Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | -19.00% | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹7.6 L (4.75%)Admitted-Finance JAISALMER RAJASTHAN 345001 INDIA UDYAM RJ 18 0001538 | JAISALMER | RAJASTHAN | 345001 | -15.15% | ₹1.7 Cr+₹7.6 L (4.75%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹36.6 L (22.8%)Admitted-Finance | -0.50% | ₹2.0 Cr+₹36.6 L (22.8%) | L3 | Admitted-Finance |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
20 Aug 2026, 6:00 pmClosed
GM RSRDC LTD JAIPUR
GM RSRDC LTD SETU BHAWAN, JHALANA DOONGARI, JAIPUR
Construction of Cement CocreteRoad work on Chomu-MahlaBOT Road on Various Stretches(SH-SB, SH-19, SH-8A and ODR02) (Km. 4/00 to 82/282)
2026_RSRDC_588521_1
RSRDCC NIT 313/2026-27 Dated 14.08.2026
Open Tender
Civil Works - Roads
Percentage
240 days
Chomu-MahlaBOT Road
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹2,360
PD RSRDC UNIT IV JAIPUR THROUGH NEFT/RTGS/IMPS
₹4.0 L
27 Aug 2026
15 Aug 2026
21 Aug 2026
15 Aug 2026
20 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses | 428.4 | Cum | 69 | ₹29,559.6 |
| 2 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 560.7 | Cum | 515 | ₹2,88,760.5 |
| 3 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400- 1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By
mechanical means with a lead of 1 km. For Grading-III Material
For all Rajasthan except Bikaner, Churu, Hanumangarh and Sriganganagar | 554.9 | cum | 738 | ₹4,09,512.51 |
| 4 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400- 1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By
mechanical means. For Grading-I Material For All Rajasthan except Bikaner,Churu,Hanumangarh and SriGanganagar | 1,047.92 | Cum | 773 | ₹8,10,038.29 |
| 5 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. For all Rajasthan except Bikaner. | 968.75 | Cum | 2,418 | ₹23,42,443.55 |
| 6 | Construction of un-reinforced, plain cement concrete pavement M-40(Grade), thickness as per design, over a prepared subbase, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5mm, mixed in a in fully Automatic Computerised Batching Plant compatible with Printer and Pen Drive and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C.from transit mixer to site of laying, with all lead and lift including cost of admixture s in recommended portion as per IS9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thickpolythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, seal ant near approaches to bridge/culvert and construction joints, admixture s as approved, curing of concrete slabs for 14 days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 with all required equipments (Dowel Bars and Tie Bars will be paid separately). | 2,009.7 | Cum | 5,375 | ₹1,08,02,137.5 |
| 7 | Providing and Fixing of Dowel Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. | 22,478.4 | kg | 66 | ₹14,83,574.4 |
| 8 | Supplying, fitting, and placing TMT bar reinforcement (Primary Steel) in Foundation, Substructure and super structure at any level complete as per drawing and MoRTH specifications Clauses 1009, 1600 and 2302 | 1.07 | tonnes | 80,669 | ₹86,522.08 |
| 9 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. | 500 | Sq.m | 424 | ₹2,12,000 |
| 10 | Supplying & Fixing of Cat’s Eye made of aluminium alloy size 75x100x22 mm having 21 biconvex lenses embedded in
circular disk of ABS plastic on each side. | 740 | Each | 248 | ₹1,83,520 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.84 MB
bankdetailsNIT.pdf
Tender Documents • 0.51 MB
agreement.pdf
Tender Documents • 0.45 MB
BOQ_1045088.xls
BOQ • 0.29 MB
DLPCircular28.pdf
Tender Documents • 1.28 MB
spl-tc.pdf
Tender Documents • 0.24 MB
various_Circulars_Office_Orders.pdf
Tender Documents • 0.26 MB
AnnexureABCDandRTPPAct.pdf
Tender Documents • 8.80 MB
EngineersCost180826.rar
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .