| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.1 LAccepted-AOC | ₹49.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹54.1 LRejected-AOC | ₹54.1 L | L2 | Rejected-AOC L2 |
| 3 | L3₹55.8 LRejected-AOC | ₹55.8 L | L3 | Rejected-AOC L3 |
| 4 | L4₹56.5 LRejected-AOC | ₹56.5 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | SN. VENKATESAN L2 | R.Rajasekaran L4 | KANNAN AND CO L3 | PL R AND CO L1 |
|---|---|---|---|---|---|---|---|
| 1.00Name of Work :Renewal of Road From K.Pudupatti NH - 45B to Warapoor - Kilavayal (Via Servaikaranpatti Road ) | |||||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 3,180 | sqm | 6 ₹19,080 | 9 ₹28,620 | 6 ₹19,080 | 5.28 ₹16,790.40 |
| 3.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | 1,431 | cum | 118 ₹1.7 L | 145 ₹2.1 L | 140 ₹2.0 L | 123.2 ₹1.8 L |
| 4.00Advance Batch Work for Making up the undulation in the existing B.T Surface to an avarage thickness of 25mm using | |||||||
| 5.00 | Km 0/0 - 1/0 | 5.34 | sqm | 5,500 ₹29,370 | 4,410 ₹23,549.40 | 4,407 ₹23,533.38 | 3,878.16 ₹20,709.37 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 116.44 | cum | 2,840 ₹3.3 L | 2,830 ₹3.3 L | 2,828 ₹3.3 L | 2,488.64 ₹2.9 L |
| 7.00Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||||
| 8.00 | Km 0/0 - 1/0 | 135 | cum | 540 ₹72,900 | 600 ₹81,000 | 599 ₹80,865 | 527.12 ₹71,161.20 |
| 9.00 | Km 1/0 - 2/0 | 135 | cum | 540 ₹72,900 | 708 ₹95,580 | 609 ₹82,215 | 535.92 ₹72,349.20 |
| 10.00 | Km 2/0 - 2/650 | 87.75 | cum | 540 ₹47,385 | 630 ₹55,282.50 | 619 ₹54,317.25 | 544.72 ₹47,799.18 |
Tender Value
₹62.7 L
EMD Value
₹63,000
Closing Date
24 Feb 2026, 3:00 pmClosed
Project Director
DRDA,Sivagangai
Renewal of Road From K.Pudupatti NH - 45B to Warapoor Kilavayal (Via Servaikaranpatti Road) in S.Pudur Block
2026_RDTN_660733_1
RRM_Renewal_SPR_3
Open Tender
Civil Works
90 days
Sivagangai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹63,000
10 Mar 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A
Advance Batch Work for Making up the undulation in the existing B.T Surface to an avarage thickness of 25mm using
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 3.0 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Bituminous Concrete to 25/30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP using( Vibratory Roller)
Provision for Kilo Metre Stone
Provision for Hecta Metre Stone
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
3_Renewal_TenderDoc_SPR.pdf
Tender Documents • 0.94 MB
BOQ_792773.xls
BOQ • 0.38 MB