose soil. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately. The work shall be done as per the extant practice on North Central Railway and instructions of Railway Engineer at site. In case 1.2 m depth of trench is not achievable due to site conditions, specific approval of JAG/SG Officer will be required for each site where trench depth of 1.2m is not possible, only after approval of JAG/SG Officer proportionate payment can be done. | — | — | — | 2,80,864 | |
| — | 2444.00 | — | — | ||
| Horizontal Boring/Manual moling without damage to surface road /track for laying/isertion of DWC/GI/HDPE pipe. The bore shall be done at the depth of minimum 1400 mm from the ground level. The ground level shall be considered ignoring the bank height of the bank of the road. Note:- DWC/HDPE/GI Pipe Supply is not covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after DWC/HDPE/GI pipe is laid in the bore. | — | — | — | 26,47,560.76 | |
| — | 240.00 | — | — | ||
| Supply of Medium class GI pipes 100 mm dia (4.5 mm thickness) with thread collars as per IS 1239 (Part 1) 2004 or latest with coupling on culverts/bridges, perforated at a distance of 20 cm or less with 10 mm dia hole, or at any other locations as decided by Site Engineer. It includes supply of all material required for fixing arrangement. Contractor will also supply flexible/corrugated HDPE pipe at the end of GI pipe to protect the cables from sharp edges and sudden bends. (Inspection by Consignee) | — | — | — | 2,38,022.4 | |
| — | 240.00 | — | — | ||
| Laying and fixing of Medium class GI pipes 100 mm dia (4.5 mm thickness) as per IS 1239 ( Part 1) 2004 or latest with coupling on culverts/bridges, perforated at a distance of 20 cm or less with 10 mm dia hole, or at any other locations as decided by Site Engineer.The GI pipe is to be filled with chattered compound. It includes supply of all material required for fixing arrangement. Contractor will also supply flexible/corrugated HDPE pipe at the end of GI pipe to protect the cables from sharp edges and sudden bends. The laying and fixing to be done as per RDSO drawings no. SDO/cable laying/011 and SDO/cable laying/012, issued vide RDSO document no. RDSO/SI/G/2010 Version 1.1 dated 04.02.2014, or latest | — | — | — | 85,032 | |
| — | 2770.00 | — | — | ||
| Supply of Double Walled Corrugated (DWC) Pipe/duct with associated collars etc. as per RDSO Specification No. RDSO/SPN/204/2011 or latest anti-rodent & anti-oxidant and non flame propagating type in 6 meters straight length and of size 120 mm outer dia,& 103.5 mm inner dia. (The manufacturers, suppliers must produce valid IS license and should be certified under ISO 9000 and shall submit copy of certificate). One coupler with suitable rubber O-ring should be supplied with every 6m of pipe length. (The total quantity of above items is equal to no. of pipes supplied.) DWC pipe shall be marked at every 1 mtr length in such a way that manufacturer's name, vendor name and year of manufacture can be easily identified. (Inspection by RITES) | — | — | — | 18,18,754.3 | |
| — | 2.00 | — | — | ||
| Supply of Isolation transformer 10 KVA, input and output 230V AC 50 Hz Sine Wave Single phase. (Inspection by Consignee) | — | — | — | 1,53,357 | |
| — | 2.00 | — | — | ||
| Installation of Isolation transformer 10 KVA, input and output 230V AC 50 Hz Sine Wave Single phase. | — | — | — | 6,626.68 | |
| — | 430.00 | — | — | ||
| Supply of gauge tie plate insulation complete set each set consisting plate T-10372 = 1No., Bush T-10368=3 Nos. and washer - T-10371 = 6 Nos. (Inspection by Consignee) | — | — | — | 1,44,548.8 | |
| — | 430.00 | — | — | ||
| Supply of IRS Type point machine 'D'/'P' bracket insulation complete set consisting of the following:- Plate LH - S-3266-1 No, RH - S-3265-1 No., Plate S-8804- 1 No., Bush - S- 3199 - 4 Nos, Bush S-8813- 2 Nos. (Inspection by Consignee) | — | — | — | 1,96,123 | |
| — | 430.00 | — | — | ||
| Supply of Nylon Insulation set of IRS point machine 220MM as per attached Drg. No.1(Drawing PDF page Sr.no 2 and 6) - contains 15 Nos. [5 bush plus 10 washer], Drg. no.2 (Drawing PDF page Sr.no - 5)contains, 06 nos [bushes] and Drg. no.3 (Drawing PDF page Sr.no 1,3 and 4) contain 18 nos.[8 bushes plus 8 washer plus 2 Insulating plate]. (Inspection by Consignee) | — | — | — | 8,06,293 | |
| — | 3360.00 | — | — | ||
| Supply of 8 SWG GI wire (4 mm dia) suitable for Track circuit rail bonding as per RDSO spec. IRS: S 13 - 62 (Inspection by Consignee) | — | — | — | 2,57,577.6 | |
| — | 4100.00 | — | — | ||
| Supply of Disconnect Terminal block for four conductors with screwing cage/clamp type, sliding switch disconnect, as per RDSO spec. RDSO/SPN/189/2004 Ver. 3.0 or latest, for each conductor size up to 2.5 sq. mm, equivalent of M6 terminals. Each terminal block equipped with two markers, on top and bottom, an end plate, two end clamps and adequate lenght of rails for fitting terminal blocks. (Inspection by RDSO) | — | — | — | 7,90,521 | |
| — | 1350.00 | — | — | ||
| Lettering and Numbering of all S&T gears like Signals, Loc. Boxes, Pt. Machines, TLJBs, Block joints etc. Each item to be taken as one unit. | — | — | — | 1,15,533 | |
| — | 4500.00 | — | — | ||
| Fixing of ARA(M-6) Terminals /Screw less connectors / modular disconnect terminal blocks and fuse blocks on phenolic laminated sheets and fixing by stainless steel/brass nuts & bolts. This includes provision of two additional holes on the board on either side for cable conductor entry. The work shall be carried out a per instructions of railway Engineer incharge.(Supply of all above terminals has been covered separately). | — | — | — | 81,495 | |
| — | 7200.00 | — | — | ||
| Termination of Outdoor Cables (Main Cables /tail cables) at ARA/Disconnect type terminals provided in Apparatus Cases, Cable termination rack in relay room, station building, generator room etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All material required for this item will be supplied by contractor. The outdoor cable shall be terminated in Relay Room, DG Room, ASM Room etc under supervision and instructions issued by Engr. incharge of the work. | — | — | — | 1,06,344 | |
| — | 9860.00 | — | — | ||
| Supply of PVC insulated, jacketed wire rope for Track lead connections. The wire rope should be of galvanised steel, 6 mm dia, (6x19 stranded wire with steel core of 6 mm) sheathed with PVC. (Inspection by Consignee) | — | — | — | 4,34,628.8 | |
| — | 355.00 | — | — | ||
| Supply of 9/32 HSS Drill (Cutting Depth 35 mm Suitable for HM36 and Single Cut Weldon) Part No. RD7/2HSSD35 (Inspection by Consignee) | — | — | — | 99,215.4 | |
| — | 8.00 | — | — | ||
| Supply of hand track drill machine (Cycle type). (Inspection by Consignee) | — | — | — | 45,143.68 | |
| — | 220.00 | — | — | ||
| Supply of Retro-Reflecting sheet ultra lighting grade 18 color RED. (Inspection by Consignee) | — | — | — | 1,58,791.6 | |
| — | 220.00 | — | — | ||
| Supply of Retro-Reflecting sheet ultra lighting grade 18 color Yellow (Inspection by Consignee) | — | — | — | 1,58,791.6 | |
| — | 12.00 | — | — | ||
| Supply of lifting barrier Aluminum booms fabricated from 3mm (1" Section), 2.5 (2nd Section) & 1.9mm (3rd & 4th Section) aluminum sheets die pressed to from tapering channels with special stiffening bends in the channels. Two such channels then joined together with batten plates by riveting to form a tapering box section. (Inspection by Consignee) | — | — | — | 2,60,863.32 | |
| — | 100.00 | — | — | ||
| Supply of Limit switch new top roller type with 2 NO+2NC contact suitable for Heidz India electric lifting barrier (Inspection by Consignee) | — | — | — | 48,073 | |
| — | 100.00 | — | — | ||
| Supply of Limit switch new top roller type with 2 NO+2NC contact suitable for Globle electric lifting barrier. (Inspection by Consignee) | — | — | — | 45,461 | |
| — | 760.00 | — | — | ||
| Supply of Non deteriorating type, Round head type, low voltage cartridge fuse as per Spec No IRS: S -78/92 with latest amendments, 2A/4A/6A/8A/10A rating capacity. (Inspection by RDSO) | — | — | — | 93,632 | |
| — | 550.00 | — | — | ||
| Supply of Cartridge Fuse block, made of PBT, as per RDSO spec. No. IRS: S-75/2006 (Rev.2) or latest and as per Drawing. No. SA- 23748 (Alt.-4) or latest. (Inspection by RDSO) | — | — | — | 1,34,013 | |
| — | 1200.00 | — | — | ||
| Supply of Indicative type of fuse inserts with holder, 0.6 Amp, as per IRS S: 78/92 or latest, make Rapid, Malnad, L&T or similar of reputed make (Inspection by Consignee) | — | — | — | 83,244 | |
| — | 1105.00 | — | — | ||
| Supply of Indicative type of fuse inserts with holder, 1.6 Amp, as per IRS S: 78/92 or latest, make Rapid, Malnad, L&T or similar of reputed make (Inspection by Consignee) | — | — | — | 80,002 | |
| — | 570.00 | — | — | ||
| Supply of Indicative type of fuse inserts without holder, 0.6 Amp, as per IRS S: 78/92 or latest, make Rapid, Malnad, L&T or similar of reputed make (Inspection by Consignee) | — | — | — | 12,369 | |
| — | 500.00 | — | — | ||
| Supply of Indicative type of fuse inserts without holder, 1.6 Amp, as per IRS S: 78/92 or latest, make Rapid, Malnad, L&T or similar of reputed make (Inspection by Consignee) | — | — | — | 10,345 | |
| — | 10.00 | — | — | ||
| Supply,Installation,Testing & Commissioning of Electronic hooter(Red colour) with min 85dB output Approval-UL/LPCB/VDS Listed and shall comply to RDSO/SPN/217/2018 Ver 2. (Inspection by Consignee) | — | — | — | 23,597.7 | |
| — | 79.00 | — | — | ||
| Supply of Track Lead Junction Box(TLJB), 4 way, 250 mm x 255 mm x120 mm made from FRP, as per Drg.No. 20101/M(IRS) or latest, including brass bolts and hylam board sheet with terminals etc. The FRP material shall be as per RDSO spec. RDSO/SPN/151/1997 or latest.The technical specifications are as follows: (a) TLJB complete with cover to be in black/red/grey with all the holes required for mounting on FRP stump (vertical two for each FRP angle) HDPE pipe , cable etc. (b) Each TLJB shall have two bakellite terminal block fitted horizontally, each bakellite terminal block shall have two nickel chrome plate with brass terminal. Alongwith each TLJB , nickel chrome plated brass links(two nos.of adequate strength for vertical linking of the terminals to be supplied. (c) HDPE pipe alongwith two nuts for fixing on the TLJB hole . (d) The FRP stump for mounting the TLJB (Inspection by Consignee) | — | — | — | 4,21,845.78 | |
| — | 20.00 | — | — | ||
| Supply of Adjustable Track Feed Resistance 30 Ohms (Disc Type), Phenolic moulded base, as per RDSO Drg. No.SA-20161-66/M or latest. (Inspection by RDSO) | — | — | — | 45,616.4 | |
| — | 100.00 | — | — | ||
| Supply of timing belt for locking L 98 suitable for global devices ELB confirming to RDSO spec. No. RDSO/SPN/208/2012 Ver 2.0 make Global device. (Inspection by Consignee) | — | — | — | 42,776 | |
| — | 12.00 | — | — | ||
| Supply of True RMS reading Digital multimeter Rishabh 18 S/Fluke make. (Inspection by Consignee) | — | — | — | 1,09,610.76 | |
| — | 129.00 | — | — | ||
| Supply and installation of earth electrode as per standard practice and as per NCR Drawing no. S&T/CONST/6.4/97. It includes supply of GI pipe of 3m length. It includes connecting the earth electrode to the equipments which are required to be earthed including digging of earth pit 3 mtr deep and fixing earth electrode pipe, casting of cement concrete enclosure with cover (cover as per drawing no. S&T/CONST/6.3/97. It includes installation of 7 strand GI wires as earth lead wires, supported on MS flat size 5mm x 40 mm, soldering and nut bolt both, one end of both earth lead wire and MS flat to earth electrode and other end to Location boxes, block equipments, power equipments, cable sheath, signals etc. as per site requirement and as per instructions given by engineer incharge. (Inspection by Consignee) | — | — | — | 4,45,173.84 | |
| — | 8.00 | — | — | ||
| Supply of basic material to construct unit maintenance free earth as per RDSO Specs. No RDSO/SPN/197 Ver. 1.0 or latest to achieve a resistance less than 1 ohm. It consist of following: (a) Copper bonded steel electrode of minimum 3.0 m long, minimum 17.0 mm dia with copper bonding thickness of minimum 250 microns and UL listed and marked = 1 no. (b) Earth enhancement material supplied in sealed bags of minimum 10 kg = 3 nos. (c) Copper strip of 150x25x6 mm, to terminate earth rod = 1 no. (d) Copper strip of 300x25x6 mm (MEEB) = 1 no. (e) Copper strip of 150x25x6mm (SEEB) = 1 no. (ii) Supply of 35 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting main earth electrode to MEEB in the equipment room in duplicate.(minimum 10 meter) (iii) Supply of 16 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting MEEB to SEEB and SPD to MEEB (minimum 10 meter ) (iv) Supply of 10 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting various equipments to SEEB (v) Supply of copper lug sleeve for 3/16 cable. (Inspection by RDSO) | — | — | — | 1,40,605.52 | |
| — | 8.00 | — | — | ||
| Installation of Unit Maintenance Free Earth to achieve a resistance less than 1 ohm as supplied under item no. 13002 of Chapter 13 of SOR. It includes (i) Digging the earth to the required depth. (ii) Insertion of electrode. (iii) Filling of earth enhancing compound (Approx.30 Kg) (iv) Provision of exothermic weld connections to copper tape of 25 mm x 6 mm x 150 mm to the earth electrodes. All material tools and features required for weld will be arranged by contractor. (v) This also includes CC cover 1.5 ft x 1.5 ft. 1 ft wall thickness 2 inch with cover 3 inch thickness. Cables 35 Sq mm/ 16 Sq mm/10 sq mm for connecting earth to busbar, busbar to busbar and busbars to various equipments. Earth electrode of 17.20 mm dia and 3.00 meter long high tensile low carbon steel circular rods molecularly bonded with copper and outer surface (minimum copper bonding thickness of 250 micrones to made requirement of under writer's laboratories (UL) 467-2007 or latest. Copper strips of 150 mm x 25 mm x 6 mm to be welded with each earth electrode, copper strips of 300 mm x 25 mm x 6 mm for main equip- potential busbar, copper strips of 150 mm x 25 mm x 6 mm sub equip-potential busbar in relay room, power room and panel room. GI strip 25 mm x 2 mm for ring formation of earth pits Earth enhancement material in bags for each Earth Electrode. Inspection chamber of site 300 mm x 300 mm x 300 mm (Inside dimension) of approximate 50 mm thick with pulling hooks to cover the earth pits. Note: The installation of this item shall be carried out by the contractor as per RDSO Specn.No.RDSO/SPN/ 197 Ver 1.0 or latest. Typical RDSO approved drawings referred in the RDSO specification document are : (i) SDO/RDSO/E&B/001 for typical installation of Earth, (ii) SDO/RDSO/E&B/002 for typical bondong and earthing connections, (iii) SDO/RDSO/E&B/003 for typical arrangement for earth resistance measurements. | — | — | — | 58,215.92 | |
| — | 410.00 | — | — | ||
| Painting of two coats of Enamel paint over one coat of Red Oxide primer after scrapping and cleaning of the surface. Paint to be of reputed make Asian/Dulux/Berger or similar.App. Cases inside and outside to be done by Silver colour. (Apparatus Case Full) | — | — | — | 2,79,599.5 | |
| — | 380.00 | — | — | ||
| Painting of two coats of Enamel paint over one coat of Red Oxide primer after scrapping and cleaning of the surface. Paint to be of reputed make Asian/Dulux/Berger or similar.App. Cases inside and outside to be done by Silver colour. (Apparatus Case Half) | — | — | — | 2,35,668.4 | |
| — | 370.00 | — | — | ||
| Painting of two coats of Enamel paint over one coat of Red Oxide primer after scrapping and cleaning of the surface. Paint to be of reputed make Asian/Dulux/Berger or similar. (Main Signal post, base, unit and complete fittings) | — | — | — | 3,38,350.2 | |
| — | 380.00 | — | — | ||
| Painting of two coats of Enamel paint over one coat of Red Oxide primer after scrapping and cleaning of the surface. Paint to be of reputed make Asian/Dulux/Berger or similar. (Shunt Signal post, base, unit and complete fittings) | — | — | — | 1,48,181 | |
| — | 380.00 | — | — | ||
| Painting of two coats of Enamel paint over one coat of Red Oxide primer after scrapping and cleaning of the surface. Paint to be of reputed make Asian/Dulux/Berger or similar. (Point machine and ground connections, Point machine by Black enamel and ground connection by Red oxide) | — | — | — | 1,09,633.8 | |
| — | 60.00 | — | — | ||
| Cement concrete work for miscellaneous, unscheduled items in ratio 1:3:6 of cement, coarse, sand and aggregate Item includes excavation, ramming of CC by using vibrator, curing and plastering with cement and sand mixture in ratio 1:4 (aggregate will not exceed beyond 3.8 cm). The aggregate cement and sand will be supplied by contractor. | — | — | — | 3,06,577.2 | |
| — | 10.00 | — | — | ||
| Supply of adjustable spanners 12" of Taparia / Jhalani / Everest make. (Inspection by Consignee) | — | — | — | 9,053.4 | |
| — | 26.00 | — | — | ||
| Supply of adjustable spanners 15" of Taparia / Jhalani / Everest make. (Inspection by Consignee) | — | — | — | 26,481.26 | |
| — | 85.00 | — | — | ||
| Supply of RCC Earth pit of size (300mm*300mm*300mm*50mm). (Inspection by Consignee) | — | — | — | 1,42,449.8 | |
| — | 2134.00 | — | — | ||
| Earthing filling and ramming around the pulley stakes and pulley stakes and locations/signal foundation over the banks to strengthen the foundations. | — | — | — | 3,44,086.16 | |
| — | 5700.00 | — | — | ||
| Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes etc. as per the site requirement and as per approved cable route plan. This also includes laying of cables in track crossings & road crossings.(Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. | — | — | — | 38,988 | |
| — | 188.00 | — | — | ||
| Dismantling and Releasing of existing Location boxes/Apparatus cases/Jn boxes and other associated S&T fittings. All the released material will be transported to the SSE/Consignee depot. | — | — | — | 1,82,751.04 | |
| — | 20.00 | — | — | ||
| Supply of Digital AC/DC Leakage Clamp on meter, make Rishabh model ALCT 60A AC/DC or similar. (Inspection by Consignee) | — | — | — | 4,04,198 | |
| — | 88.00 | — | — | ||
| Supply of Z-190 Corium or zenith 225.0 m/g or similar (200 ml can). Specification-i] Appearance-Clear Plate ii] Odour-Slightly medicinal Vingour odour iii] Specific Gravity 1.04 iv] Flash Point- 90.5 v] Solubility-Insoluble in water vi] Max. Withstand temp-Up to 230 deg. Centigrade vii] Tensile Strength-145 PSI to 275PSI depends on applications. viii] Safe life-One Year ix] Toxity-Non in normal used x] Safe on plastic, safe on metal (Inspection by RITES) | — | — | — | 7,85,301.44 | |
| — | 598.00 | — | — | ||
| Cross trench for identification of the route of existing signlalling and telecomm cables. | — | — | — | 1,73,671.16 | |
| — | 22.00 | — | — | ||
| Casting, concreting and curing of foundation for Main Signal Post in the ratio of 1:3:6 as per NCR drg.No. TYP/013/14/SIG FOUND. dtd 12.11.2014 (total 2 sheets of drawing) issued vide NCR Letter no. S&T/NCR/DRG/TYP dated 13.11.2014, using standard size of foundation/galvanized anchor bolts complete, required for erection of colour light signal post. Anchor bolts complete should comply with the RDSO drg. no. SA 116 A/M. Item includes excavation, ramming of CC using vibrator, curing and plastering with 1:4 cement-sand mixture (aggregate will not exceed 3.8 cm). Aggregate, cement, sand and holding down bolts will be supplied by contractor. Any machines & tools, if required for execution of this item, will be arranged/provided by contractor. | — | — | — | 2,97,273.46 | |
| — | 8.00 | — | — | ||
| Supply of Apparatus Case/Location Box Full as per RDSO drg. no. RDSO/S-11500 or latest, with 'E' type lock and key ward no. 42, . The key and handle should be supplied at the rate of one no. per four Apparatus cases. The 'E' type key lock is as per RDSO Spec. IRS;S-30/64 or latest, RDSO drg. no.SA 3376/M or latest and Key is as per Drg. No. 3377/M or latest. Note: This item includes the supply of 2 Nos E Type Lock fitted on both doors, along with two Keys. (Inspection by consignee) | — | — | — | 2,20,098.72 | |
| — | 25.00 | — | — | ||
| Excavation, casting, curing of foundation and Installation and Erection of Apparatus case Full (App. Case as per drg. no. AGC/FULL LOC/2023/01 attached) with contractor's own frame, cement and other material in the ratio 1:3:6. 'E' type lock to be supplied and installed with App. case.This includes filling of location foundations with river bed sand and plastering on top with a mixture of 1:4 of cement and sand. It covers fixing of lamp holder , switch and lamp etc. in Apparatus Case. | — | — | — | 3,06,945.25 | |
| — | 2000.00 | — | — | ||
| Termination of Outdoor Cables (Main Cables /tail cables) at ARA/Disconnect type terminals provided in Apparatus Cases, Cable termination rack in relay room, station building, generator room etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All material required for this item will be supplied by contractor. The outdoor cable shall be terminated in Relay Room, DG Room, ASM Room etc under supervision and instructions issued by Engr. incharge of the work | — | — | — | 29,540 | |
| — | 194.00 | — | — | ||
| Supply of hand cuff lock of Godrej/Navtal or reputed make with key and as approved by site engineer. (Inspection by consignee) | — | — | — | 89,340.88 | |
| — | 4.00 | — | — | ||
| Supply of Insulation resistance tester, 100 Mega ohms, 500V DC, hand generator type. Make Meco/Motwane/Waco or similar. (Inspection by consignee) | — | — | — | 71,322.72 | |
| — | 2.00 | — | — | ||
| Provision of team consist of 03 Nos. of semi skilled/Unskilled Supervisory worker and 01 no. of skilled worker for excecution of BCM/TTM/FRM or any other signalling work | — | — | — | 1,83,852 | |
| — | 8.00 | — | — | ||
| Supply & Installation of program switches snap action bas mounting type along with cover and mounting bracket 63A-9 pole as per drawing no. RST-C. 106 or latest alteration. (Inspection by Consignee) | — | — | — | 71,505.12 | |
| — | 32.00 | — | — | ||
| Provision of team consist of 02 Nos. of semi skilled/ Unskilled Supervisory worker and 01 no. of skilled worker for execution's of signaling activities required for assistance of Engineering works. | — | — | — | 20,90,880 | |
| — | 200.00 | — | — | ||
| Supply of Push button elements of 1 No. Contact element Min. 5amp rating with screw type fixing of RDSO approved make. (Inspection by Consignee) | — | — | — | 26,602 | |
| — | 200.00 | — | — | ||
| Supply of LED indication light Yellow/Green/Red with operating voltage 110V AC/24V DC/110V DC as per site requirement. (Inspection by Consignee) | — | — | — | 79,566 | |
| — | 120.00 | — | — | ||
| Supply of Low maintenance Lead Acid Secondary Cell 2V/500AH capacity at 10hrs rate of discharge, assembled with tubular and pasted negative in hard rubber or PP-CP container with one float guide sealed type and one micro porous vent-cum-filling plug, inter cell connector,nuts-bolts and washers confirming to RDSO spec. no. IRS-S-88/2004 in dry and uncharged condition with maintenance tool kit along with each set of 12 nos. battery. (Inspection by RDSO) | — | — | — | 13,54,750.8 | |
| — | 200.00 | — | — | ||
| Supply of copper Tape 25 x 3 mm for interconnection of each electrodes as per RDSO Drawing SDO/RDSO/E & B/001 or latest (Inspection by Consignee) | — | — | — | 73,324 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AnnexureA.pdf
ATTACHMENT
BankDetail.pdf
ATTACHMENT
BidSecurity.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
GuidelineforfillingofAnnexureVA.pdf
ATTACHMENT
PaymentconditionAbove10Lakh.pdf
ATTACHMENT
GCCcorrectionslipPart1.pdf
ATTACHMENT
GCCcorrectionslipPart2.pdf
ATTACHMENT
GCCcorrectionslipPart3.pdf
ATTACHMENT
GCCcorrectionslip10.pdf
ATTACHMENT
Tenderdocument2022.pdf
ATTACHMENT
GuidelinesforonlineBankGuaranteethroughIPAS.pdf Guidelines online Bank Guarantee
ATTACHMENT
Drawinglocationboxfoundation.pdf
ATTACHMENT
GuidelinesforonlineBankGuaranteethroughIPAS.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .